[PDF] [PDF] AIS to AIM - ICAO

GANP – Global Air Navigation Plan • GASP - Global Aviation Safety Plan 2016 A4F GmbH – GAF MRCA PA-200 Tornado, Eurofighter A310 MRTT at ILA 



Previous PDF Next PDF





[PDF] Bauplan PA200 Tornado

Tragflächen-M ittelstück 1:1 Vorne hinten Bauplan PA200 Tornado Blattgröße DIN A3 Bauplan PA 200 Tornado Tragflä Blattgr Tragfläche (2x), Maßstab 1 



[PDF] Forces aériennes européennes et mission nucléaire de lOTAN

chasseurs bombardiers équipée de Tornado PA-200 Les Pays -Bas et la cadre du plan d'investissement de l'OTAN, les Pays-Bas pour- raient envisager 



[PDF] AIS to AIM - ICAO

GANP – Global Air Navigation Plan • GASP - Global Aviation Safety Plan 2016 A4F GmbH – GAF MRCA PA-200 Tornado, Eurofighter A310 MRTT at ILA 



[PDF] format PDF - Sénat

3 juil 2019 · plan, suite à l'effondrement du bloc soviétique et en l'absence de menace escadre de chasseurs bombardiers équipée de Tornado PA-200



[PDF] Building a Safe, Secure, and Credible NATO Nuclear Posture

Germany is replacing its PA-200 Tornados with the Eurofighter in most As part of a comprehensive plan to upgrade its nuclear forces, the United States



[PDF] SEPTEMBER 99 FSM - Air Force Safety Center - AFmil

28 mar 2017 · Tornado aircraft, that is 26 Class PRODUCTS NEEDED TO PLAN AND EXECUTE A MISSION, F-4s, and PA 200 Tornados can be spotted



[PDF] B61-12 - Federation of American Scientists

30 mai 2013 · Tornado • F-35A will replace F-16 and Tornado F-16 Falcon PA-200 Tornado Plan for approximately 400 B61-12 makes this the most



[PDF] B61-12 - Federation of American Scientists

2 mai 2014 · Ghedi Torre AB: B61s for Italian Tornados • Aviano AB: F-16 Falcon PA-200 Tornado Plan for nearly 500 B61-12s makes this the most



[PDF] 9 Bericht des Bundesministeriums der Verteidigung zu

2 jui 2019 · ter Future Dispenser System für TORNADO EUROFIGHTER, TORNADO oder A400M) nach Erbringung der Leistungsnach- Plan/EDAP)



[PDF] US Nuclear Weapons in Europe - FragDenStaat

Figure 19: PA-200 Tornado at Büchel Air Base Although NATO stated in 1996 that it had “no intention, no reason, no plan” to station nuclear weapons in new 

[PDF] Bauplan Slowly V2 geteilt A4

[PDF] Bauplan „ Depron-Gleiter, Modell 4 “, Massstab 1:1

[PDF] Bauportal Heft 8

[PDF] Bauprozesse in Frankreich Baden Baden 29_09_2010 - Anciens Et Réunions

[PDF] BauPuzzle

[PDF] Baur au Lac Anfahrt Tram

[PDF] bauratgeber - Volksstimme

[PDF] Baureihe / Series NSSV

[PDF] Baureihe 151

[PDF] BAUREIHE AT4F

[PDF] Baureihe R5 Series R5 Serie R5 Serie R5

[PDF] Baureihen Series Séries • BS 4581 - Anciens Et Réunions

[PDF] Baureihenheft Multi-Eco

[PDF] Baureihenheft Multi-Eco-Top

[PDF] Bausatz für Dachdecker

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 1-Interregional EUR/MID PANS AIM Workshop -Paris

Procedures for Air Navigation Services

(PANS) -Aeronautical Information

Management(PANS-AIM, Doc 10066)

(Council Subject 14.1.2)

Interregional EUR/MID PANS AIM Workshop,

Paris, France, 10.-12. July 2018

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 2-Interregional EUR/MID PANS AIM Workshop -Paris

PANS-AIM -Impact on implementation -

what is the difference?

Interregional EUR/MID PANS AIM Workshop,

Paris, France, 10.-12. July 2018

© 2018ASBU for Future GmbHJuly 10, 2018Page 3-Interregional EUR/MID PANS AIM Workshop -Paris Why?

It is all about

GANP / ASBU support

Priority no. 1 = PBN (RNP)

CDO, CCO, AMAN/DEMAN

Aircraft performance

Environmental sustainability

Noise reduction

© 2018ASBU for Future GmbHJuly 10, 2018Page 4-Interregional EUR/MID PANS AIM Workshop -Paris

Trends to A40

GANP, ASBU, AIM, IM

//GANIS& SANISIndustry Meeting

10. -15.12.2017, Montreal,

Canada

// AN-Conf/13 9. -17.10.2018 //ICAOA40in Q/3 2019 //Unchanged: Main Priority of

ICAO is

implementation of PBN // Therefor we need Digital AIM •2013 •2018Block

0•2019

•2024Block

1•2025

•2029Block

2•2031

•onwardsBlock 3 •GANP -Global Air Navigation Plan •GASP -Global Aviation Safety Plan •ASBU Document

Aviation System Block Upgrads (ASBU)

GANP GASP ASBU July 10, 2018Page 5-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Content / Discussion

// 01 Rational for a PANS-AIM //02AIS-AIMSG Focus //03What is the difference? //04National Planning © 2016 A4F GmbH -GAF MRCA PA-200 Tornado, Eurofighter & A310 MRTT at ILA Berlin

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 6-Interregional EUR/MID PANS AIM Workshop -Paris

// 01 Rational for a PANS-AIM July 10, 2018© 2018ASBU for Future GmbHPage 7-Interregional EUR/MID PANS AIM Workshop -Paris

Rational

Annex = performance based SARPs

PANS = technical & procedural provisions

Elevate certain procedures from guidance to PANS

Support data centricity with processes & procedures

Support interoperability

PANS deviation to be published in AIP only

Supports stepwise transition/migration

Best practice example is PANS-ATM (Doc 4444) which exists since 1946 (Annex 2 & 11 contain no formats) July 10, 2018© 2018ASBU for Future GmbHPage 8-Interregional EUR/MID PANS AIM Workshop -Paris

Timeline (How did we get there)

Initial ideas on AIS-AIMSG/3, Montreal, Nov 2010

ANC on site May 2011

Ad hoc group PANS-AIM on AIS-AIMSG/4, Bordeaux, May 2011 Data and information scope in AIS-AIMSG/7, Montreal, Jan 2014

Since then involvement of IFPP/IWG

Origination & Terminology on AIS-AIMSG/9, Tokyo, April 2014

DQRon AIS-AIMSG/10, Montreal, Nov 2014

Final on AIS-AIMSG/12 in Oct 2015

July 10, 2018© 2018ASBU for Future GmbHPage 9-Interregional EUR/MID PANS AIM Workshop -Paris

AIS AIM

State provisions

(or "what")

Operational Provisions /

"AIM Practitioners" instructions (or "how to")

Guidance / Explanations

150 pages

480 pages (190 AIP)

118 pages41 pages

??? pages (190 AIP)

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 10-Interregional EUR/MID PANS AIM Workshop -Paris

// 02 AIS-AIMSG Focus July 10, 2018© 2018ASBU for Future GmbHPage 11-Interregional EUR/MID PANS AIM Workshop -Paris Focus Split of data origination from data publication requirements

Introduction of the Aeronautical Data Catalogue

Digital data sets

Aeronautical information product (standard or electronic)

Data quality requirements at one place (PANS-AIM)

New terminology

NOTAMimprovement proposal

CRC performance-based requirements

© 2018ASBU for Future GmbHJuly 10, 2018Page 12-Interregional EUR/MID PANS AIM Workshop -Paris Data

Metadata

Data

F(x:y)

Def Rules •Properties

Parameters

Models

Features

(x)(y)

Electronic Chart

Paper Chart

Data Sub-sets

Tables

Data Sub-sets

Next

Intended

User (SWIM?)

Annex 4 (Amd59)

Data ?Annex 15 (Amd40)

PANS-AIM (new)

•Data catalogue •Annex 2, 3, 4, 5, 7, 9, 10v1, 10v2, 10v3, 10v5,

11, 12, 13, 14v1, 14v2,

15, 16v1, 16v2, 17, 18,

19 •PANS-OPS

Source

Origination

Data Management

Products, Applications, Services

Products

Products

Books Text (electronic form) Text

Thematic Data

Sets (e.g. IFP)

Super Set

V4.0

Applicable

8. Nov 2018

Focus: Data

Centric

Approach

July 10, 2018Page 13-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Focus: Data Catalogue (Example AD/HP)

July 10, 2018© 2018ASBU for Future GmbHPage 14-Interregional EUR/MID PANS AIM Workshop -Paris

Processes

Focus:

Processes &

Data Chains

Data Exchange Point

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 15-Interregional EUR/MID PANS AIM Workshop -Paris

// 03 What is the difference?

What moved where?

What is new?

What is the effort to understand that?

July 10, 2018© 2018ASBU for Future GmbHPage 16-Interregional EUR/MID PANS AIM Workshop -Paris

Changes in PANS

-AIM

State provisions

(or "what")

About 120 text relocations

Guidance / Explanations

150 pages

480 pages (190 AIP)

118 pages41 pages

??? pages (190 AIP)

About 20 text relocations

July 10, 2018© 2018ASBU for Future GmbHPage 17-Interregional EUR/MID PANS AIM Workshop -Paris

Assessment of Changes (1)

About

100 text relocations from

Annex 15

20 text relocations from AIS Manual

70 deleted text phrases

240 new text phrases

Effort will be different

Relocated text is known, no new provisions

Some chapters have little change

A lot of changes is because of changed references

Need: to understand what is

really NEW! July 10, 2018© 2018ASBU for Future GmbHPage 18-Interregional EUR/MID PANS AIM Workshop -Paris

Assessment of Changes

(2) July 10, 2018© 2018ASBU for Future GmbHPage 19-Interregional EUR/MID PANS AIM Workshop -Paris

State Letter could be used

Identification & understanding what is really NEW is most important

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 20-Interregional EUR/MID PANS AIM Workshop -Paris

// 03 National Planning &

Implementation

July 10, 2018© 2018ASBU for Future GmbHPage 21-Interregional EUR/MID PANS AIM Workshop -Paris I nitial steps to move

Get your managment on

board

Think about your natural internal alleys

Talk to them

Get your regulator on board

Initiate a work shop

Plan the work, work the plan

PANS-AIM & the paradigm

shift AIS

AIM support the

GANP & PBN

AP, airlines, MIL, ...

Plan Do Check Act July 10, 2018© 2018ASBU for Future GmbHPage 22-Interregional EUR/MID PANS AIM Workshop -Paris

Next Steps (1 to 5 years)

Understand information

managment requirements in PANS-AIM (para 2.1)

Collection

Processing

Quality Control

Distribution

Assess impact on

Make an implementation plan with firm dates for

Personal (training)

Processes (modelling, if not

yet available)

Sofware (procurment)

Hardware (procurment)

Publish the plan in AIP GEN

1.7 when knowledge of

differences is important for the saftey of air navigation

Personal

Software

Processes

Hardware

July 10, 2018© 2018ASBU for Future GmbHPage 23-Interregional EUR/MID PANS AIM Workshop -Paris

Continue -Keep going!

Further work shops with:

your natural allies, your regulator

Keep informed your

managament

Justify investment where

needed

Verify your work

Plan Do Check Act © 2018ASBU for Future GmbHJuly 10, 2018Page 24-Interregional EUR/MID PANS AIM Workshop -Paris

ADDRESS

ASBU for Future GmbH

Uhldingen

-Mühlhofen, Germany INFO

Phone:+49-7556-4521-78-0

E-mail:

info@a4f.aero

Website

: http://asbu4future.aero

© 2018ASBU for Future GmbH/ DocIdNo: PP20180709PRU00xx July 10, 2018Page 25-Interregional EUR/MID PANS AIM Workshop -Paris

Back-Up Slides

Paradigm Shift Visualisation

July 10, 2018Page 26-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Paradigm Shift AIS -AIM

July 10, 2018Page 27-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Paradigm Shift AIS -AIM

July 10, 2018Page 28-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Paradigm Shift AIS -AIM

July 10, 2018Page 29-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Paradigm Shift AIS -AIM

July 10, 2018Page 30-AIM Implementation Strategy Braistorming Session© 2018ASBU for Future GmbH

Paradigm Shift AIS -AIM

© 2018ASBU for Future GmbHJuly 10, 2018Page 31-Interregional EUR/MID PANS AIM Workshop -Paris

Trends -AIM

//Data Centric Approach //Data Sets instead of AIP pages //Incentives for States //3 Types of Services //Data Chain: Origination AIS

Next Intended User

//New Annex 15 totally restructured // New PANS-AIM / Data Catalogue //4Volumes AIS Manual

Three Types of Service for AIS:

1.Aeronautical Information in standardized

presentation (not AIP)

2.Data Sets

3.Distribution (what ever form/way)

Other considerations:

1.ATS Routes are step by step disappearing

2.Ground based navigational aids are replaced by GNSS

3.Area related data get reduced

4.Aerodrome data getting more (AMDB provision in new Annex 15/PANS-AIM/Data Catalogue

5.PBN IFP getting more, an IFR approach can be designed for any location (THR) on earth

Time line (planned)

1.ANC Pre-Liminary Review Nov 2016

2.State Letter

3.ANC Final Review Autumn 2017

4.Publication July/August 2018

5.Applicability Nov 2018

quotesdbs_dbs25.pdfusesText_31