coned plp meter
Where should conduit be placed in a meter PAN?
Cap ends should be flush with surface Conduit Placement: 11-24” from center of meter pan to side, 6” from either side of meter bank enclosure. Conduit shall be in front of face of meter pan. Closets shall include conduit in design to meet all requirements
What if a shared meter is present?
If our investigation confirms that a shared meter is present, we must provide written notice of the condition to the tenant, the owner, and any other party receiving service through the shared meter. The owner must correct the condition within 120 days.
Can meter sockets be bypassed?
Where socket meters are to be installed for residential customers, the meter sockets can be equipped with bypass facilities at the customer’s request. The distance between a current transformer cabinet and the associated meter equipment shall not exceed 10 feet, without prior company approval.
Application for Services
with the provisions of the applicable (electricity or gas) Con Edison rate schedule. ACCESS TO METERS: If you do not control access to the meter(s) ... |
Specifications for Electric Installations Consolidated Edison Co. Inc
Products 200 - 400 Con Edison will furnish meter adapters when requested by the contractors. In areas where Con Edison supplies both gas and electric it is the ... |
Specifications for Electric Installations Consolidated Edison Co. Inc
Products 200 - 400 Con Edison will furnish meter adapters when requested by the contractors. In areas where Con Edison supplies both gas and electric it is the ... |
- 23 - (7-12-07) SECTION VII METERING INSTALLATIONS 1
connect and maintain such meter or meters as are necessary for metering electric energy and demand for Con Edison billing purposes. |
Specification EO-8746-B
CENTER LINE OF METER. REFER TO MES-394. CHECKED BY. PIPE MAST. SHALL BE. SECURELY. FASTENED. TO BUILDING. FRAMEWORK. SEE NOTE 11. SCALE. CONSOLIDATED EDISON |
Your Rights and Responsibilities as a Nonresidential Customer
Mar 12 2022 Meter Access. Customers who do not control meter access must notify Con Edison of the responsible party. You may be subject to penalties if Con ... |
APPLICATION FOR SERVICE1.
As a Con Edison customer you agree to pay for service supplied at the rates charges |
Con Edison
Sep 10 2021 Edison Company of New York |
Con edison approved meter sockets
ALL WIRING IN ACCORDANCE WITH CON EDISON MES #195 195 CON ED FOR 3 PHASE 4 WIRE WYE FORM 9S METER SOCKET |
NEW YORK SHARED METER LAW
A “shared meter” is a utility meter that measures gas electricity or steam service to a tenant's dwelling |
Specifications for Electric Installations - Con Edison
Products 200 - 400 · Applicant electric service and meter installation arrangements are subject to Con Edison's review and approval Applicants should submit a |
23 - (7-12-07) SECTION VII METERING - Con Edison
The company will furnish, install, connect and maintain such meter or meters as are necessary for metering electric energy and demand for Con Edison billing |
NEW YORK SHARED METER LAW - The Public Utility Law Project
A “shared meter” is a utility meter that measures gas, electricity or steam service Rendered in Favor of Mr Patrick Guzzi and Consolidated Edison Company of |
OCT 24 2011 - HEIGHTS REAL ESTATE COMPANY
24 oct 2011 · PART SUPPLIED: PLP CASE ID # Meter bars Lockable Riser valves are to be permanently marked to indicate part supplied 14 Con Edison inspection and gas service installation services are provided at no charge |
JUN 2 2 Mg JUN 2 2 LU 41
18 jui 2012 · Consolidated Edison Company PLP CASE ID # 1210419 SERVICE CLASSIFICATION # 031 NEW Gas Service will be installed by Con Edison 3 This is a preliminary layout, gas meters regulators will be determined |
Handbook for Multifamily Buildings - NYCgov
3 oct 2016 · meters, buildings consistently reduce energy Con Edison, Multifamily Energy Efficiency Program: www bit ly/29Teg7j The Participation Loan Program (PLP) provides low-interest loans and/or tax exemptions to multifamily |
ADVISORY BOARD CALENDAR - NYCgov
12 juil 2017 · Contact Con-Edison regarding Blue Book requirements 12/4/19 Swap Dwg 1) Show available short circuit current and AIC rating of meter boards 2) Comply section 2) Show bus size in "PLP" panel 3) Show available |