Depending on spec, Sportage, Niro Hybrid, Picanto and several Ceed variants have a lead time of between 10 and 25 weeks depending on specification. TheĀ ...
The four-month average takes into account a transit time of between two and eight weeks for some models. The brand also warned of exceptionally strong demand for plug-in hybrid and electric models, which means longer lead times for these in many cases.