[PDF] WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS





Previous PDF Next PDF



WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS

2015 Washington State Energy Code 2nd Edition. CE-5. 2. All completed code compliance forms



Sequim

https://www.sequimwa.gov/DocumentCenter/View/15053/Outpatient-Center-WSEC-Lighting-Budget-Form



2015 Washington State Energy Code ~ Residential & Multi-Family

ALSO: Refer to WSEC Code for supplementary documents required during construction and to be posted in residence. Maintain access to this form during.



2015 RESIDENTIAL ENERGY CODE WORKSHEET - FIRST meet

2015 Washington State Energy Code. SECTION R406. ADDITIONAL ENERGY EFFICIENCY. REQUIREMENTS. R406.1 Scope. This section establishes options for.



2015 Washington State Energy Code ~ Residential

0.5 Credits. For additional information and forms go to: 2015 Washington State Energy Code ~ Residential ... (WSEC) section R402.4.1.2 requires air.



WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS

2015 Washington State Energy Code. CE-5. 2. All completed code compliance forms and all compliance calculations including



Electronic Version - Washington Nonresidential Energy Code Forms

2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 R3



2015 Washington State Residential Energy Code

2015 Washington State Energy Code. RE-1. Chapter 51-11R WAC. STATE BUILDING CODE ADOPTION AND AMENDMENT OF. THE 2015 EDITION OF THE.



WASHINGTON STATE ENERGY CODE RESIDENTIAL PROVISIONS

2015 Washington State Energy Code provisions of WSEC - Residential Provisions. ... be construed to create or form the basis for any liability on.



2015 WASHINGTON STATE ENERGY CODE FOR IRC

Plan review & rough-in inspections. 1. Verify which glazing/door products are proposed. Match window/door schedule on plans with compliance form and verify 



WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS

2015 Washington State Energy Code 2 nd Edition CE-1 Chapter 51-11C WAC STATE BUILDING CODE ADOPTION AND AMENDMENT OF THE 2015 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE COMMERCIAL PROVISIONS WASHINGTON STATE ENERGY CODE COMMERCIAL PROVISIONS TABLE OF CONTENTS Chapter 1 Scope and Administration CE-3

2015 Washington State Energy Code, 2

nd

Edition CE-1

Chapter 51-11C WAC

STATE BUILDING CODE ADOPTION AND AMENDMENT OF

THE 2015 EDITION OF THE

INTERNATIONAL ENERGY CONSERVATION CODE,

COMMERCIAL PROVISIONS

WASHINGTON STATE ENERGY CODE,

COMMERCIAL PROVISIONS

TABLE OF CONTENTS

Chapter 1 Scope and

Administration ........................... CE-3

C101

Scope and General

Requirements ................................. CE-3 C102

Alternate Materials - Method of

Construction, Design or

Insulating Systems ......................... CE-3

C103

Construction Documents ................... CE-3

C104 Inspections ........................................ CE-5 C105 Validity ............................................. CE-6 C106 Referenced Standards ........................ CE-6 C107 Fees ................................................... CE-6 C108 Stop Work Order ............................... CE-6 C109 Board of Appeals .............................. CE-7 C110 Violations .......................................... CE- 7 C111 Liability ............................................. CE-7 Chapter 2 Definitions .............................. CE-9 C201 General .............................................. CE-9 C202 General Definitions ........................... CE-9

Chapter 3 General Requirements .......... CE-17

C301 Climate Zones ................................. CE-17 C302 Design Conditions ........................... CE-17 C303

Materials, Systems

and Equipment ............................. CE-17 Chapter 4 Commercial Energy

Efficiency .............................. CE-21

C401 General ............................................ CE-21 C402

Building Envelope Requirements .... CE-

21
C403

Building Mechanical Systems ......... CE-33

C404

Service Water Heating..................... CE-71

C405

Electrical Power and

Lighting Systems ......................... CE-75

C406

Additional Energy

Efficiency Options ....................... CE-93 C407 Total Building Performance ............ CE- 95
C408

System Commissioning ................. CE-106

C409

Energy Metering and Energy

Consumption Management ........ CE-112

C410

Refrigeration System

Requirements ............................. CE-114

Chapter 5 Existing Buildings .............. CE-119 C501 General .......................................... CE-119 C502 Additions ....................................... CE-119 C503 Alterations ..................................... CE-120 C504 Repairs........................................... CE-125 C505

Change of Occupancy or Use ........ CE-125

Chapter 6 Referenced Standards ....... CE-102

CE-2 2015 Washington State Energy Code, 2

nd

Edition

Margin Markings

Indicates where a section has

been deleted from the requirements of the 2012 IECC

Indicates 2015 IECC language

deleted by Washington state amendment

Indicates a change from the

requirements of the 2012 IECC in the model code . Indicates a Washington state amendment to the 2015 IECC (but remains unchanged from the 2012 WSEC language) . Indicates a change from the 2012

Washington state

amendment

Indicates that text or table has

been relocated within the code

Indicates the text or table

immediately following has been relocated there from elsewhere in the code.

Second Edition, Effective May 1, 2017

2015 Washington State Energy Code, 2

nd

Edition CE-3

CHAPTER 1 [CE]

SCOPE AND ADMINISTRATION

SECTION C101

SCOPE AND GENERAL REQUIREMENTS

C101.1 Title. This code shall be known as the

Washington State Energy Code, and shall be cited as such.

It is referred to herein as "this code."

C101.2 Scope. This code applies to commercial buildings and the buildings sites and associated systems and equipment. References in this code to Group R shall include Group I-1, Condition 2 assisted living facilities licensed by Washington state under chapter 388-78A WAC and Group I-1, Condition 2 residential treatment facilities licensed by Washington state under chapter 246
-337 WAC. Exception: The provisions of this code do not apply to temporary growing structures used solely for the commercial production of horticultural plants including ornamental plants, flowers, vegetables, and fruits. A temporary growing structure is not considered a building for the purposes of this code. However, the installation of other than listed, portable mechanical equipment or listed, portable lighting fixtures is not allowed. C101.3 Intent. This code shall regulate the design and construction of buildings for the use and conservation of energy over the life of each building. This code is intended to provide flexibility to permit the use of innovative approaches and techniques to achieve this objective. This code is not intended to abridge safety, health or environmental requirements contained in other applicable codes or ordinances. C101.4 Applicability. Where, in any specific case, different sections of this code specify different materials, methods o f construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall govern.

C101.4.1 Mixed occupancy. Where a building

includes both residential and commercial occupancies, each occupancy shall be separately considered and meet the applicable provisions of

WSEC--Commercial

Provisions or

WSEC--Residential Provisions.

C101.5 Compliance. Residential buildings shall meet the provisions of

WSEC--Residential Provisions.

Commercial buildings shall meet the provisions of

WSEC--Commercial Provisions.

C101.5.1 Compliance materials. The code official

shall be permitted to approve specific computer software, worksheets, compliance manuals and other similar materials that meet the intent of this code. SECTION C102

ALTERNATE MATERIALS-METHOD

OF CONSTRUCTION, DESIGN

OR INSULATING SYSTEMS

C102.1 General. This code is not intended to prevent the use of any material, method of construction, design or insulating system not specifically prescribed herein, provided that such construction, design or insulating system has been approved by the code official as meeting the intent of this code.

SECTION C103

CONSTRUCTION DOCUMENTS

C103.1 General. Construction documents and other

supporting data shall be submitted in one or more sets with each application for a permit. The construction documents shall be prep ared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed.

Where special conditions exist, the

code official is authorized to require necessary construction documents to be prepared by a registered design professional. Exception: The code official is authorized to waive the requirements for construction documents or other supporting data if the code official determines they are not necessary to confirm compliance with this code.

C103.2 Information on construction documents.

Construction documents shall be drawn to scale upon suitable material. Electronic media documents are permitted to be submitted when approved by the code official . Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed, and show in sufficient detail pertinent data and features of the building, systems and equipment as herein governed. Details shall include, but are not limited to, as applicable:

1. Insulation materials and their R-values.

2. Fenestration U-factors and SHGCs.

3. Area-weighted U-factor and SHGC calculations.

4. Mechanical system design criteria.

5. Mechanical and service water heating system and

equipment types, sizes and efficiencies.

6. Economizer description.

7. Equipment and systems controls.

8. Fan motor horsepower (hp) and controls.

9. Duct sealing, duct and pipe insulation and location.

10. Lighting fixture schedule with wattage and control

narrative.

11. Location of daylight zones on floor plan.

CE-4 2015 Washington State Energy Code, 2

nd

Edition

12. Air barrier details including all air barrier

boundaries and associated square foot calculations on all six sides of the air barrier as applicable.

C103.2.1 Building thermal envelope depiction. The

building's thermal envelope shall be represented on the construction documents. C103.3 Examination of documents. The code official shall examine or cause to be examined the accompanying construction documents and shall ascertain whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.

C103.3.1 Approval of construction documents.

When the

code official issues a permit where construction documents are required, the construction documents shall be endorsed in writing and stamped "Reviewed for Code Compliance." Such approved construction documents shall not be changed, modified or altered without authorization from the code official

Work shall be done in accordance with the

approved construction documents. One set of construction documents so reviewed shall be retained by the code official . The other set shall be returned to the applicant, kept at the site of work and shall be open to inspection by the code official or a duly authorized representative.

C103.3.2 Previous approvals. This code shall not

require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned.

C103.3.3 Phased approval. The code official shall

have the authority to issue a permit for the construction of part of an energy conservation system before the construction documents for the entire system have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this code. The holders of such permit shall proceed at their own risk without assurance that the permit for the entire energy conservation system will be granted.

C103.4 Amended construction documents. Changes

made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. C103.5 Retention of construction documents. One set of approved construction documents shall be retained by the code official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws.

C103.6 Building documentation and close out

submittal requirements. The construction documents shall specify that the documents described in this section be provided to the building owner or owner's authorized agent with 180 days of the date of receipt of the certificate of occupancy.

C103.6.1 Record documents.

Construction

documents shall be updated to convey a record of the completed work. Such updates shall include mechanical, electrical and control drawings red-lined, or redrawn if specified, that show all changes to size, type and locations of components, equipment and assemblies.

C103.6.2

Manuals. An operating and maintenance

manual shall be provided for each component, device, piece of equipment, and system governed by this code.

The manual shall include all of the following:

1. Submittal data indicating all selected options

for each piece of equipment.

2. Manufacturer's operation manuals and

maintenance manuals for each device, piece of equipment, and system requiring maintenance, except equipment not furnished as part of the project. Required routine maintenance actions, cleaning and recommended relamping shall be clearly identified.

3. Name and address of at least one service

agency.

4. Controls system inspection schedule,

maintenance and calibration information, wiring diagrams, schematics, and control sequence descriptions. Desired or field-determined setpoints shall be permanently recorded on control drawings at control devices or, for digital control systems, on the graphic where settings may be changed.quotesdbs_dbs46.pdfusesText_46
[PDF] 2015 washington wild things schedule

[PDF] 2015-14

[PDF] 2015-17 movies

[PDF] 2015-54

[PDF] 2016 10k across the bay

[PDF] 2016 2nd avenue north birmingham alabama

[PDF] 2016 2nd presidential debate

[PDF] 2016 2nd round draft order

[PDF] 2016 3.5 ecoboost problems

[PDF] 2016 6.2 ford engine specs

[PDF] 2016 6.7 cummins performance

[PDF] 2016 6.7 powerstroke problems

[PDF] 2016 6.7 powerstroke reviews

[PDF] 2016 7 mile bridge run results

[PDF] 2016 7 seat suv comparison