Meter mounting equipment in grouped installations shall be installed to provide a minimum distance of 10-inches between meter centers for alternating current meters and 15-inches for direct current meters A minimum distance of 6-inches is required between AC meter equipment |
Specifications for Electric Installations
The Customer Guide to Electric Service Installation is a Guide to Con Edison requirements and specifications for establishing electric service to or remodeled applicant installations new In addition to the utility requirements local or state officials ma y stipulate additional provisions for the installation of equipment and materials that are |
SME Revised: December 2022 Rev 17
The Con Edison System For more than 180 years Con Edison has served the world’s most dynamic and demanding marketplace – metropolitan New York while maintaining a safe and reliable natural gas supply to more than 1 1 million gas customers We have employees on duty 24 hours a day 365 days a year to ensure the safety and reliability |
Do I need to submit a design request to Con Edison?
Any indoor installation, service head valves, pressure regulators (where required), meters and associated valves plans designs requests must be submitted to and approved, in writing, by Con Edison. Entire section of guidelines was rewritten by Gas Engineering to clarify Con Edison position on gas service requirements. Refer to pages 34 through 41.
Does Con Edison require a pressure test affidavit?
Gas Service Authorization or Blue Card will be required. The Pressure Test Verification Affidavit can be found on the Con Edison Energy Services Resource web-site located at or refer to Applications and Affidavits | Con Edison or in the Exhibits at the end of this book. Requires a Meter Piping Pressure Test and OQ Affidavit.
- 23 - Con Edison
Outdoor meter equipment may be placed to within 12-inches of a gas meter. See page 32A “Spacing Requirements-Gas and Electric Meters/Outdoor and. Indoor”. |
Specifications for Electric Installations Consolidated Edison Co. Inc
Products 200 - 400 M. Spacing Requirement between Gas and Electric Meters ... height clearance shall be 2-feet-0-inches from the bottom CT in the cabinet |
Specifications for Electric Installations Consolidated Edison Co. Inc
Products 200 - 400 M. Spacing Requirement between Gas and Electric Meters ... The height of current transformer meters installed together with current ... |
Specification EO-8746-B
CENTER LINE OF METER. REFER TO MES-394 IN NYC INSTALLATION SHALL MEET REQUIREMENTS OF THE ... MAST SHALL BE ERECTED AT A HEIGHT NECESSARY TO PROVIDE. |
Specifications for Electric Installations Consolidated Edison Co. Inc
Products 200 - 400 Consolidated Edison Company of New York (Con Edison) ... M. Spacing Requirement between Gas and Electric Meters. Section V. |
A Customer Guide to Natural Gas Service Installation
Dec 6 2016 The Meter Pressure Test. Verification Affidavit form can be found on the Con Edison Energy Services Resource web- site located at https://www. |
G-704-1 TITLE: GAS METER AND REGULATOR INSTALLATION
Mar 22 2016 technical experts and Con Edison's subject matter experts. 2) Section 2.0 ... requirement for new rotary and turbine meters. |
Consolidated Edison Metering Solutions
(Use Selection Chart #1 and. Specification Chart #1). Knowing the number of meter positions and the height and width requirements |
MES-528.pdf
Sep 14 1988 ALL METER. MOUNTING EQUIPMENT MUST COMPLY WITH CON EDISON INSTALLATION STANDARDS AND. SPECIFICATIONS AS WELL AS APPROVED INSPECTIONS BY ... |
Request for an Electrical Inspection Checklist
Is the meter pan bonded installed and wired to Con Edison Specification? Is the standpipe and mast height installed to Specification? |
Specifications for Electric Installations - Con Edison
Products 200 - 400 · L Seals M Spacing Requirement between Gas and Electric Meters The height of current transformer meters installed together with current |
CON EDISON EQUIPMENT CON EDISON APPROVED METER
195 CON ED FOR 3 PHASE 4 WIRE WYE FORM 9S METER SOCKET, IS PROVIDED PREWIRED HEIGHT IS 26 25” FROM BOTTOM OF ENCLOSURE TO |
Specifications for Electric Installations
Products 200 - 400 · Consolidated Edison Company of New York (Con Edison) A – Outdoor electric metering is a requirement on 1, 2 and 3 family homes The height of current transformer meters installed together with current transformer |
Consolidated Edison Metering Solutions - Siemens
Introduction Siemens Industry, Inc Consolidated Edison Metering Solutions Selection Application Guide or in the Consolidated Edison Requirements for Electric Height Width Depth Max tenant breaker (Amps): 125 WMN22125J |
Electrical Service Requirements (ESR) - Southern California Edison
26 avr 2019 · Service or Meter Switch — General Requirements 1–24 Height of Point-of- Service Drop Attachment on the Customer's Structure 2–8 4 0 |
Gas Meter Equipment - The Plumbing Foundation City of New York
The customer shall immediately notify Con Edison of any suspected leakage or escape of gas by calling A - Outdoor gas metering is a requirement on one (1), two (2), and three (3), family residential to 1½-inches in height is recommended |
Electric Service and Digital Meter Installation Requirements - OUC
Multiple Position (Ganged) Meter Center Requirements 35 OUC Meter NEC and local authority standards on installations that it serves Under no land wire (Not CT'ed); contact OUC Electric Distribution, 407 434 4111 or email The maximum height of a CT Cabinet shall be 6 foot at the top The minimum |
Section 5 - DTE Energy
9 nov 2020 · meter enclosures except as shown on service equipment assembly drawings Detroit Edison adopted the electrical industry standard for meter enclosures Detroit Mounting height must conform to DECo requirements |
PIN 847314_ConEd Utility Package - NYSDOT
10 oct 2019 · NYSDOT Items for Con Edison Gas Work – 5 Pages • Preliminary Layout for 318 Building Code Requirements for Reinforced Concrete type using ink with font size not less than 2” height to identify each adapter as following Exception: Services to outdoor meters do not require duct sealing inside the |