[PDF] TS 138 331 - V16.1.0 - 5G; NR; Radio Resource Control (RRC





Previous PDF Next PDF



3GPP Release 17: - Completing the first phase of the 5G evolution

24 Mar 2022 NR NTN and NTN IoT. • Improved IIoT positioning



Spectrum for 4G and 5G: Global Update on 5G Spectrum Presentation

14 Tem 2016 5G NR bands: no confirmed plans ... www.vodafone.com/content/dam/group/policy/downloads/Vodafone_Group_Call_for_the_Gigabit_SocietyFV.pdf; ...



TS 138 212 - V15.2.0 - 5G; NR; Multiplexing and channel coding

5G;. NR;. Multiplexing and channel coding. (3GPP TS 38.212 version 15.2.0 Release print of the Portable Document Format (PDF) version kept on a specific ...



TS 138 331 - V16.1.0 - 5G; NR; Radio Resource Control (RRC

The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to 



TS 138 300 - V15.8.0 - 5G; NR; Overall description; Stage-2 (3GPP

The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to 



TS 138 211 - V16.2.0 - 5G; NR; Physical channels and modulation

5G;. NR;. Physical channels and modulation. (3GPP TS 38.211 version 16.2.0 Release 16) deliverable is the one made publicly available in PDF format at ...





Flexible Multi-Numerology Systems for 5G New Radio

The same single mother waveform orthogonal frequency division multiplexing (OFDM) is employed for both. LTE and NR but in contrast to the single-numerology 



Polar Codes Applications for 5G Systems 5G Sistemler için Kutupsal

31 Ara 2018 The three suggested codes for 5G-NR are turbo codes. LDPC codes and polar codes which they have comparable complexity of the decoder



TS 138 211 - V15.2.0 - 5G; NR; Physical channels and modulation

5G;. NR;. Physical channels and modulation. (3GPP TS 38.211 version 15.2.0 print of the Portable Document Format (PDF) version kept on a specific ...

ETSI TS 138 331 V16.1.0 (2020-07)

5G; NR;

Radio Resource Control (RRC);

Protocol specification

(3GPP TS 38.331 version 16.1.0 Release 16)

TECHNICAL SPECIFICATION

ETSI ETSI TS 138 331 V16.1.0 (2020-07)13GPP TS 38.331 version 16.1.0 Release 16

Reference

RTS/TSGR-0238331vg10

Keywords

5G ETSI

650 Route des Lucioles

F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C

Association à but non lucratif enregistrée à la

Sous-Préfecture de Grasse (06) N° 7803/88

Important notice

The present document can be downloaded from:

http://www.etsi.org/standards-search

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or

print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any

existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI

deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.

Users of the present document should be aware that the document may be subject to revision or change of status.

Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification

No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying

and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2020.

All rights reserved.

DECT™

PLUGTESTS™

UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.

3GPP™

and LTE™ are trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of the oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI TS 138 331 V16.1.0 (2020-07)23GPP TS 38.331 version 16.1.0 Release 16

Intellectual Property Rights

Essential patents

IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information

pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found

in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in

respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web

server (https://ipr.etsi.org/).

Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee

can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web

server) which are, or may be, or may become, essential to the present document.

Trademarks

The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.

ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no

right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does

not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.

Legal Notice

This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).

The present document may refer to technical specifications or reports using their 3GPP identities. These shall be

interpreted as being references to the corresponding ETSI deliverables.

The cross reference between 3GPP and ETSI identities can be found under http://webapp.etsi.org/key/queryform.asp.

Modal verbs terminology

In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and

"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of

provisions). "must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 138 331 V16.1.0 (2020-07)33GPP TS 38.331 version 16.1.0 Release 16

Content

1 Scope ........................................................................

.............................................................................. 21守

2 References ........................................................................

............................ 21守

3 Definitions, symbols and abbreviations .......................................................................

.......................... 23守

3.1 Definitions ........................................................................

................................................................................ 23守

3.2 Abbreviations ........................................................................

........................................................................... 25守

4 General ........................................................................

........................................................................... 27守

4.1 Introduction ........................................................................

.............................................................................. 27守

4.2 Architecture ........................................................................

.............................................................................. 27守

4.2.1 UE s tates and state transitions including inter RAT ................................................................................... 27守

4.2.2 Sign alling radio bearers ........................................................................

...................................................... 29守

4.3 Services ........................................................................

.................................................................................... 30守

4.3.1 Serv ices provided to upper layers ........................................................................

....................................... 30守

4.3.2 Serv ices expected from lower layers ........................................................................

.................................. 30守

4.4 Functions ........................................................................

.................................................................................. 30守

5 Procedures ........................................................................

...................................................................... 31守

5.1 General ........................................................................

..................................................................................... 31守

5.1.1 Introduction...................................................................

.............................................................................. 31守

5.1.2 General requirements ........................................................................

.......................................................... 32守

5.1.3 R equirements for UE in MR-DC ........................................................................

........................................ 32守

5.2 System information ........................................................................

.................................................................. 33守

5.2.1 Introduction...................................................................

.............................................................................. 33守

5.2.2 S ystem information acquisition ........................................................................

.......................................... 34守

5.2.2.1 Gene ral UE requirements ........................................................................

.............................................. 34守

5.2.2.2 SIB va lidity and need to (re)-acquire SIB ........................................................................

..................... 34守

5.2.2.2.1 SIB validity ........................................................................

.............................................................. 34守

5.2.2.2.2 SI chang e indication and PWS notification ........................................................................

............. 35守

5.2.2.3 Ac quisition of System Information ........................................................................

............................... 36守

5.2.2.3.1 Acquisition of MIB and SIB1 .......................................................................

.................................... 36守

5.2.2.3.2 Ac quisition of an SI message ........................................................................

.................................. 37守

5.2.2.3.3 Re quest for on demand system information ........................................................................

............ 38守

5.2.2.3.3a Re quest for on demand positioning system information ................................................................. 39守

5.2.2.3.4 Ac tions related to transmission of

RRCSystemInfoRequest message .............................................. 39守

5.2.2.3.5 Re quest for on demand system information in RRC_CONNECTED ............................................. 40守

5.2.2.3.6 Ac tions related to transmission of

DedicatedSIBRequest message ................................................. 41守

5.2.2.4 Ac tions upon receipt of System Information ........................................................................

................ 41守

5.2.2.4.1 Ac tions upon reception of the MIB .......................................................................

........................... 41守

5.2.2.4.2 Ac tions upon reception of the SIB1 .......................................................................

.......................... 41守

5.2.2.4.3 Ac tions upon reception of SIB2 .......................................................................

................................ 45守

5.2.2.4.4 Ac tions upon reception of SIB3 .......................................................................

................................ 46守

5.2.2.4.5 Ac tions upon reception of SIB4 .......................................................................

................................ 46守

5.2.2.4.6 Ac tions upon reception of SIB5 .......................................................................

................................ 47守

5.2.2.4.7 Ac tions upon reception of SIB6 .......................................................................

................................ 47守

5.2.2.4.8 Ac tions upon reception of SIB7 .......................................................................

................................ 47守

5.2.2.4.9 Ac tions upon reception of SIB8 .......................................................................

................................ 47守

5.2.2.4.10 Actio ns upon reception of SIB9 .......................................................................

................................ 48守

5.2.2.4.11 Actio ns upon reception of SIB10 .......................................................................

.............................. 48守

5.2.2.4.12 Actio ns upon reception of SIB11 .......................................................................

.............................. 48守

5.2.2.4.13 Actio ns upon reception of SIB12 .......................................................................

.............................. 49守

5.2.2.4.14 Actio ns upon reception of SIB13 .......................................................................

.............................. 49守

5.2.2.4.15 Actio ns upon reception of SIB14 .......................................................................

.............................. 49守

5.2.2.4.16 Actio ns upon reception of SIBpos .......................................................................

............................ 49守

5.2.2.5 Ess ential system information missing ........................................................................

........................... 50守

5.3 Connection control ........................................................................

................................................................... 50守

5.3.1 Introduction...................................................................

.............................................................................. 50守

5.3.1.1 RR C connection control ........................................................................

................................................ 50守

5.3.1.2 AS Security ........................................................................

................................................................... 51守 ETSI ETSI TS 138 331 V16.1.0 (2020-07)43GPP TS 38.331 version 16.1.0 Release 16

5.3.2 Paging ........................................................................

................................................................................. 52守

5.3.2.1 General ........................................................................

.......................................................................... 52守

5.3.2.2 Initiation ........................................................................

........................................................................ 52守

5.3.2.3 Reception of the Paging message by the UE ........................................................................

................ 52守

5.3.3 R RC connection establishment ........................................................................

........................................... 53守

5.3.3.1 General ........................................................................

.......................................................................... 53守

5.3.3.1a Co nditions for establishing RRC Connection for sidelink communication .......................................... 53守

5.3.3.2 Initiation ........................................................................

........................................................................ 54守

5.3.3.3 Actions re lated to transmission of RRCSetupRequest message ............................................................. 54守

5.3.3.4 Reception of the RRCSetup by the UE ........................................................................

.......................... 55守

5.3.3.5 Reception of the RRCReject by the UE ........................................................................

......................... 57守

5.3.3.6 Ce ll re-selection or cell selection while T390, T300 or T302 is running (UE in RRC_IDLE) ............. 57守

5.3.3.7 T300 expiry .......................................................................

.................................................................... 57守

5.3.3.8 Abortion of RRC connection establishment ........................................................................

.................. 59守

5.3.4 In itial AS security activation ........................................................................

.............................................. 59守

5.3.4.1 General ........................................................................

.......................................................................... 59守

5.3.4.2 Initiation ........................................................................

........................................................................ 59守

5.3.4.3 Reception of the SecurityModeCommand by the UE ........................................................................

.... 59守

5.3.5 RRC reconfiguration ........................................................................

.............................. 60守

5.3.5.1 General ........................................................................

.......................................................................... 60守

5.3.5.2 Initiation ........................................................................

........................................................................ 61守

5.3.5.3 Reception of an RRCReconfiguration by the UE ........................................................................

.......... 62守

5.3.5.4 Second ary cell group release ........................................................................

......................................... 68守

5.3.5.5 Ce ll Group configuration ........................................................................

.............................................. 68守

5.3.5.5.1 General ........................................................................

.................................................................... 68守

5.3.5.5.2 Reconfiguration with sync ........................................................................

....................................... 69守

5.3.5.5.3 RLC bearer release ........................................................................

.................................................. 71守

5.3.5.5.4 RLC bearer addition/modification ........................................................................

........................... 71守

5.3.5.5.5 MAC entit y configuration ........................................................................

....................................... 72守

5.3.5.5.6 RLF T imers & Constants configuration ........................................................................

.................. 72守

5.3.5.5.7 SpCell Configuration ........................................................................

............................................... 73守

5.3.5.5.8 SCell Release ........................................................................

........................................................... 73守

5.3.5.5.9 SCell Addition/Modification ........................................................................

................................... 73守

5.3.5.5.10 BH RLC ch annel release ........................................................................

......................................... 74守

5.3.5.5.11 BH R LC channel addition/modification ........................................................................

.................. 74守

5.3.5.6 Ra dio Bearer configuration ........................................................................

........................................... 75守

5.3.5.6.1 General ........................................................................

.................................................................... 75守

5.3.5.6.2 SRB release ........................................................................

............................ 75守

5.3.5.6.3 SRB addition/modification ........................................................................

...................................... 75守

5.3.5.6.4 DRB release ........................................................................

............................................................. 77守

5.3.5.6.5 DRB addition/modification ........................................................................

..................................... 77守

5.3.5.7 AS Secu rity key update ........................................................................

................................................. 80守

5.3.5.8 Reconfiguration failure ........................................................................

................................................. 81守

5.3.5.8.1 Void ........................................................................

......................................................................... 81守

5.3.5.8.2 Inabi lity to comply with RRCReconfiguration .......................................................................

......... 81守

5.3.5.8.3 T3 04 expiry (Reconfiguration with sync Failure) ........................................................................... 82守

5.3.5.9 Other configuration ........................................................................

....................................................... 84守

5.3.5.10 MR-DC release ........................................................................

............................................................. 86守

5.3.5.11 Full configuration ........................................................................

.......................................................... 86守

5.3.5.12 BAP configuration ........................................................................

........................................................ 87守

5.3.5.12a IAB Other Configuration ........................................................................

.............................................. 88守

5.3.5.12a.1 IP address management ........................................................................

........................................... 88守

5.3.5.12a.1.1 IP Address Release ........................................................................

............................................ 88守

5.3.5.12a.1.2 IP Address Addition /Modification ........................................................................

..................... 88守

5.3.5.13 Conditional Reconfiguration ........................................................................

......................................... 89守

5.3.5.13.1 General ........................................................................

.................................................................... 89守

5.3.5.13.2 Con ditional reconfiguration removal ........................................................................

....................... 90守

5.3.5.13.3 Con ditional reconfiguration addition/modification ......................................................................... 90守

5.3.5.13.4 Con ditional reconfiguration evaluation ........................................................................

................... 90守

5.3.5.13.5 Con ditional reconfiguration execution ........................................................................

.................... 91守

5.3.5.14 Sidelink dedicated con figuration ........................................................................

................................... 91守

5.3.6 Counter check ........................................................................

..................................................................... 92守 ETSI ETSI TS 138 331 V16.1.0 (2020-07)53GPP TS 38.331 version 16.1.0 Release 16

5.3.6.1 General ........................................................................

.......................................................................... 92守

5.3.6.2 Initiation ........................................................................

........................................................................ 92守

5.3.6.3 Reception of the CounterCheck message by the UE ........................................................................

..... 93守

5.3.7 R RC connection re-establishment ........................................................................

....................................... 93守

5.3.7.1 General ........................................................................

.......................................................................... 93守

5.3.7.2 Initiation ........................................................................

........................................................................ 94守

5.3.7.3 Actio ns following cell selection while T311 is running ........................................................................ 96守

5.3.7.4 Actions re lated to transmission of RRCReestablishmentRequest message ........................................... 97守

5.3.7.5 Reception of the RRCReestablishment by the UE ........................................................................

......... 98守

5.3.7.6 T311 expiry .......................................................................

.................................................................... 99守

5.3.7.7 T3 01 expiry or selected cell no longer suitable ................................................................................... 100守

5.3.7.8 Reception of the RRCSetup by the UE ........................................................................

........................ 100守

5.3.8 R RC connection release ........................................................................

.................................................... 100守

5.3.8.1 General ........................................................................

........................................................................ 100守

5.3.8.2 Initiation ........................................................................

...................................................................... 100守

5.3.8.3 Reception of the RRCRelease by the UE ........................................................................

.................... 100守

5.3.8.4 T320 expiry .......................................................................

.................................................................. 103守

5.3.8.5 UE actions upon the expiry of DataInactivityTimer .......................................................................

.... 103守

5.3.9 R RC connection release requested by upper layers ........................................................................

.......... 103守

5.3.9.1 General ........................................................................

........................................................................ 103守

5.3.9.2 Initiation ........................................................................

...................................................................... 103守

5.3.10 Ra dio link failure related actions ........................................................................

......................... 103守

5.3.10.1 Detection of phy sical layer problems in RRC_CONNECTED ........................................................... 103守

5.3.10.2 Recove ry of physical layer problems ........................................................................

.......................... 104守

5.3.10.3 Detection of radio link failure ........................................................................

..................................... 104守

5.3.10.4 RLF cause determination ........................................................................

............................................ 108守

5.3.10.5 RLF report cont ent determination ........................................................................

............................... 108守

5.3.11 UE actions upon going to RRC_IDLE ........................................................................

.............................. 111守

5.3.12 UE actions upon PUCCH/SRS release request ........................................................................

................. 112守

5.3.13 RR C connection resume ........................................................................

................................................... 112守

5.3.13.1 General ........................................................................

........................................................................ 112守

5.3.13.1a Con ditions for resuming RRC Connection for sidelink communication ............................................. 113守

5.3.13.2 Initiation ........................................................................

...................................................................... 113守

5.3.13.3 Actions re lated to transmission of RRCResumeRequest or RRCResumeRequest1 message ............... 115守

5.3.13.4 Reception of the RRCResume by the UE ........................................................................

.................... 116守

5.3.13.5 T319 ex piry or Integrity check failure from lower layers while T319 is running ............................... 119守

5.3.13.6 Cel l re-selection or cell selection while T390, T319 or T302 is running (UE in

RRC_INACTIVE) ................................................................... ........................................................... 120

5.3.13.7 Reception of the RRCSetup by the UE ........................................................................

........................ 120守

5.3.13.8 RNA update........................................................................

................................................................. 120守

5.3.13.9 Reception of the RRCRelease by the UE ........................................................................

.................... 121守

5.3.13.10 Reception of the RRCReject by the UE ........................................................................

....................... 121守

5.3.13.11 Inability to com ply with RRCResume .......................................................................

.......................... 121守

5.3.13.12 Inter RAT cell reselection ........................................................................

........................................... 121守

5.3.14 Uni fied Access Control ........................................................................

..................................................... 121守

5.3.14.1 General ........................................................................

........................................................................ 121守

5.3.14.2 Initiation ........................................................................

...................................................................... 122守

5.3.14.3 Void...................................................................

.................................................................................. 123守

5.3.14.4 T302, T390 expiry or stop (Barring alleviation) ................................................................................. 123守

5.3.14.5 Acces s barring check.......................................................................

.................................................... 124守

5.3.15 RR C connection reject ........................................................................

...................................................... 124守

5.3.15.1 Initiation ........................................................................

...................................................................... 124守

5.3.15.2 Reception of the RRCReject by the UE ........................................................................

....................... 124守

5.4 Inter-RAT mobility.......................................................................

.................................................................. 125守

5.4.1 Introduction...................................................................

............................................................................ 125守

5.4.2 Han dover to NR ........................................................................

................................................................ 125守

5.4.2.1 General ........................................................................

........................................................................ 125守

5.4.2.2 Initiation ........................................................................

...................................................................... 126守

5.4.2.3 Reception of the RRCReconfiguration by the UE ........................................................................

....... 126守

5.4.3 Mobility from NR ........................................................................

............................................................. 126守

5.4.3.1 General ........................................................................

........................................................................ 126守

5.4.3.2 Initiation ........................................................................

...................................................................... 127守 ETSI ETSI TS 138 331 V16.1.0 (2020-07)63GPP TS 38.331 version 16.1.0 Release 16

5.4.3.3 Reception of the MobilityFromNRCommand by the UE..................................................................... 127守

5.4.3.4 Succes sful completion of the mobility from NR ........................................................................

......... 127守

5.4.3.5 Mobility from NR failure ........................................................................

...................... 128守

5.5 Measurements ........................................................................

......................................................................... 128守

5.5.1 Introduction...................................................................

............................................................................ 128守

5.5.2 Measurement configuration ........................................................................

.............................................. 131守

5.5.2.1 General ........................................................................

........................................................................ 131守

5.5.2.2 Measu rement identity removal ........................................................................

.................. 132守

5.5.2.3 Measu rement identity addition/modification ........................................................................

.............. 132守

5.5.2.4 Measu rement object removal ........................................................................

...................................... 133守

5.5.2.5 Measur ement object addition/modification ........................................................................

................. 134守

5.5.2.6 Re porting configuration removal ........................................................................

................................ 135守

5.5.2.7 Re porting configuration addition/modification ........................................................................

........... 136守

5.5.2.8 Quantity configuration ........................................................................

................................................ 136守

5.5.2.9 Measu rement gap configuration ........................................................................

.................................. 136守

5.5.2.10 Re ference signal measurement timing configuration .......................................................................... 138守

5.5.2.10a RSSI measurement timing configuration ........................................................................

.................... 138守

5.5.2.11 Measu rement gap sharing configuration ........................................................................

..................... 139守

5.5.3 Performing measurements ........................................................................

................................................ 139守

5.5.3.1 General ........................................................................

........................................................................ 139守

5.5.3.2 La yer 3 filtering ........................................................................

.......................................................... 143守

5.5.3.3 Deriva tion of cell measurement results ........................................................................

....................... 144守

5.5.3.3a Deriva tion of layer 3 beam filtered measurement ............................................................................... 145守

5.5.4 Meas urement report triggering ........................................................................

......................................... 145守

5.5.4.1 General ........................................................................

........................................................................ 145守

5.5.4.2 Even t A1 (Serving becomes better than threshold) ............................................................................. 150守

quotesdbs_dbs8.pdfusesText_14
[PDF] 5g nr qualcomm pdf

[PDF] 5g nr: architecture

[PDF] 5g opportunities

[PDF] 5g oxygen 60ghz

[PDF] 5g plan in india

[PDF] 5g ppt template

[PDF] 5g presentation pdf

[PDF] 5g progress in india

[PDF] 5g projects in india

[PDF] 5g radio frequency

[PDF] 5g radio frequency dangers

[PDF] 5g radio frequency spectrum

[PDF] 5g radio frequency vs 4g

[PDF] 5g ran

[PDF] 5g ran architecture 3gpp