Enter the design letter for your requested generator(s). Energy Producing Electric Load Items: Power Supply and Antenna i. Quantity: 1 ii. Load: (may ...



THE CON EDISON LOAD LETTER: ENSURING THAT YOUR THE CON EDISON LOAD LETTER: ENSURING THAT YOUR

THE CON EDISON LOAD LETTER: ENSURING THAT YOUR PROJECT CAN. ELECTRIFY! As soon as the MEP completes the load calculations the load letter process can and 



Electric Vehicle Charging Station Installation Guide - Con Edison

Jan 2 2022 A Load Letter that describes the scope of work ... The Power ready Program Letter



Consolidated Edison Distributed System Implementation Plan

Jun 30 2023 ... load information via a “load letter” submitted through the energy ... customers to power a given load



Installing Natural Gas-fueled Combined Heat and Power (CHP

Load Letter: Submit a load letter to Con Edison Energy Services division. 2. S pecifications: Con Ed will inform the applicant of the required gas 



A Customer Guide to Natural Gas Service Installation

Dec 6 2016 Con Edison provides Licensed Plumbing Contractor Work Request forms for convenience. ... Con Edison Hold Harmless Letter signed by customer.



Powering Electric Cranes

power cranes as prescribed by manufacturers and be able to calculate the power needed at the site through examples created by. Con Edison. 4. Participants 



Con Edison Gas Rate Case Case: 13-G-0031

Each step requires the filing of forms and/or design/construction activities. 1. Submit an Application for Steam Service a Steam Service Load Letter



NYC DOB COGENERATION FORUM - Distributed Generation

Sep 24 2009 Con Edison's Infrastructure Delivers Energy to ... Customer Project Manager (CPM) is single point of contact. – Load letter to Energy Services. – ...



Energy Services - Con Edison

This guide is intended to help customers / contractors operate the. Con Edison's Energy Service Project Center web application. Date: 2/15/2022.



CONSOLIDATED EDISON COMPANY OF NEW YORK INC

Electricity Supply for Con Edison. developing the overall electric power procurement ... both of those markets at eleven different load zones.



A Customer Guide to Natural Gas Service Installation

Dec 6 2016 load. Con Edison provides Licensed Plumbing Contractor Work Request forms for convenience. 1. During the application process



Specifications for Electric Installations Consolidated Edison Co. Inc

Products 200 - 400 Con Edison operates one of the most complex electric power ... Input the request by completing the load letter with further details about ...



Installing Natural Gas-fueled Combined Heat and Power (CHP

tion is a sample of CHP incentive programs though be sure to contact these Load Letter: Submit a load letter to Con Edison Energy Services division.



Application for Services

with the provisions of the applicable (electricity or gas) Con Edison rate not the person responsible for account then you must have a letter from that.



Specifications for Electric Installations Consolidated Edison Co. Inc

Products 200 - 400 Proper wiring adequacy and load balancing is the responsibility of the customer. The customer's Engineer or Licensed Electrical Contractor ...



Fuel Cell Guide

Code (NEC) the National Electrical Safety Code (NESC) and OSHA in effect at the time of construction submits a more detailed Load Letter to Con Edison.



Specifications for Electric Installations Consolidated Edison Co. Inc

Products 200 - 400 It is the Licensed Electrical Contractor's responsibility to be aware of ... Input the request by completing the load letter with further ...



Frequently Asked Questions

other words if a participant increases electric load 15% or more above its baseline

Specifications for Electric Installations Consolidated Edison Co. Inc

Specifications for Electric Installations

Consolidated Edison Co. Inc

2 Consolidated Edison Company of New York (Con Edison)

Electric Service Requirements

Customers

Architects and Engineers

Electrical Contractors

City and County Building Inspectors

Revised May, 2017

2017 Edition

(Supersedes All Previous Editions and Revisions of Electric Blue Book)

The Customer Guide to Electric Service Installation is a Guide to Con Edison requirements and

specifications for establishing electric service to new or remodeled applicant installations. In addition to

the utility requirements, local or state officials may stipulate additional provisions for the installation of

equipment and materials that are in their authorized areas of responsibility and jurisdiction. Should you

have any questions regarding this guide, please contact your local Con Edison Customer Service

Representative (see pg. 3). Consult your assigned Con Edison representative to ensure you are using the

most current standards and specifications. Applicant electric service and meter installation arrangements

planning process as possible.

This document and the information contained within is referenced and compliant with CI-700-1 and New York Public Service Law

§65(15). Any changes or revisions to this document should be made with this in consideration.

DISCLAIMER: This is a guidance document for the convenience of the public. It does not substitute for

any applicable laws, rules, codes or regulations, and information in it regarding procedures is subject

to change without notice. It is the Licensed Electrical Contractor's responsibility to be aware of the

code requirements for the area of the installation. Con Edison does not assume the obligation of enforcing State, City and Local Municipal code requirements.

Specifications for Electric Installations

Consolidated Edison Co. Inc

3

A Customer Guide to Electric Service Installation

Accidents involving dig-ins to underground facilities occur every year. They can damage equipment, and more

importantly, sometimes lead to serious injuries, even death. We want to reduce the number of accidents so we

joined a One-Call-System designed to make it safer for you to dig and work near underground facilities. The customer

shall immediately notify Con Edison of any suspected leakage or escape of gas by calling the company's toll-free

hotline 1-800-75CONED or 1-800-752-6633.

It's the Law! Call before you dig!

Much of the Con Edison equipment that transmits and delivers energy is under the ground, including more than

4,300 miles of natural gas pipelines. We work diligently to keep our systems safe and our excellent safety record

demonstrates that commitment. New York State law requires anyone planning to dig or excavate to call a one-call center two to 10 days in advance. The one-call center will contact Con Edison on your behalf to obtain the necessary clearances, including the locations of all in-ground electrical and natural gas lines near your job site.

UNDERGROUND UTILITIES CALL CENTERS

NYC and WESTCHESTER: 811

NY Code 753 requires 2-10 working days notice.

ELECTRIC AND GAS EMERGENCIES CALL

1-800-75-CONED (800-752-6633)

HEARING IMPAIRED

Toll-free, teletype line

(1-877-423-4372)

Billing and Service inquiries

We think you should know . . . .

At Consolidated Edison Co., when we say: "We're here to help," we mean it! Our responsibility is to provide our

electric customers with safe, reliable and cost effective service. Con Edison operates one of the most complex

electric power systems in the world. It is also the world's most reliable. Before you start planning your project, please

visit https://www.coned.com/en/small-medium-size-businesses/building-project-center to create a Work Request

from your licensed contractor, you will receive correspondence indicating the name and contact number of the

representative handling your case. Please check this site before calling a representative. Our representatives are

responsible for specific geographic territories, or districts. A list of area representatives can be found on-line at

https://www.coned.com/en/small-medium-size-businesses/building-project-center/contact-us. We will be happy to

provide you with information and assistance, as well as ways to save you energy and money.

Specifications for Electric Installations

Consolidated Edison Co. Inc

4

The Con Edison System

For more than 180 years, Consolidated Edison, Inc. has serǀed the world's most dynamic and demanding

marketplace - metropolitan New York while maintaining a safe and reliable electric supply to more than 3 million

customers. We have employees on duty 24 hours a day, 365 days a year to ensure the safety and reliability of our

system.

This guide is intended to protect the mutual interest of our electric customer and Con Edison. Close attention and

adherence to our Electric Specifications will ensure timely and efficient installation of an electric service that meets

your requirements.

This guide will be revised and/or amended as required in keeping with developments and progress in the

electric industry. The latest revision of this handbook may be obtained at: 5

Specifications for Electric Installations

Table of Contents

Consolidated Edison Co. Inc

Quick Start 7

A. Frequently Asked Questions

B. Customer Request for Electric Service - ͞Our Service to You"

C. Electric Work Request Flow Process

D. Standard Service Layouts

Section I General Information 26

A. Purpose

B. Scope

C. Application for Service

D. Contact Information

E. Rates & Terms of Service

F. Identification of Con Edison's Employees

G. Access to Customer's Premises

H. Customer Cooperation

I. Information Inquiries

J. Electric Service Layouts

quotesdbs_dbs7.pdfusesText_5
[PDF] con edison electrical service requirements

[PDF] con edison emergency

[PDF] con edison energy control center

[PDF] con edison energy project center

[PDF] con edison energy services

[PDF] con edison energy services contact personnel

[PDF] con edison energy services project center

[PDF] con edison energy services project center login

[PDF] con edison foil request

[PDF] con edison gas equipment inspection

[PDF] con edison gas leak inspection

[PDF] con edison gas line inspection

[PDF] con edison gas load letter form

[PDF] con edison gas load letter sample

[PDF] con edison gas meter bar