Initial Study for San Diego Gas & Electric Company’s iv Environmental Science Associates Application No 97-12-039 LIST OF TABLES (Continued) 4 5 7 Criteria Air Pollutant Concentrations Near the South Bay Power Plant, 1993–1997 4 5-23 4 5 8 South Bay Power Plant Fuel Usage Characteristics 4 5-24
Environmental Science Associates (ESA) 2018 Summary of LARA Model for the El Monte Sand Mining Project (Memorandum) July San Diego County 2011a San Diego County General Plan, adopted 3 August 2011, Chapter 3: Land Use Element _____ 2011b San Diego County General Plan, adopted 3 August 2011, Chapter 5: Conservation and Open Space Element
Wiedlin & Associates, Inc Applications in Groundwater Science P O Box 910462 San Diego, CA 92191-0462 Ph 858 259-6732 1 INTRODUCTION The development and operation of a photovoltaic (PV) solar facility to be located on San Diego Gas and Electric (SDG&E) owned property in Ramona, California has been proposed (MUP-14-013)
Environmental Science Associates (ESA) San Diego Gas and Electric Artesian 230kV Substation Expansion Project Final Initial Study/Mitigated Negative Declaration Prepared for the California Public Utilities Commission (CPUC) March 2019
Annual Compensatory mitigation Monitoring Report, Prepared for City of San Diego, Storm Water Division, March 2020 Helix Environmental Planning Inc , and Environmental Science Associates, El Cuervo del Sur Phase II Conceptual Mitigation and Monitoring Plan, Prepared for the City of San Diego Transportation