[PDF] Acceptable Solutions and Verification Methods for Clause E2





Previous PDF Next PDF



ESTRADIOL.pdf

E2 est en équilibre avec l'estrone (E1) qui provient de l'aromatisation de l'androstènedione. Chez la femme en période de vie génitale E2 a une origine unique



CHAPITRE VII - DISPOSITIONS APPLICABLES A LA ZONE E

La zone E comprend cinq secteurs "E2" "E2s"



CIRCULAIRE N°DHOS/E2/E4/2004/176 du 29 mars 2004 23/03/2009

23?/03?/2009 CIRCULAIRE N°DHOS/E2/E4/2004/176 du 29 mars 2004 re lative aux recommandations pour la mise en place d'un programme de gestion des risques ...



Circulaire DHOSE2 - DGSSD5C N° 21 du 22 janvier 2004 relative

03?/12?/2002 Circulaire DGS/SD5C-DHOS/E2 2003/02 du 3 janvier 2003 relative aux modalités de signalement des infections nosocomiales dans les ...



[Draft] European Sustainability Reporting Standard E2 Pollution

03?/08?/2021 [Draft] ESRS E2 Pollution. Working paper February 2022. Page 1 of 50. [Draft] European Sustainability Reporting Standard E2. Pollution.



1 …/… Circulaire DGS/DHOS/E2 – N° 645 du 29 décembre 2000

Circulaire DGS/DHOS/E2 – N° 645 du 29 décembre 2000 relative à l'organisation de la lutte contre les infections nosocomiales dans les établissements de 



Decision No E2 of 3 March 2010 concerning the establishment of a

03?/03?/2010 Having regard to Article 72(d) of Regulation (EC) No 883/2004 of the European Parliament and of the Council of 29 April.



CIRCULAIRE N°DHOS/E2/2002/266 du 30 avril 2002

Bureau E2 : qualité et sécurité des soins en établissements de santé. Suivi du dossier : Danièle CULLET - Tél. : 01.40.56.77.41.



ESTRONE

précurseur de l'estradiol (E2) qui est l'œstrogène majeur circulant. Elle est synthétisée dans les gonades (ovaires.



Acceptable Solutions and Verification Methods for Clause E2

04?/03?/2011 Verification Methods E2/VM1 and Acceptable Solutions E2/AS1. E2/AS2 and E2/AS3. For New Zealand Building Code Clause. E2 External Moisture.

Verification Methods E2/VM1

and Acceptable Solutions E2/AS1,

E2/AS2 and E2/AS3

For New Zealand Building Code Clause

E2 External Moisture

E2 2 Status of Verification Methods and Acceptable Solutions Verification Methods and Acceptable Solutions are prepared by the Ministr y of Business, Innovation and Employment

in accordance with section 22 of the Building Act 2004. Verification Methods and Acceptable Solutions are for use in

establishing compliance with the New Zealand Building Code.

A person who complies with a Verification Method or Acceptable Solution will be treated as having comp

lied with

the provisions of the Building Code to which the Verification Method or Acceptable Solution relates. However, using

a Verification Method or Acceptable Solution is only one method of complyin g with the Building Code. There may be alternative ways to comply. Defined words (italicised in the text) and classified uses are explain ed in Clauses A1 and A2 of the Building Code and in the Definitions at the start of this document. Enquiries about the content of this document should be directed to:

Ministry of Business, Innovation and Employment

PO Box 1473, Wellington 6140

Telephone 0800 242 243

Email: info@building.govt.nz

Verification Methods and Acceptable Solutions

are available from www.building.govt.nz © Ministry of Business, Innovation and Employment 2020 This document is protected by Crown copyright, unless indicated otherwis e. The Ministry of Business, Innovation and Employment administers the copyrigh t in this document. You may use and reproduce this document for your personal use or for the purposes of your business provided you reproduce the document accurately and not in an inappropriate or misleading context. You may not distribute this document to others or reproduce it for sale or profit. The Ministry of Business, Innovation and Employment owns or has licences to use all images and trademarks in this document. You must not use or reproduce images and trademarks featured in this document for any purpose (except as part of an accurate reproduction of this document) unless you first obtain the written perm ission of the

Ministry of Business, Innovation and Employment.

2A

Document Status

The most recent version of this document (Amendment 10), as detailed i n the Document History, is approved by the Chief Executive of the Ministry of Business, Innovation and Employment. It is effective from 5

November 2020 and supersedes all

previous versions of this document. The previous version of this document (Amendment 9) will cease to have effect on 3 November 2021. People using this document should check for amendments on a regular basi s. The Ministry of Business, Innovation and

Employment may amend any part of any Verification Method or Acceptable Solution at any time. Up-to-date versio

ns of Verification Methods and Acceptable Solutions are available from www.building.govt.nz

E2: Document History

DateAlterations

First publishedJuly 1992

Second Edition28 February 1998Document revised - Second edition issued Third EditionE2/VM1 effective from 1 July 2004 E2/AS1 effective from 1 February 2005

Amendment 1

September 2004E2/AS1 effective from 1 July 2005p. 2 Document Status

Reprinted incorporating Amendment 1September 2004

Amendment 2Effective from 1 July 2005p. 2 Document History, Document Status pp. 5-7, 9, 10 Contents pp. 13-16 References pp. 17-20 Definitions pp. 21-24 E2/VM1pp. 25-43, 45-47, 49, 50, 55-57, 59-67,

69-89, 93-100, 102, 103, 105-107,

111-119, 121-125, 127-135, 138,

140-144, 146, 147, 149, 150,

153-155, 157,163-169 E2/AS1

pp. 173, 174, 177, 178 Index Erratum 1Effective from 1 December 2005p. 166 Table 23 Amendment 321 June 2007pp. 3 and 4, Building Code Clause E2

Amendment 4Effective from 1 May 2008

until 31 January 2012p. 2 Document History, Document Status pp. 8 and 12 Contents pp. 13-14 Referencespp. 171-180 E2/AS2 p. 181 Index

Amendment 5

1 August 2011p. 2 Document History, Document Status

pp. 5-12 Contents pp. 13-16A References pp. 17-20 Definitions pp. 21-24 E2/VM1pp. 25-180 E2/AS1 pp. 183-184,189-190 E2/AS2 p. 191 E2/AS3 pp. 193-204 Index

Errata 2

Effective from 24 December 2011

until 14 August 2014p. 2 Document History, Document Status p. 9 Contentspp. 29, 41, 43, 49, 55-57, 80, 81,

87, 91, 93, 94, 101, 106-108,

110-115, 117, 158, 160, 172, 176,

191 E2/AS1

Amendment 6

Effective from 14 February 2014

until 30 May 2017p. 2A, Document History, Document Status p. 5, Contents pp. 13,15,16A References p. 17, Definitionsp. 23, E2/VM1 1.5.1, 1.5.2, 1.5.3 pp. 36, 68, 172, 175, 175 E2/AS1 4.3.4,

8.3.4.2, Tables 20, 21, 22

Amendment 7Effective 1 January 2017

until 31 March 2019p. 16A References 2B

E2: Document History (continued)

DateAlterations

Amendment 8

Effective from 30 November 2018

until 31 October 2019p. 5 Contents p. 14 Referencesp. 21-23A E2/VM1 1.3, 1.3.1, 1.3.2,

1.3.2.1, 1.4.4.1, 1.4.5.1, 1.5, 1.6, 1.7

Amendment 9

Effective 27 June 2019 until

3 November 2021p. 5 Contentsp. 21 E2/VM1 1.0

Amendment 10

Effective 5 November 2020pp. 13, 16 References

pp. 49-50 E2/AS1 Figures 11 and 12 p. 54 E2/AS1 7.3.2.1 pp. 60-61 E2/AS1 8.1.6, 8.1.7, 8.1.6.1 p. 86 E2/AS1 Figure 52 p. 91 E2/AS1 8.5.6 p. 93 E2/AS1 8.5.10 p. 96 E2/AS1 Figure 64 p. 148 E2/AS1 9.7.1, 9.7.3 p. 164 E2/AS1 Figure 124 p. 167 E2/AS1 9.9.10.2 Note: Page numbers relate to the document at the time of Amendment and m ay not match page numbers in current document. 3

EXTERNAL MOISTURE

DEPARTMENT OF BUILDING AND HOUSING

New Zealand Building Code Clause

E2 External Moisture

This Clause is extracted from the New Zealand Building Code contained in the First Schedule of the Building Regulations 1992.

Clause E2-External moisture

Provisions

Objective

E2.1 building

Functional requirement

E2.2

Buildings

adequate

Performance

E2.3.1

E2.3.2

building elements

E2.3.3

building elements

E2.3.4

Building elements

E2.3.5

Concealed spaces

buildings building elements

Limits on application

buildings buildings amenity

Amend 3

Jun 2007

SR2007/124

21 June 2007

21 June 2007DEPARTMENT OF BUILDING AND HOUSING

4

EXTERNAL MOISTURE

Provisions

Performance

E2.3.6

construction building elements

E2.3.7

Building elements

construction construc- tion

Limits on application

Amend 3

Jun 2007

SR2007/124

Contents

5

EXTERNAL MOISTURE

MINISTRY OF BUSINESS, INNOVATION AND EMPLOYMENTContents E2/VM1 & AS1/AS2/AS3

Amend 2

Jul 2005

Amend 2

Jul 2005

Amend 2

Jul 2005

Amend 2

Jul 2005

Amend 2

Jul 2005

Page

References

13

Definitions

17

Verification Method E2/VM1

21
1.0

Cladding systems of buildings 21

up to 10 m in height, including junctions with windows, doors and other penetrations 1.1

General

21
1.2 Scopequotesdbs_dbs19.pdfusesText_25
[PDF] CORRIGÉ ANTILLES-POLYNÉSIE 2015 Office de Tourisme de Dijon

[PDF] Etude de cas BTS AG 2015 Cas Eurécia Corrigé

[PDF] EDC Eurosignaletique-corrige

[PDF] Annales BTS Transport et prestations Logistiques

[PDF] Téléchargez les anciens sujets de l examen final - Alliance

[PDF] Finance d 'entreprise, 2e édition

[PDF] Comptabilité et Gestion des Organisations 2e année - Fontaine Picard

[PDF] BTS ASSISTANT DE MANAGER FINALITÉ 1 - Fontaine Picard

[PDF] CORRIGE DES MISSIONS MISSION 1

[PDF] professionnel - Fontaine Picard

[PDF] Comptabilité et Gestion des Organisations 1re - Fontaine Picard

[PDF] Comptabilité approfondie Sommaire - Fontaine Picard

[PDF] BAC BLANC FEVRIER TERMINALES S MME ROMY, MME MURPHY

[PDF] Dossier sur les manuels de Seconde au format PDF

[PDF] Géographie - Le livre du prof