Jun 29, 2017 · WorKshoP, studio, or relaxatioN sPace choose a shed that Will meet Your Needs 10 – 20 Years doWN the road to determiNe Your shed size, laY out all the oBjects You’ll WaNt iNside rememBer, You caN maximize sPace With lofts or shelviNg determiNe door PlacemeNt, aNd rememBer the doors must Be Wide eNough for the items You WaNt iNside Be sure
The Garden Storage Shed is an attractive solution that you can build yourself it has space for lawn and garden tools and a counter that’s perfect for potting plants You can even get a head start on your vegetable and flower gardens in the greenhouse window The feeling of spaciousness inside belies the shed’s 8- x 12-foot exterior
If the shed will be placed beside another building or line (fence, driveway, wall, etc ), be sure to take measurements from the existing line to position the shed base exactly parallel For an 8x12 shed, lay out the floor plywood so the long side (8’) of each plywood piece is parallel to the short side (8’) of the shed base
door on the inside of the door frame to act as a draught strip 11 From inside the shed remove the 3 pieces of beading (1/2” x 3/4”) from each window and insert the glass into the opening from the inside of the shed Replace the beading and secure in place 12 These instructions cover 90 of the building which we do If they do not appear
reasonable fee, Tuff Shed can help create a level building foundation by adding concrete blocks and wood shims beneath the structure Tuff Shed does NOT dig into the ground to level a building If a small amount of leveling is necessary (up to 4”), it will be provided by Tuff Shed at no charge If more substantial leveling is required,
STEP 5 ROOF SHEATHING AND FINISH SHINGLING STEP 5A OPTIONAL STEEL ROOF AND FINISH TRIM Place 12' trusses 24" on center using a 2×4 temporary brace On 10' wide building, cut truss tails to 12" on both sides This will maintain the 1' overhang as shown on page 4 Make sure trusses are plumb and square, then apply roof sheathing
- Customers appropriate building permit and setbacks requirements. Contact us immediately if you need help.THE PLANNING PROCESS
- We will begin pre-fabricating your building several days in advance of the installation. At this time, we will begin placing the rough openings for items like doors, windows and vents.
- If changes or cancellation occurs within 5 days of installation, a this point, building materials have already been ordered, inventoried and have potentially been pre-fabricated,
covered by warranty. - Painting is one of the easiest Ɉyears. We recommend using high quality materials like PPG Paints.
An out of level site will force our installers to stop work and collect an additional leveling fee prior to resuming.
the compressors that power their tools. Inspect the building before the installers leave for the day. It may surprise you - but like most home builders, the sleet will most likely not prevent installation. Ask for details.
It's not a mistake that nails are poking through the roof on the inside of your building. This is necessary due to building codes requiring shingle Ɉperformance of the roof.
surface. steel with "skirting" made from siding. While we can add a skirting, we don't recommend it, since wood siding material contacting the ground can wick up moisture into the building.
We use dimensional lumber for wall and roof framing that has been dried, then stored in a controlled environment (our factories) prior to installation. It is unlikely that this wood will have a uniform appearan
ce, Ɉthe structural integrity of the building. We strive to make the building weathertight. But they are not airtight. Air PAINT painting exterior surfaces (siding and trim).