[PDF] MGETM GalaxyTM 7000 These circuit breaker kits are





Previous PDF Next PDF



Eaton EMEA 3ph UPS accessories

A DC-rated battery circuit breaker provides protection and Eaton battery breaker kits includes a wide range of breakers to be used with.



MGETM GalaxyTM 7000

These circuit breaker kits are supplied separately for installation of batteries in cabinets not supplied by. APC by Schneider Electric. 1.1 Front view.



Vertiv™ NetSure™ -48VDC Battery Rack System

circuit breakers factory CB alarm wiring is provided to an alarm card. The Optional Battery Disconnect Circuit Breaker Kits.



Easy UPS 3M and Easy UPS 3L

Battery Breaker Kit. DANGER. HAZARD OF ELECTRIC SHOCK EXPLOSION



Eaton 3 phase UPS (8-1200 kVA) accessories product catalogue

A DC-rated battery circuit breaker provides protection and Eaton battery breaker kits includes a wide range of breakers to be used with.



Installing Breakers in the Enphase Enpower Smart Switch

11 jui. 2020 WARNING: Before installing or using the circuit breaker kits read ... Enphase Encharge batteries



Eaton EMEA 3ph UPS accessories

A DC-rated battery circuit breaker provides protection and Eaton battery breaker kits includes a wide range of breakers to be used with.



Eaton EMEA 3ph UPS accessories catalogue

A DC-rated battery circuit breaker provides protection and Eaton battery breaker kits includes a wide range of breakers to be used with.



Test Kit I.L. for Testing Digitrip 520 1150

https://www.eaton.com/content/dam/eaton/products/electrical-circuit-protection/low-voltage-air-circuit-breakers/type-vcp-tccs/test-kit-il-for-testing-digitrip-520-1150-digitrip-310-il5721b13_r07.pdf



Conext Three-Phase Breaker Kit Installation Guide 865-1315-01

Battery Circuit Breakers must be installed according to the specifications and requirements specified by. Schneider Electric. • Servicing of batteries must 

MGE TM

Galaxy

TM 7000

160 - 500 kVA

Battery circuit breaker kits

Installation manual

34021530EN/AD - Page 2

Introduction

Contents

1. Example of installation in a cabinet

1.1 Front view......................................................................................................................................3

1.2 Cross-section AA.........................................................................................................................4

1.3 Cross-section BB.........................................................................................................................5

1.4 Installing the battery circuit breaker...........................................................................................5

2. Connections

2.1 Auxiliary terminal block XR1.......................................................................................................6

2.2 Cover installation.........................................................................................................................6

Thank you for selecting an APC by Schneider Electric product to protect your electrical equipment.

The MGE

Galaxy

7000 range has been designed with the utmost care.

We recommend that you take the time to read this manual to take full advantage of the many features of your UPS

(Uninterruptible Power System). APC by Schneider Electric pays great attention to the environmental impact of its products.

Measures that have made MGE™ Galaxy

7000
? the eco-design approach used in product development, ? the elimination of harmonic disturbances reinjected into the AC source, ? production in an ISO 14001 certified factory, ? recycling of the MGE™ Galaxy™ 7000 at the end of its service life.

To discover the entire range of APC by Schneider Electric products and the options available for the MGE™ Galaxy™ 7000

range, we invite you to visit our web site at www.apc.com or contact your APC by Schneider Electric representative.

All products in the MGE™ Galaxy™ 7000 range are protected by patents. They implement original technology not available to

competitors of APC by Schneider Electric.

To take into account evolving standards and technology, equipment may be modified without notice. Indications concerning

technical characteristics and dimensions are not binding unless confirmed by APC by Schneider Electric.

This document may be copied only with the written consent of Schneider Electric or its affiliated companies. Authorised copies

must be marked "MGE™ Galaxy™ 7000 battery circuit breaker kits installation manual no. 3402153000".

34021530EN/AD - Page 3

1. Example of installation in a cabinet

Each kit includes the circuit breaker, mounting hardware, temperature monitoring option, support plate, cover, auxiliary wires

and stickers.

These circuit breaker kits are supplied separately for installation of batteries in cabinets not supplied by

APC by Schneider Electric.

1.1 Front view

Circuit breaker connection is different than for MGE™ Galaxy™ 5000 and MGE™ Galaxy™ 6000.

To UPSTo batteriesBattery

circuit breaker QF1 Connection via the bottom (see cross-section BB)Shelves for battery cellsATIZ temperature sensor

34021530EN/AD - Page 4

1. Example of installation in a cabinet

1.2 Cross-section AA

Cable trench

(if applicable)Connection via the bottom (see cross-section BB)Battery circuit breaker QF1Connector XR1ShelfFront Rear

34021530EN/AD - Page 5

1. Example of installation in a cabinet

1.3 Cross-section BB

1.4 Installing the battery circuit breaker

? the circuit breaker is secured to the bottom cross-member of the cabinet structure; ? position the battery circuit breaker support and secure by means of 2 screws as shown; ? bolt the support of connector XR1 to the front RH upright of the cabinet structure. Battery circuit breaker QF1Support plate for connector XR1FrontRear

Secure battery

circuit breaker by 2 screws

Opening for cable entry

via the bottom

34021530EN/AD

2. Connections

2.1 Auxiliary terminal block XR1

Terminals 1 to 4 of this terminal block must be connected to the rectifier-inverter cabinet to provide the functions for automatic

opening of battery circuit breaker "QF1" (in case of emergency shutdown for example) and detection of the battery circuit

breaker position for the UPS. Details of these connections are given in UPS installation manual no. 3402084600.

2.2 Cover installation

To complete the installation of the kit, position the cover to protect circuit breaker QF1 and its connections and secure it to

the frame with the two screws as indicated in the figure below.

FrontCover screws

CoverCross-section CC

Battery circuit

breaker QF1quotesdbs_dbs25.pdfusesText_31
[PDF] Battery Connections - Anciens Et Réunions

[PDF] battery information sheet

[PDF] battery isolators

[PDF] BATTERY MULTI CHARGER User Manual

[PDF] battery pack instructions cd-bp-12

[PDF] Battery Park, statue de la Liberté, Ellis Island

[PDF] Battery Protect - Victron Energy

[PDF] Batteur démesuré - Thierry Butzbach

[PDF] BATTEUR MELANGEUR - VARIATEUR DE VITESSE PLANETARY

[PDF] batteur melangeur - variateur de vitesse planetary mixer

[PDF] BATTEUR PROFESSIONNEL KITCHENAID 6.9 L - Ets

[PDF] Batteurs mélangeurs

[PDF] Batteurs mélangeursModèle sol, 40 litres MBE40 pour

[PDF] Battez d`excellents fonds avec des portefeuilles de trackers - France

[PDF] Battioni Pagani Pompe