[PDF] [PDF] ENG_Backup_12112019_19-CPA-Q03R (CT 1 Parking Lot

11 déc 2019 · Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: George King Boulevard and Flounder Road at Port Canaveral, Florida It is our will be utilized but updated to save survey costs Task No



Previous PDF Next PDF





[PDF] Governing Rates, Rules & Regulations of Marine - Port Canaveral

1 oct 2019 · 445 Challenger Road, Suite 301│Cape Canaveral, FL 32920 Phone: 321-783- 7831│Fax: RULE 1025: AUTOMOBILE PARKING FEES



[PDF] CANAVERAL PORT AUTHORITY BOARD OF - cloudfrontnet

28 août 2019 · Port Authority at a cost not to exceed $1,900,000 and authorizing RULE 425 – Vehicles on Facilities – Revised for overnight parking needs



[PDF] CANAVERAL PORT AUTHORITY BOARD OF - cloudfrontnet

29 août 2018 · RULE 1025: AUTOMOBILE PARKING FEES Port Canaveral has designated areas for parking privately-owned vehicles at cruise ship facilities 



[PDF] ENG_Backup_12112019_19-CPA-Q03R (CT 1 Parking Lot

11 déc 2019 · Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: George King Boulevard and Flounder Road at Port Canaveral, Florida It is our will be utilized but updated to save survey costs Task No



[PDF] Canaveral Port Authority - Florida Auditor General

17 mar 2017 · In addition, a portion of the Canaveral Port Authority's net position as of recreation entrance and usage fees, fire training, parking fees and 



[PDF] MASTER/VISION PLAN

16 jui 2020 · Alternative parking options near the Port that achieve a lower price Port Everglades than at other ports such as PortMiamiand Port Canaveral



[PDF] Overnight parking along CT

6 août 2018 · parking for a daily entrance fee per day, unless otherwise stated below Highland View Park and Boat Ramp, 110 Angel Fish St , Port St Joe, 



[PDF] T Port Canaveral - stagingfilescmspluscom

Port Canaveral's role in the space program will grow We wanted the Dedicated employee parking lot (215 cars) ▫ 14,500 cost without quality ▫ Project is 



[PDF] City of Cape Canaveral, Florida Adopted Budget

3 sept 2019 · Millage Rate – The FY 2019-2020 General and Library Fund Budgets are redevelopment of Canaveral City Park and the Cape Canaveral 

[PDF] port canaveral status

[PDF] port clinton city limits

[PDF] port everglades carnival terminal

[PDF] port everglades cruises

[PDF] port hedland air quality health risk assessment for particulate matter

[PDF] port noarlunga reef threats

[PDF] port noarlunga south 5167 australia

[PDF] port noarlunga to adelaide cbd

[PDF] port of call

[PDF] portail cours ena ulaval

[PDF] portail des cours ena ulaval

[PDF] portfolio expected return calculator

[PDF] portfolio risk and return questions and answers

[PDF] portfolio standard deviation calculator

[PDF] portfolio standard deviation excel

Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: 11/23/2019 Proposal Code: 19-CPA-Q03REV pg. 1

Proposal Addressed To:

Canaveral Port Authority

Patrick Hammond, PE

Project Manager, Construction

445 Challenger Road

Cape Canaveral, FL 32920

Email:

phammond@portcanaveral.com Thank you for considering CEG for the CPA Cruise Terminal 1 south parking lots expansions project on

George King Boulevard and Flounder Road at Port Canaveral, Florida. It is our understanding that this

project will consist of site design and permitting multiple parking lots with site lighting, landscaping,

site communications, CCTV cameras, updated survey data, and a geotechnical investigation. Per the

Port's request we will include approximately 400 total new spaces subject to final approval of layouts

by the CPA. CEG proposes to provide the following civil engineering site design, permitting and construction

services grouped into separate tasks of work. All drawings and specifications will be complete in order

to provide for competitive bidding, permit approvals, and construction.

CIVIL ENGINEERING

Task No. 1: Design Development (30% DD's)

1. Attend kick-off meeting with the Canaveral Port Authority (CPA) and team meetings in Brevard

County as needed.

2. Prepare site DD's (30% complete) site construction drawings for the purposes of client review and

preliminary construction pricing.

3. Provide 30% cost estimate.

4. Provide PDF format electronic files for client review.

Task No. 2: Construction Documents (100% CD's)

1. Provide 100% signed and sealed CD's based on client comments and input, reports, calculations,

modeling and specifications for site permitting, client review, and for bidding.

2. On-site inspection to review final plans.

3. Provide 100% cost estimate.

4. Provide PDF format electronic files for bidding.

Task No. 3: Landscaping/Irrigation Construction Documents (LCD's)

1. Provide 100% signed and sealed landscaping and irrigation (LCD's) for all green space within the

project area, client review, and for bidding.

2. Provide 30% and 100% cost estimates.

3. Provide PDF format electronic files for bidding.

Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: 11/23/2019 Proposal Code: 19-CPA-Q03REV pg. 2

Task No. 4: Survey Update

1. Provide minimum updated survey by a sub-consultant for the project area. The previous survey

will be utilized but updated to save survey costs.

Task No. 5: Geotechnical Investigation

1. Provide minimum geotechnical investigation for the design and permitting of the parking lot

expansions including summary report with recommendations.

Task No. 6: Civil Engineering Site Permitting

1. Prepare all site permit applications and fees. Attend pre-application meetings with the

CPA and FDEP stormwater.

2. Site plan and landscape/irrigation permitting through the CPA.

3. Erosion/sediment control permitting through the CPA and FDEP.

4. Storm water treatment revision and permitting through the CPA and FDEP.

Task No. 7: Site Electrical and Lighting

1. Complete site visit to verify existing conditions.

2. Lighting Photometrics for proposed parking lot.

3. Exterior electrical plan, for connections to site lighting and on site equipment.

4. Lighting fixtures schedules, controls, details, etc.

5. Provide new electrical service to feed site lighting, gates, and parking pay stations.

Task No. 8: Site Communications and CCTV (Premier Engineering Group sub-consultant)

1. Provide engineering for new site underground communications.

2. Provide engineering for new CCTV Cameras and gate control area

Task No. 9: Construction Services

1. City and state site permits will require a final site inspection, review of as-built drawings, and a

signed and sealed site permit certifications that vary per agency of jurisdiction at an absolute minimum.

2. Review of shop drawings and RFI's.

3. Inspections by CEG only as requested by the client during construction.

Task No. 10: Add Alternative for Attendance of Design Review Meetings

1. CEG civil will cover all team meeting including kick-off, 30%, 90% and pre-construction.

Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: 11/23/2019 Proposal Code: 19-CPA-Q03REV pg. 3

Fee Summary Proposed Fees

Task No. 1: Design Development (30% DD's) $11,000.00 Task No. 2: Construction Documents (100% CD's) $22,000.00 Task No. 3: Landscaping and Irrigation (100% CD's) $6,000.00

Task No. 4: Survey $4,400.00

Task No. 5: Geotechnical Investigation $5,300.00 Task No. 6: Civil Engineering Site Permitting $4,000.00 Task No. 7: Site Electrical and Lighting $16,900.00 Task No. 8: Site Communications & Site CCTV Cameras $17,200.00 Task No. 9: Construction Services $8,000.00 Task No. 10: CEG Meeting Attendance $3,000.00 Reimbursable Expenses Estimated $2,000.00

TOTAL $99,800.00

Execution of this proposal will be required as notice to proceed. Please be advised that our proposed

fee(s) for the above design services will remain firm for thirty (30) calendar days from the date of this

proposal.

Thank you again for the opportunity to provide you our services. If you have any questions please do

not hesitate to call.

Sincerely,

Jake T. Wise, P.E.

Principal Civil Engineer

Managing Member

Construction Engineering Group, LLC

Due to insurance regulations, it is necessary for us to receive a signed copy of this Proposal before

we can begin working on this project. Please sign and return this proposal as direction for us to proceed with the project. Receipt of CAD files and/or direction to proceed with project shall also constitute acceptance of this agreement. This is a confidential proposal between CEG and the Proposal Description: Cruise Terminal 1-South Parking Addition Proposal Date: 11/23/2019 Proposal Code: 19-CPA-Q03REV pg. 4 addressee of this document. The information contained herein shall not be provided to any other parties without written consent of CEG. PURSUANT TO SECTION 558.0035 FLORIDA STATUTES, THE CONSULTANT'S CORPORATION IS THE RESPONSIBLE PARTY FOR THE PROFESSIONAL SERVICES IT AGREES TO PROVIDE UNDER THIS AGREEMENT. NO INDIVIDUAL PROFESSIONAL EMPLOYEE, AGENT, DIRECTOR, OFFICER OR PRINCIPAL MAY BE INDIVIDUALLY LIABLE FOR NEGLIGENCE ARISING OUT

OF THIS CONTRACT.

Patrick Hammond, PE Date

Canaveral Port Authority