installation standards iapmo is 5-2006 and 9-2006: thermal expansion and contraction may be controlled by offsets, expansion joints, or restraints, regardless of the method utilized the following conditions must be met: l support, but do not rigidly restrain piping at changes of direction 2, do not anchor pipe rigidly in walls 3
NO 5-2006 May 12, 2006 TO: Sheriffs, Jail Administrators, County Clerks, County Attorneys RE: SUBSTITUTE JAIL ORDERS - PROCEDURES FOR TRANSFERRING INMATES FROM ONE COUNTY TO ANOTHER THIS CHAIRMAN’S MEMORANDUM REPLACES AND SUPERCEDES #2003-13 ISSUED SEPTEMBER 16, 2003
JAN - 5 2006 SECNAV INSTRUCTION 5800 llB From: Secretary of the Navy Subj: VICTIM AND WITNESS ASSISTANCE PROGRAM (VWAP) Ref: (a) DOD Directive 1030 1 of 13 Apr 04 (b) DOD Instruction 1030 2 of 4 Jun 04 (c) 10 U S C 47 (d) Manual for Courts-Martial, 2000 (e) OPNAVINST 5800 7 (f) MCO 5800 15A (LEGADMINMAN)
May 5, 2006 Request #06 105 Topic/Issue: Request to establish a new code for a transfer board, trade name: SafeSlideBoard™ Background/Discussion: According to the requester, this item is a replacement armrest for wheelchairs that can be lowered with one hand for use as a transfer board It is needed by wheelchair users that
MOR FAQs-UPDATED
5/5/2006 2 4A The finding must include the condition, criteria, cause and effect as well as the required corrective action as stated on the Summary Report direction for findings Below is a sample write-up for a finding Condition: The following are examples of deferred maintenance items observed during a walk through of the property:
ANSI/SIA A92 5 - 2006 American National Standards Institute 11 West 42nd Street New York, New York 10036 ANDARD for for Boom - Supported Boom - Supported Elevating Work PlatformsElevating Work Platforms Licensed to Troy Boettcher ANSI order X_38834 Downloaded 1/16/2008 8:31 AM Single user license only Copying and networking prohibited
DoDD 3030 01, March 5, 2006 7 1 2 Establish and maintain effective liaison with the other DoD Components (and, after appropriate notification, with subordinate commands and installations, as required) for the timely exchange of information and the coordination of realignments, economic adjustment plans, and joint land use studies policies 7 1 3
TSR2006_Annexs1_5 indd 112TSR2006_Annexs1_5 indd 112 4 5 2006 16:12:544 5 2006 16:12:54 113 5 2 3 There should be proper preparation and planning before validation is