[PDF] STAFF SELECTION COMMISSION 11 sept. 2020 Junior Engineer (





Previous PDF Next PDF



Diversity Visa Program DV 2016-2018: Number of Entries Received

Diversity Visa Program DV 2016-2018: Number of Entries Received During Each. Online Registration Period by Country of Chargeability.



(C-1/1 Section) Combined Graduate Level Examination (CGLE

30 sept. 2020 ... Graduate Level Examination (CGLE) 2018 (Tier-III) - Declaration of result for appearing in Skill Test and Document Verification (DV).



Instructions for the 2018 Diversity Immigrant Visa Program (DV-2018)

4 oct. 2016 Changes in eligibility this year: Ecuador is eligible for DV-2018. ... spouse will result in your disqualification as the Diversity Visa.



CONSIGNES RELATIVES AU PROGRAMME DE VISA DE

3 oct. 2017 La vérification des résultats du tirage sera disponible par le ... Quelle est la limite du nombre de visas DV-2018 qui sera délivré aux ...



No.19/01/2018-C-1/1 STAFF SELECTION COMMISSION Sub

19 janv. 2018 Sub: Junior Engineer (Civil Electrical



DV 2020 Translation French

3 oct. 2018 (GMT-4) et le mardi 6 novembre 2018 à midi (GMT-5). ... La vérification des résultats du tirage sera disponible par le biais de la rubrique.



Notice_List of Candidates shortlisted for DV & ME under CEN

1 nov. 2019 CEN 03/2018: Recruitment of Junior Engineer (JE) Junior Engineer (Information Technology). Depot Material Superintendant (DMS) and Chemical ...





STAFF SELECTION COMMISSION

11 sept. 2020 Junior Engineer (Civil Electrical



CONSIGNES RELATIVES AU PROGRAMME DE VISA DE

3 oct. 2018 Pour l'année DV-2020 les candidats nés dans les pays suivants n'ont pas le droit ... (GMT-4)

No.19/01/2018-C-1/1

STAFF SELECTION COMMISSION

CONFIDENTIAL -1/1 SECTION

Junior Engineer (Civil, Electrical, Mechanical and Quantity Surveying & Contracts) Examination, 2018 Declaration of result of Paper-II for short-listing

Candidates to appear in Document Verification

Result of Paper-I of Junior Engineer (Civil, Electrical, Mechanical, Quantity Surveying and Contracts) Examination, 2018 was declared on 12.12.2019 and an additional result was declared on 27.12.2019. Based on the result of Paper-I of the said examination, 10635 candidates (Civil: 8697 and Electrical/ Mechanical: 1938) were qualified for appearing in Paper-II. Paper-II of the said examination was conducted on

29.12.2019.

2. On the basis of cut-off marks (Paper-I + Paper-II) fixed by the Commission,

following are the details of the candidates qualifying for appearing in the Document

Verification:-

I. Civil Engineering:

SC ST OBC EWS UR OH HH Total

Cut-off marks

(Paper I + Paper II) 193.68 201.54 209.38 229.05 250.49 162.01 132.68 ---

Candidates

available 649 402 1660 599 456* 22 12 3800 * In addition, 89 SC, 112 ST, 661 OBC, 361 EWS and 01 OH candidates who have qualified at UR cut-off, have been shown under their respective categories only.

II. Electrical/ Mechanical Engineering:

SC ST OBC EWS UR OH HH Total

Cut-off marks

(Paper I + Paper II) 217.74 215.52 255.56 298.93 304.61 223.81 148.39 ---

Candidates

available 178 111 373 98 97* 16 10 883 * In addition, 45 SC, 26 ST, 163 OBC, 83 EWS and 01 OH candidates who have qualified at UR cut-off have been shown under their respective categories only.

3. The lists herein are provisional. The candidates whose Roll Numbers figure in the

lists would be called for Document Verification. Further, candidature will be subject to their fulfilling all the eligibility conditions/requirements as prescribed for the respective posts in the Notice of Examination and also subject to thorough verification of their identity with reference to their photographs, signatures, handwritings, preference, etc., on the Application Forms, Admission Certificates, etc. If, on verification, it is found that any candidate does not fulfill any of the eligibility conditions, he/she will not be considered for final result. All qualified candidates in the result need to appear for Document Verification. Candidates who do not attend Document Verification will not be considered for final selection.

4. Document Verification will be conducted w.e.f. 28.09.2020 (tentatively). The Admit

Cards of the qualified candidates for appearing in Document Verification will be uploaded on the websites of the respective Regional Offices before the conduct of the document verification. The candidates who are unable to download their Admit Cards may contact the concerned Regional Offices immediately. The responsibility of ensuring the download of the Admit Cards is solely of the candidates.

5. Marks of the qualified/non-

website on 15.09.2020. Candidates may check their 15.09.2020 to

14.10.2020 by using Registration No. and Registered Password and thereafter clicking on

Result/Marks link on the candidate dashboard.

Under Secretary (Confidential-1/1)

11.09.2020

quotesdbs_dbs50.pdfusesText_50
[PDF] dv 2019 instructions

[PDF] dv lottery 2018 inscription

[PDF] dv lottery 2019 inscription

[PDF] dv lottery results

[PDF] dvlottery.state.gov 2018 inscription

[PDF] dvlottery.state.gov 2018 resultats

[PDF] dvlottery.state.gov 2018 results

[PDF] dvlottery.state.gov 2019

[PDF] dvlottery.state.gov 2019 inscription

[PDF] dvr h 264 configuration

[PDF] dvr h.264 network configuration

[PDF] dvr h264 ahd

[PDF] dvr h264 configuration

[PDF] dvr h264 manuel

[PDF] dvr h264 mot de passe oublié