a cross over from dinghy to yacht (manual sheeting 2:1 – no winches) featuring a integrated outhaul tackle and one reef line adjustable genaker pole ...
Copyright North Sails One Design. All Rights Reserved. 6. Setting the outhaul. Tightening the preventer for light air - two twists.
Instructions for rigging. Conditions for valid guarantee. 1 designed for fractionally rigged ... Outhaul: Used to adjust the foot of the mainsail.
2020. febr. 4. The ideal position can vary between boats due to rig sail and batten designs. It is recommended to place the outhaul stop 500 mm from the aft ...
Sailworks Inc. 2000 y Design: Bridgeworks ® Photography: Darrell Wong The luff and boom lengths listed are intended as a guide to rig assembly and sail ...
Please read it carefully and familiarize yourself with it and the boat before rigging and sailing. You have purchased a high performance racing catamaran and as
NOTE: Each Retro size is designed and balanced on a specific Sailworks mast to instructions enclosed with the adjustable outhaul for setup and use.
Mast is also equipped with two strap eyes at the mast base a vang lug and a boom gooseneck fitting. The J/70 boom is equipped with an adjustable outhaul
2020. jan. 1. construction manual and is subject to a World Sailing approved manufacturing control system. A hull a hull appendage
make when rigging a sail is which mast you Sailworks sails are designed around an ... instructions enclosed with the adjustable outhaul.
The factory set up for the outhaul runs through a stopper and requires a winch for adjustments Doyle Sailmakers have developed a simple and easy to use cascading outhaul system for the Beneteau- 36 7 This system can either be a 12:1 or easily converted for Heavy Air to a 24:1
5 Rigging the Outhaul: 1 Locate the outhaul line Tie a stopper knot in one end Lead the free end of the line through the port hole in the boom end cap (? gure 17) 2 Continue the line through the clew grommet and back through the open hole in the boom cap (? gure 18) 3 Lead the line forward along the starboard side of the
The adjustable outhaul kit comes with one piece 4mm adjusting line two pieces of 5mm tensioning line two pulleys plastic ClamCleat™ bands two rubber filler pieces four 8 gauge stainless steel screws and two coated aluminum ClamCleats™ You will use the rubber spacers if you want your cleat band to be on the bare carbon
this Tuning Guide provides a giant step toward achieving competitive speed in your class be sure to contact your North representative about the latest Farr 30 tuning developments Contents Pg 3 Deck Layout Pg 4 Setting Up the Rig Pg 7 Tuning Chart Pg 8 Mainsail Pg 9 Jib Pg 10 Asymmetric Spinnaker Pg 11 Symmetric Spinnaker
Adjustable downhaul kit RADRSX Ball Bearing Roller (2) REMRSXBB Monocoque Carbon BOOM RIG BAG SPECS: BOARD BAG SPECS: PRODUCT CODE Board Bag GNPRSXBB ROUNDED EDGES: Provide protection to your feet and board ANTI CHAFE PIN: A steel pin under the plastic bridge (right above the clamp-cleat) stops the plastic chafing EFFICIENT BUTTON and
If more than one steering station is installed the fill-vent plug on all but the uppermost helm must be replaced with a non-vent plug which is included in a dual station fitting kit (See page 14) Determine desired mounting position Ensure that the steering wheel will not interfere with other functional equipment Check for
Outhaul block replacement kit Instructions for fitting the following outhaul blocks Boom Block 120/62 538-860-01 143/76 538-861-01 171/94 538-862-01 This kit contains Block Sikaflex Messenger lines Instructions Tools required Screwdriver (Phillips/Torx) Adjustable wrench or shackle key Needle and thread (for joining messenger lines) Knife
5) Adjustable outhaul Get rid of the elastic and tie the front end as shown above Note also the outhaul block is tied around the mast If it is tied to the blue plastic block on the boom you can pull the boom off the mast at the wrong moment! This will make it much easier to adjust whilst racing
The TDS-10SH AC top drive is a single motor top drive developed for use in a variety of land and workover rig applications It is designed around a 400-hp alternating current (AC) drilling motor (CE and ATEX certified) with a hoisting capacity of 250 tons and a continuous drilling torque rating
To install the inhauler secure the shockcord to the boom cleat and pass back and under the boom cr ossing up to and through the clew Pass the shockcord back down and under the boom back up t o the cleat forming an X on the bottom side of the boom Tie off the shockcord to the boom cleat