DELABIE - DE714 700 SPORTING 2 SHOWER PANEL
DELABIE - DE714 700. SPORTING 2 SHOWER PANEL. MACDONALD INDUSTRIES LIMITED. INSTALLATION INSTRUCTIONS. SHOWER PANELS AND SHOWER KITS.
Water Controls for Professional Catering
DELABIE's flow straightener reduces scale build-up and ensures the quality of the water jet maintaining a laminar flow over time. It reduces the frequency.
Stainless Steel Sanitary Ware
For taps see the DELABIE catalogue "Water Controls for Public and Commercial. Places" (DOC 609INT). • Round basin for recessed installation from above or below.
Accessibility and Independence Hygienic Accessories for Public and
design of DELABIE's hygienic accessories make them the perfect complement to. DELABIE's other ranges. 100% recyclable. Stainless steel is 100%.
90 years of innovation
models of sanitary water controls which would make the DELABIE brand well known. We - Jean-Claude Gérard and Luc
Water Controls for Public and Commercial Places
Certificate of Sanitary Conformity. All DELABIE products conform to the CPDW* directive modified. 29/05/1997 and the French Ministry of Health
Water Controls for Healthcare Facilities and Retirement Homes
31 Mei 2019 All DELABIE products conform to the CPDW* directive modified. 29/05/1997 and the French Ministry of Health circular DGS/SD7A2002 no. 571 dated ...
TRENDS BY DELABIE MAGAZINE WINNER OF THE 2020
Images available on our website delabie.co.uk in the PRESS section. TRENDS BY DELABIE MAGAZINE. WINNER OF THE 2020 GERMAN DESIGN AWARD.
DESIGN AND TECHNOLOGY FOR OPTIMAL HAND HYGIENE
The DELABIE Group expert in hygienic accessories for public and commercial places has launched As with most of DELABIE's accessories
DELABIE “BEST BRAND OF THE YEAR 2020” FOR STAINLESS
Images available on our website delabie.co.uk in the PRESS section After winning a 2019/2020 PLUS X AWARD with the HYBRIMATIC FINO
DELABIE - DE714 700
SPORTING 2 SHOWER PANEL
MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
SHOWER PANELS AND SHOWER KITS
WITH AUTOMATIC, TIME FLOW SHUT-OFF
www.macdonaldindustries.co.nz 1Thoroughly flush the pipes
to remove any impurities before installing and commissioning the product.1030 1015985
70701/2"
1/2"MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 2MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 3OPERATION
INSTALLATION
SPORTING shower panel with top inlet (Fig. A, C)
5313 and remove the cover 7.
42.6 and 6'.
4 8 327 31 or a pair of circlip pliers.
2 and tighten the 2 screws 4.
MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 4 SPORTING shower panel with back inlet (Fig. B, C, D, E, F) 5Fig. B).
313 and remove the cover 7
Fig. B, C
33 by unscrewing nut 34
Fig. D
32Fig. E
36Fig. D
35Fig. E
37 and nut 35Fig. E
by screwing the threaded screw 37 waterproof seal. Tighten so that the groove 38 is in line with the mounting surface 39Fig. F4 and the end cap 2Fig. B
36 and tighten nut 34Fig. D
6 and 6'Fig. B
32Fig. E
40 into the slot on the cover 7Fig. B
7 and tighten up the ring 3 using the tool 31
Fig. B, C
24Fig. B
IT IS THE INSTALLER'S RESPONSIBILITY TO:
Failure to comply with this advice may lead to leakage into the wall, fo r which MacDonaldIndustries cannot be held responsible.
IF IN DOUBT, CONTACT TECHNICAL SUPPORT.
MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 5COMMISSIONING (FIG. A, B)
1 1 water.SETTINGS (FIG. A, B, C, J)
5 nozzle 55 using the tool 31Fig. J
41.5
3 using the tool 31
7. Turn the screw 32
cover 7 and the ring 3 using the tool 31Fig A, B, CREMEMBER
Our mixers/taps must be installed by professional installers in accordance with current Sizing the pipes correctly will avoid problems of pressure loss and unwanted noise.Protect the installation
Install stopcocks
and at least once a year.MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 6MACDONALD INDUSTRIES LIMITED
INSTALLATION INSTRUCTIONS
www.macdonaldindustries.co.nz 7MAINTENANCE
SPORTING panel
Fig. A, B, C, G
31 unscrew the ring 3 and remove the cover 7 Fig. A & C or B & C
32Fig. A or B
4 and remove the end cap 2Fig. A or B
20Fig. G
Fig. G
21 and 22Fig. G
20.32Fig. A or B
7 and tighten the ring 3 using the tool 31 or a pair of circlip pliers
Fig. A & C or B & C
2 and tighten the two screws 4Fig. A or B
Fig. A, B, C, H, I, K
313 and remove the cover 7Fig. A & C or
B & C32Fig. A or B
42Fig. K
2526 and the piston 27
24Fig. H
253028 and 29Fig. H, I
24 Fig. H
32Fig. A or B
7 and tighten the ring 3Fig. A or B
Fig. A, B, C, L
313 and remove the cover 7Fig. A & C or
B & C 32Fig. A or B
43 and clean the filter 44Fig. L
44 and the filter holder 43.
32Fig. A or B
7 and tighten the ring 3 using the tool 31Fig. A or B
Fig. A, B, C
313 and remove the cover 7
Fig. A & C or B & C
4 and remove the end cap 2Fig. A, B
6 and 6'Fig. A, B
Auckland (Head Office)
P: F:E: sales@macdonaldindustries.co.nz
Wellington
P: F:Christchurch
P: F: www.macdonaldindustries.co.nzquotesdbs_dbs50.pdfusesText_50[PDF] délai déclaration impôts vaud
[PDF] delai entre decret naturalisation ceremonie
[PDF] delai obtention numero securite sociale
[PDF] delai resultat bilan sanguin
[PDF] délai résultat prise de sang thyroide
[PDF] délais de paiement maroc 2016
[PDF] delegation au tiers declarant relative aux operations
[PDF] délégation du commerce et de l'industrie casablanca
[PDF] delf 2017
[PDF] delf a1 ciep
[PDF] delf a2 compréhension oral
[PDF] delf a2 exercices
[PDF] delf a2 exercices d'ecoute
[PDF] delf a2 exercices oral