70MM STEP 2 : 2 3 1 2 3 1 4 2 B B A LEFT RIGHT A/B/C B E 21 21 E PLATFORM BED FULL/QUEEN/E-KING SIZE ASSEMBLY INSTRUCTIONS
Previous PDF | Next PDF |
[PDF] PLATFORM BED
70MM STEP 2 : 2 3 1 2 3 1 4 2 B B A LEFT RIGHT A/B/C B E 21 21 E PLATFORM BED FULL/QUEEN/E-KING SIZE ASSEMBLY INSTRUCTIONS
[PDF] Assembly Instructions Platform Bed
Thank you for purchasing your heirloom quality furniture from Montana Woodworks® assembly, please take a few moments to carefully read the instructions,
[PDF] REST BEDROOM
Storage bed features charming bonnet top frame with tufted upholstered headboard and storage drawers in footboard • All scroll work are made of metal and
[PDF] Upholstered Platform Bed Frame Instructions
If you have any questions about your new upholstered platform bed frame, our friendly customer service team would love to answer them Or if by some chance
[PDF] BEDROOM CATALOG - Hibu
furniture updated with our platform bed • Offered with two sizes of cases • Beds are offered with or without storage at the footboard • Black felt lined top drawers
[PDF] PRACTICAL MANUAL - VNMKV Parbhani
The hoe is a versatile form of implements used for many operations i e seed bed preparation, ridge making, channel shaping and weeding It is also for removing
[PDF] Landa SLX, SLT Information Download - Kepner Equipment
Rugged 2" x 4" x 1/8" thick box steel frame, with compact footprint weather- resistant Epoxy Powder Coat finish; Power Platform is vibration instructions for added safety for curb access when the unit is mounted on a trailer or truck bed
Download book PDF
William G Kepner, Jose L Rubio, David A Mouat Fausto Pedrazzini, eds 3 © 2006 Springer Thus, the challenge before the conference assembly was to identify the conclusions they suggested i a “to establish new directions of research on volume of water storage in surface depressions, as well as surface runoff,
[PDF] Manual for the valuaion of ecosystem services and - Life MGN
Manual for the valuation of Ecosystem Services and implementation of PES schemes in agricultural The Manual, together with other tools, such as the WebGIS platform on the (Miller et al , 2002; Kepner et al , 2009) facilities and beds
[PDF] Manual on integrated soil management and conservation practices
This Manual is based on the Training Course for Soil Management and Conservation, focused Schematic profile of an inward-sloping bench terrace showing the platform beds is another practice that increases the depth of rooting without drainage problems The solution is to sow on the ridges ( Kepner et al , 1972)
[PDF] kering annual report
[PDF] key features of cisco packet tracer
[PDF] key features of the eu mexico trade agreement
[PDF] key performance indicators for finance department
[PDF] key performance indicators ppt
[PDF] keyboard alternatives
[PDF] keyboard alternatives for gaming
[PDF] keyboard symbols shortcuts
[PDF] keynote symptoms definition
[PDF] keynotes and redline symptoms of materia medica pdf
[PDF] kiky edward ielts
[PDF] kim works a 4 day workweek that consists of 10 hour days. kim's employer most likely offers
[PDF] kindergarten art curriculum ontario
[PDF] kinds of law
![[PDF] PLATFORM BED [PDF] PLATFORM BED](https://pdfprof.com/Listes/27/30097-27524379.pdf.pdf.jpg)
PARTS AND FITTING PACKAGING DETAIL
BOX #1
A. HEADBOARD PANEL 1 PC
D. FOOTBOARD 1 PC
BOX #2
E. LEFT SIDERAIL 1 PC
G. CENTER SLAT 1 PC
H. CENTER LEG 4 PCS
BOX #3
I. BED SLATS 12 PCS
STEP 1 :
HARDWARE PACKED IN BOX #2
HARDWARE BOX
PHILLIPS HEAD
BOLT 20MM
8PCS1WASHER
8MM 8PCS2METAL PIN
40MM2 PCS3
WOOD SCREW
Ø8X30MM
8PCS4ALLEN BOLT
40MM10
PCS5ALLEN KEY1
PC6TOOL REQUIRED :
PHILLIPS HEAD SCREW
DRIVER (NOT PROVIDED)YOUR BOX
MAY CONTAIN
EXTRA HARDWARE
FIX THE LEFT SIDERAIL (E) TO THE HEADBOARD ASSY
(A/B/C) USING PHILLIPS HEAD BOLTS (1) ANDWASHERS (2).
DO NOT TIGHTEN BOLTS COMPLETELY UNTIL
ASSEMBLY IS COMPLETED.
A B E F 1 A CB. HEADBOARD LEG - LEFT 1 PC
C. HEADBOARD LEG - RIGHT 1 PC
HARDWARE BOX
F. RIGHT SIDERAIL 1 PC
C DI G HHARDWARE* PACKED IN BOX #1
ALLEN BOLT
35MMALLEN KEYPCSPCSPCSPC
12342221
FOLLOW THE ILLUSTRATION, PUT THE ALLEN BOLT IN
THE PREDILLED HOLE ARE TURNING TO UNIFY THE
HEADBOARD LEG (B/C) TO THE HEADBOARD PANEL (A)
*FOR STEP 1 USE HARDWARE PACKED IN BOX #1ALLEN BOLT
55MMALLEN BOLT
70MMSTEP 2 :
2 312 3 1 4 2 B B A LEFT RIGHT A/B/C BE 21
21
E