CONSOLIDATED EDISON COMPANY OF NEW YORK INC. 4
These rules are applicable only to customers who do not require interval meters 2) Interval meter – Meter that records interval data and is connected to ...
Commercial Demand Response (Rider T) Program Guidelines
28 févr. 2022 If the account is not billed using an interval meter and there is missing data then a 0% performance factor is applied. Con Edison is not ...
Con Edison Performance-Based Gas Demand Response Pilot
6 août 2021 Con Edison must be able to record and collect hourly gas usage interval data for all. Participating Customers. If a Customer wishes to ...
2020 Demand Response Forum - Con Edison
18 févr. 2020 Goals of Con Edison Demand Response Programs. – 2-Hour Notification Program (DLRP ... Interval meters be installed by application deadline.
SCA Application v3 -- 05-27-2022
7 juin 2022 OhmConnect's proposed SCA method does NOT require an “alternative metering ... ConEd shares access to residential interval meter data via ...
The Consolidated Edison Company of New York 814 Enrollment
1 mai 2017 Not used at Con Edison on Enrollment requests. This data element should not be provided by E/M. If provided on Enrollment request by. E/M the ...
Consolidated Edison - Distributed System Implementation Plan
Table 23: Electric Five-Year System Peak Demand Forecast – Solar PV (MW) . to examine how Con Edison could leverage interval meter data analytics to ...
con edison metering upgrade application
intervals (Interval Metering). The meter using a standard telephone line
Gas Demand Response Pilot Implementation Plan 2021-2022
1 juil. 2021 Con Edison must be able to collect and record hourly gas usage interval data on a daily basis for all. Performance-Based Gas DR offering ...
Installation Requirements for Low Tension Interval and AMI Metering
10 déc. 2020 CONSOLIDATED EDISON COMPANY OF NEW YORK INC. 48- 05 Van Dam Street ... billing system using the interval data from each meter.
CON EDISON METERING UPGRADE APPLICATION
The following information is essential in processing your request. (Please Print)Account name: Site Contact Name: _______
Customer name: Site Contact Number:
Service address: Mailing address: _______
Con Edison account number:
Customer or ESCO Day phone: ( ) - - Fax: ( ) - - Functionality requested - This section outlines, and describes, the most common functionality upgrades and also provides option 'Other'
to cover any extraordinary requests. Select the one that best suits your requirements, sign and return to the address at the bottom of this
form. A Con Edison representative will contact you to discuss details related to your request.Hourly kilowatt-hour readings with daily feedback - provides a 'profile' of kilowatt-hour usage over time, using 60-minute
intervals (Interval Metering). The meter, using a standard telephone line, will collect this data. This line must not be shared and
must be dedicated to the metering equipment. Depending on specific site conditions and circumstances involving meter hardware,
wireless options using public cellular networks could be made available.Continuous 'Real time' energy consumption data - provides a stream of pulses generated in proportion to energy usage. This
pulse stream will be delivered through standard three-wire output (form c dry contacts) terminated at a Con Edison approved demark box and can be used as an input to the customer owned stand-alone energy management system, or monitoring
equipment.Other -
Purpose
Participation in Demand Response Programs Information needed for an Energy Management SystemIntend to use:
Landline Meter with telephone line Other -
Wireless Meter with public I. P. address
Note: If interval metering is selected, the customer will be responsible for the installation and maintenance of a dedicated, working phone line or applicable cellular account. Additional responsibilities are dependent on the meter type.
Landline Meter Responsibilities:
Terminate the telephone line within 2 feet of the meter for a landline meter Clear access for cabling between the meter, phone line termination and all associated equipmentIf phone line is inoperable, a fee of $50 will be assessed on each monthly cycle date until the condition is corrected
Wireless Meter Responsibilities:
Providing a $200 check to "Con Edison Meter Upgrade Program" for determining if a wireless meter is viable. This check should
be sent to 48-05 Van Dam Street LIC NY 11101 Attention Frank Leto.Request for access to meter data on the Con Edison's Customer Care for Energy Management software system must be submitted via
email to IntervalMetering@coned.com. A request submitted by a party other than the entity on the Con Edison account must be
accompanied by a letter of authorization from such entity. For more information, please visit www.coned.com/dr
Return completed application to:
Con Edison
Electric Revenue Meter Shop
48-05 Van Dam Street
Long Island City New York 11101
Email to: LetoF@coned.com 718-393-8951
A Con Edison representative will contact you regarding costs associated with the upgrade. If you decide to move forward, please understand that full payment is required before we proceed with the upgrade. An upgrade application that is submitted by a party other than the entity on the Con Edison account requires a letter of authorization from such entity. Rebates for metering upgrades may be available from the New York State Energy Research and Development Authority, http://www.nyserda.ny.gov
. I understand that it is my responsibility to pursue the potential rebate opportunity. Your signature: Date: / /
quotesdbs_dbs12.pdfusesText_18[PDF] coned letter of authorization
[PDF] coned light bulb replacement program
[PDF] coned loa
[PDF] coned manhattan energy services
[PDF] coned meter installation
[PDF] coned meter reading covid
[PDF] coned meter reading email address
[PDF] coned meter reading jobs
[PDF] coned net metering
[PDF] coned non wires
[PDF] coned nyc benchmarking portal
[PDF] coned operator qualified
[PDF] coned outdoor meter waiver form
[PDF] coned participating contractors