[PDF] Presentation of VINCI Park A86 west tunnel International Paris





Previous PDF Next PDF



Appendix 2.8 – FRANCE – the Duplex Tunnel A 86 in western Paris

The A86 Duplex referred as the Duplex Tunnel



TfL Roads Review: Part B1-10

figure B2.0. THE A86 mOTORwAY AND DUPLEX TUNNEL PARIS The A86 West project involved two tunnels



VINCI Construction - 2005 annual report

The A86 West tunnel will complete the outer Paris ring road. it is being built for cofiroute by a consortium led by Vinci construction Grands.



Appendix 2.10 - FRANCE – Nanterre / La Défense – A14 / A86

The A14-A86 complex also called Nanterre-La Défense Tunnel



VINCI Concessions - A86 DUPLEX: THE END OF THE TUNNEL

23 Aug 2007 Digging work on the second section of the A86 Duplex tunnel linking ... maximum comfort and safety for motorists in the Greater Paris Area.



HI-FOG® on land

HI-FOG on Land. Hotel Rive Gauche Paris



ADVANCED STUDIES OF FIRE PROPAGATION IN A MOTORWAY

3rd International Conference 'Tunnel Safety and Ventilation' 2006 Graz A86 motorway west of Paris is a tunnel which carries traffic on two levels



Presentation of VINCI Park

A86 west tunnel International Paris French regions. 347000. 109



Underground Transportation Systems in Europe: Safety Operations

A86 West Beltway East Tunnel emergency facilities: cross section the A–86 motorway in Paris demonstrates the effectiveness of good.



Dubai_Show Marioff presentation_2013

14 Jan 2013 Dubai IWMA Seminar. Road tunnels. Paris. ? A86 West tunnel part of “super-ring” road. ? HI-FOG® protects 10 km section

1

Presentation of VINCI Park

London

London

12 12

February

February

2004
2004

Dario d'ANNUNZIO - Chairman of VINCI Concessions

Denis GRAND - Chairman and CEO of VINCI Park

Sue TAYLOR - CEO of VINCI Park UK

Renaud LAROCHE - CFO of VINCI Park

2

Programme

Programme

1.Introduction

2.VINCI Park - Presentation

3.Challenges to be met

4.Strategy

5.Focus - VINCI Park in the UK

6.Key figures

7.Outlook

3

Introduction

Introduction

4

An excellent

An excellent

combination combination of of complementary skills complementary skills in construction in construction and and concessions concessions

Fundamentals of the combination of skills:

Fundamentals of the combination of skills:

HEntrepreneurial culture

HCommercial synergies based on a dense network of local companies (e.g.: building & civil engineering  car parks, ...) HRecognised expertise (design capability, cost and schedule control, project management know-how, operator know-how) HComplementary business cycles: concessions generate recurring and growing revenue Value creation: Cofiroute, VINCI Park, infrastructure concessions, etc ...

Introduction

5

Concessions: a long-standing VINCI business line

Concessions: a long-standing VINCI business line

HA growth model that draws on the strengths of a construction company

HStrong presence in France and in Europe

HDiversified portfolio

HA fully fledged VINCI business line

Introduction

6

Introduction

Cofiroute network: 1,100 km

ASF network: 3,100 km

450,000 car park spaces

Prado-Carénage tunnel

A86 west tunnel

Stade de France: 80,000 seats

Airport services at 4 airports

Grenoble airport (275,000 PAX)

Toll Collect (motorway toll system)

Airport services at 1 airport

2 bridges over the Tagus

14,500 car park spaces

13,400 car park spaces

Airport services at 4 airports

Rion-Antirion bridge

Severn crossings

Newport bypass (south)

Dartford: 150,000 vehicles/day

150,000 car park spaces

Airport services at 2 airports

5,700 car park spaces

Airport services at 1 airport

8,400 car park spaces

Chillàn-Collipulli motorway: 165 km

3,400 car park spaces

22 airports: 23m PAX

SR91 express lanes: 17 km

Airport services at 72 airports

Confederation bridge: 13 km

Fredericton-Moncton motorway: 200 km

43,000 car park spaces

Airport services at 8 airports

29,800 car park spaces

Airport services at 1 airport

2 airports: 1m PAX

22,800 car park spaces

(including Luxembourg)

Liège airport: 200,000 PAX

Airport services at 15 airports

7

Presentation

Presentation

of VINCI Park of VINCI Park 8

Operating in

12

12 countries and 240

cities cities

0 France :

165
165
cities cities

0 International :

75
75
cities cities

Operates

811,000

811,000

paying paying parking parking spaces spaces and 1,400 1,400 kilometres kilometres of on- of on- street regulated street regulated parking parking

Operates

1,250 car

1,250 car

parks parks

0 France :

550 car

550 car

parks parks

0 International :

700 car

700 car

parks parks

European

European

leader in parking leader in parking

Presentation of VINCI Park

9

Partenariats et synergies

No.1 in parking in France

No.1 in parking in France

H464,000 spaces under

management (12/31/03)

HOperating in 165 cities

HComplementing the motorway

network in which VINCI is involved (ASF, Escota,

Cofiroute)

Cofiroute network (65%)

ASF network (20%)

VINCI Park car parks

Airports

Presentation of VINCI Park

11

Breakdown

Breakdown

by by geographic region geographic region : 811,000 : 811,000 spaces spaces

International

United Kingdom

190 000

Belgium

10 800

Luxembourg

37 300

Switzerland

5 400

Czech Republic

8 500

Austria

400
Spain

13 600

Slovakia

400

Canada

46 700

China

30 500

Chile 3 400

France : 464,000 spaces

44%
13% 43%

InternationalParisFrench regions

347,000

109,000

355,000

Presentation of VINCI Park

12

464 000

17 000

330 000

Concession

Full ownership

Service provision

Breakdown

Breakdown

by type of by type of contract contract 57 %
41 %
2 %

14 000

167 000

283 000

36 %
3 % 61 %

47 000

3 000

297 000

14 % 85 %
1% 1 % France : 464,000 spacesInternational : 347,000 spaces

Presentation of VINCI Park

13

Contract features

Contract features

Breakdown by type of contract

local authority/ownermotoristmotorist

Final customer

local authority/ownerlocal authority/lessorn/a

Upstream customer

lump sum+incentiveunrestricted within a ceilingunrestricted

Pricing

3/5 years30/15 yearsunlimited

Duration

~ 13%~ 45%~ 45% %EBITDA/net sales lowhigh/mediumhigh

Capital intensity

Service provisionConcession/leaseFull ownership

14

Breakdown

Breakdown

by type of by type of facility facility 61%
39%
on-streetcar parks

318,000

493,000

Presentation of VINCI Park

15

Change: + 105,000

Change: + 105,000

spaces spaces in 2 in 2 years years

370 400

320 600

13 900

377 800

340 700

16 500

464 000

330 000

17 000

100 000

200 000

300 000

400 000

500 000

600 000

700 000

800 000

200120022003

Service provisionConcessionFull ownership

704,900

735,000

811,000

CAGR : 7,5%

Presentation of VINCI Park

16

32 000

38 000

46 000

59 000

78 000

106 000

146 000

191 000

347 000

270 000

231 000

27 000

0

50 000

100 000

150 000

200 000

250 000

300 000

350 000

400 000

No; of spqces

Concession

Average

Average

concession concession duration duration : 28 : 28 years years Calculation method: residual contract duration weighted by

EBITDA discounted at VINCI Park WACC (5.6%)

Full ownership

Presentation of VINCI Park

17 4,700 4,700 employees employees

H2 ,100 in France

H2,600 outside of France

Development

Development

of a of a strong corporate strong corporate culture culture

H"VINCI Park et vous»

HVINCI Park Raid adventure

HTraining institute

Creation

Creation

of a of a corporate identity and corporate identity and a business line a business line

Presentation of VINCI Park

18

Challenges to

Challenges to

be be met met 19 A A combination combination of issues to of issues to be addressed be addressed

External factors

H»Arrêté Gallot» government ban on competition: July 2001 - June 2004

HRestriction on cars in cities

Internal factors

HEnd of several major contracts generating significant income (2002 - 2005) HRequest by several concession grantors for renegociation

Challenges to be met

20

Impact of

Impact of

contracts ended contracts ended on net on net income income • Effect of the strategy: At 12/31/03, loss of 10.6 M € completely offset -9,379 -8,311 -9,294-11,662-10,166-7,416-14,621

Annual spaces lost

-5,202-12,469-9,196-9,398-9, 874

Annual net sales

lost -7 -6 -5 -4 -3 -2 -1 0

200220032004200520062007

Impact of contracts

ended on net income

In M €

-4,2 -6,3 -5,1 -1 -1,2 -1,9

Challenges to be met

21

VINCI Park

VINCI Park

strategy strategy 22

Organisation

Organisation

Action completed (2002 - 2003)

H Refocusing on core business: parking

HOperational reorganisation: streamlining and decentralisation

H Reduction of overheads

Action under way (2004)

H Optimisation of purchasing policy

Total savings: 6 M € / year

VINCI Park Strategy

23

Development

Development

Proactive strategy

- External growth - Full ownership acquisitions - Expansion outside France

Firm approach to contract renegotiation

Refocusing and margin improvement outside France

quotesdbs_dbs14.pdfusesText_20
[PDF] a86 west tunnel paris france

[PDF] aa 20 questions test

[PDF] aa accounts

[PDF] aa annual report 2018

[PDF] aa benefits

[PDF] aa breakdown assistance

[PDF] aa cancellation number

[PDF] aa car care

[PDF] aa car insurance

[PDF] aa club

[PDF] aa com advantage reservations

[PDF] aa contact number car insurance

[PDF] aa contact number general enquiries

[PDF] aa contact number insurance

[PDF] aa contact number ireland