The Download link is Generated: Download F-35 JOINT STRIKE FIGHTER


GAO-15-364 F-35 Joint Strike Fighter: Assessment Needed to

Apr 14 2015 We collected and analyzed program acquisition cost estimates and reviewed total program funding requirements to project annual funding.



F-35 Joint Strike Fighter (JSF) Program

May 2 2022 The F-35 program is. DOD's largest weapon procurement program in terms of total estimated acquisition cost. Current. Department of Defense (DOD) ...



GAO-21-105282 F-35 JOINT STRIKE FIGHTER: Cost and Schedule

Jul 13 2021 development to full production)



GAO-20-339 F-35 JOINT STRIKE FIGHTER: Actions Needed to

May 12 2020 program's total baseline cost.14 Beyond this Block 4 increase



GAO-21-439 F-35 SUSTAINMENT: DOD Needs to Cut Billions in

Jul 7 2021 The F-35 is also DOD's most ambitious and costly weapon system in history



UNCLASSIFIED F-35 Lightning II Joint Strike Fighter (JSF) Program

Dec 30 2019 The F-35 Program is a joint DoD program for which Service Acquisition Executive Authority ... Total Acquisition Cost - Total Program.



GAO-22-105128 F-35 JOINT STRIKE FIGHTER: Cost Growth and

Apr 25 2022 Figure 3: Reported F-35 Total Program Acquisition Costs since. 2012. 9. Figure 4: F-35A Aircraft Unit Costs Decreased Over Time



F35 SUSTAINMENT DOD Needs to Cut Billions in Estimated Costs

Jul 7 2021 procuring 2



GAO-18-321 F-35 JOINT STRIKE FIGHTER: Development Is Nearly

Jun 13 2018 With estimated total acquisition costs of over $406 billion for the entire program



GAO-22-105128 Accessible Version

https://www.gao.gov/assets/730/720191.pdf