[PDF] Results-Framework Document For Centre for Development of





Previous PDF Next PDF



List of fully UIC approved composite brake blocks for international

3 and 4. Version 3.0. 4.0. 18/05/2011. 4. Version 4.0. 5.0. 09/08/2011. 4. Version 5.0 Introduction of link with Commission Regulation (EU) 321/2013.



THERMOSALD ISX-LC / IPX-LC

Pagina: 4 di: 30. Data: 25/03/2013. 1 INTRODUCTION. This manual is the only complete document concerning the product represented on the front.



CoolSET -F3 (Jitter Version)

25 mars 2013 The CoolSET®-F3(Jitter version) meets the requirements ... ICE3Bxx65J. Table of Contents. Page. Version 2.9. 4. 25 Mar 2013.



list of fully uic approved composite brake blocks for international

31 mai 2013 3 and 4. Version 3.0. 4.0. 18/05/2011. 4. Version 4.0 ... 25/03/2013. 4 ... Introduction of link with Commission Regulation (EU) 321/2013.



Animal Products (Specifications for Dairy Processing) Notice 2013

25 mars 2013 This notice comes into force on the 25th of March 2013. ... Part 1: Introduction ... 2.6 Approved Criteria. 3. 2.7 HACCP Requirements. 4 ...



VALE Nouvelle Calédonie PARC À RÉSIDUS DE LA KWÉ OUEST

Présentation des plans de suivi et des protocoles de mesure . 3 500 000. 4 000 000. Janvier. Février. Mars. Avril. Mai. Juin. V ... 25/03/2013.



Results-Framework Document For Centre for Development of

Support Telcos and service providers in the introduction of new 4. Provide market orientation to R&D activities and sustain C-DOT as a centre of ...



SEA Statement

of the European sites (as published on the NPWS website 25/03/2013



THERMOSALD ISX-LC / IPX-LC

Software V4.0. Rev.: 3. Data: 20/06/2012. Software V4.2. Rev.: 4. Data: 03/12/2012. Software V4.3. Rev.: 5. Data: 25/03/2013. Software V4.4.



GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RESEARCH

2 janv. 2020 4. 25-03-2013. 49/2012. Ver 0.0. To incorporate recommendation of ... taken as a reference to the latest version of the specification unless ...

1 R F D

Results-Framework Document

For

Centre for Development of Telematics

(2012-2013) 1 R F D

Results-Framework Document

For

Centre for Development of Telematics

(2012-2013) C-DOT to become World Class Indian Telecom Technology Development Centre. 

i. To indigenously design develop state of art telecom technologies, products and solution.ii. To meet the telecom needs of

India, particularly of national importance in strategic sector and rural areas.

1. Work on telecom technology products and services to provide solutions for current, future requirements and converged

networks including those of national importance especially related to rural applications, strategic sector and security

2. Support Telcos and service providers in the introduction of new technologies, features and services by optimal utilization

3. Develop and progressively transfer technology from design to manufacture utilizing resources from within the country and

4. Provide market orientation to R&D activities and sustain C-DOT as a centre of excellence.

1.Work in the frontiers of technology of Telematics & Information Technology

taking into account futuristic trend and to conduct such basic research to meet the objectives.

2.Indigenous Telecom R&D to meet the telecom needs of the country.

3.Making country self reliant with appropriate telecom technologies by import substitution.

4.Build partnerships and joint alliances with Academia, Industry, Solution providers, Telcos and other R&D organizations to

5.To promote & assist ancillary industry in the production of high quality components, subassemblies and equipment to meet

performance standards required by the telematic industry.

FunctionFunction

Results-Framework Document (RFD) for Centre for Development of Telematics (2012-2013)

Section 1:

Vision, Mission, Objectives and Functions

Vision

Mission

Objectives

FunctionFunction

Results-Framework Document (RFD) for Centre for Development of Telematics (2012-2013)

Section 1:

Vision, Mission, Objectives and Functions

Vision

Mission

Objectives

ObjectiveWeightActionSuccess IndicatorUnitWeight

Excellent(100

Very

Good(90%)Good (80%)fair (70%)Poor (60%)

[1]Work on telecom technology products and services to provide solutions for current, future requirements and converged networks including those of national importance especially related to rural applications, strategic sector and security agencies, etc.55 [1.1] Completion of

R&D deliverables

planned for the year [1.1.1] LTE-A (Long

Term Evolution-

Advance): Design,

Development &

Prototype of Femto

eNodeB system for [1.2.1] Design &

Development of IEEE

1588 (backhaul for

both 2.5G & 10G) compliant CPE for

OAAS (Optical

Aggregation &

Access System):

2.5G, OLT solution

with optical interfaces adaptable to 10G GPON & demonstration of services over 10G [1.3.1] CMS (Centralize

Monitoring System)

R&D : Software

enhancement for

RMC with Disaster

Recovery (DR) , ISF

Software

Customization for LIS

Interface, ISP

Integration Basic

Design, Software

Release for Field

[1.4.1] Commercial

Grade Terabit

Router: Design

completion for fault tolerant multi Terabit

Results-Framework Document (RFD) for Centre for Development of Telematics (2012-2013)

Section 2:

Inter se Priorities among Key Objectives, Success indicators and Targets

Target / Criteria Value

[1.5.1] UNMS (Unified Network

Management

System): Design &

Development of

Unified NMS - V1.0.0

for testing / validationDate5.020/02/201301/03/201315/03/201325/03/201331/03/2013 [1.6.1] Broadband

CPE (Customer

Premises) with 3G

Field Trial

[1.7.1] CPRS (Customized Platform for Rural Services) :

A genericapplication

platform for DRAX (Data Rural

Application

Exchange) for Client

sytem implementation with demonstration for advanced features e.g. Near Field

Communication

(NFC) & services like adhar authentication [1.8.1] High efficiency RF

Amplifier (HERA):

Design

implementation for card realization & [1.9.1] EAIS (Enhanced Active

Infrastructure

Sharing) : GPRS

(General Packet

Radio Service) &

EGPRS (Enhanced

GPRS) functionality

implementation over

SGRAN (Shared

GSM Radio Access

Network) - R&D field

[2]Support Telcos and service providers in the introduction of new technologies, features and services by optimal utilization of installed networks, pilots and studies.25 [2.1] Enhancements/ new features/ upgradations/ adaptations/ technical support for developed technologies [2.1.1] CMS roll-out quotesdbs_dbs35.pdfusesText_40
[PDF] Veuillez dûment compléter les documents suivants en majuscules et signer conformément à la signature de votre(vos) carte(s) d identité :

[PDF] Veuillez trouver ci-dessous les principales étapes à suivre ainsi que quelques conseils pratiques pour vous aider à soumettre la demande en ligne.

[PDF] VIH et Vieillissement

[PDF] Ville de Carpentras EXPERTISE DU CONTRAT DE DELEGATION DU SERVICE PUBLIC D ASSAINISSEMENT COLLECTIF

[PDF] VILLE DE CHARLEROI REGLEMENT RELATIF AU MEDIATEUR COMMUNAL

[PDF] VILLE DE CLOUANGE MARCHE DE MAITRISE D ŒUVRE POUR LA RENOVATION DE L ANNEXE SOCIALE 16, RUE MAL JOFFRE R.C. REGLEMENT DE LA CONSULTATION

[PDF] VILLE DE MIRABEL LOI ASSURANT L EXERCICE DES DROITS DES PERSONNES HANDICAPÉES EN VUE DE LEUR INTÉGRATION SCOLAIRE, PROFESSIONNELLE ET SOCIALE LOI 56

[PDF] Ville de SURESNES ENQUÊTE ET ETUDE DE STATIONNEMENT SUR L ENSEMBLE DE LA VOIRIE. Situation actuelle - Diagnostic Scénarios envisageables

[PDF] VILLE VIE VACANCES. Accueils collectifs de mineurs

[PDF] Virtual PBX Quick User Guide

[PDF] Vision stratégique du développement culturel, économique, environnemental et social du territoire

[PDF] VIVA FRONTALIERS FRANCE PACKAGE SANTÉ

[PDF] vivez l expérience TelePresence

[PDF] Vivre sereinement en famille, en équipe favorise l efficacité en entreprise. Vivre ensemble en famille, en équipe cela s apprend aussi

[PDF] VIVRE SUR LES MÉDIAS SOCIAUX COMME DANS LA VRAIE VIE!