[PDF] [PDF] Part 7, Survey After Construction - American Bureau of Shipping

1 mar 2016 · ABS RULES FOR SURVEY AFTER CONSTRUCTION 2007 Rule Change Notice (2007) The effective date of each technical change since 



Previous PDF Next PDF





[PDF] Part 7, Rules for Survey After Construction - American Bureau of

The survey interval and survey requirements noted in these chapters only apply to these vessel types The Appendix includes several ABS Guides relating to 



[PDF] Part 7, Survey After Construction - American Bureau of Shipping

1 mar 2016 · ABS RULES FOR SURVEY AFTER CONSTRUCTION 2007 Rule Change Notice (2007) The effective date of each technical change since 



[PDF] ABS Rules for Steel Vessels Certificated for International Voyages

1 avr 2011 · The vessel must have no record of a grounding since the last drydocking, and a Survey must be conducted For a 30-day extension, a general examination of the vessel is conducted For extensions of 31 days up to 90 days, a modified Under Water Survey In Lieu of Drydocking (UWILD) is required



PROPOSED RULE CHANGE FORM - MIT

These requirements apply to and supercede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1 



[PDF] Floating Production Installations - Safety4Sea

1 jui 2020 · years ○ Survey of the FPI hull structure after conversion is to comply with Chapter 1 of the ABS Rules for Survey After Construction (Part 7) for 



[PDF] While references are made to material specifications in Part 2 of

Surveyor during surveys after construction, are to be placed onboard the drilling unit 12 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE 



[PDF] Rules for Building and Classing - engineeringcom

PART 1 Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification – Offshore Units CHAPTER 2 Surveys After Construction



[PDF] (IV-6-1) Classification, Certification and Surveys - DNV GL rules and

(see Rules for Classification and Construction, I - Ship Technology, Part 0 - Classification and Surveys) submit the unit or installation to a survey after

[PDF] abs standard australian classification of countries

[PDF] abs standard indigenous question

[PDF] abs standard motorcycles

[PDF] abs standard on all cars

[PDF] abs standard thru wall skimmer

[PDF] abs standards boat building

[PDF] abs workout plan

[PDF] absentee ballot application

[PDF] absentee ballot deadline

[PDF] absentee ballot georgia

[PDF] absentee ballot new york

[PDF] absentee ballot ohio

[PDF] absolute and comparative advantage

[PDF] absolute humidity covid 19

[PDF] absolute nature of article 3 echr

RULES FOR

SURVEY AFTER CONSTRUCTION

2007

PART 7

American Bureau of Shipping

Incorporated by Act of Legislature of

the State of New York 1862

Copyright 2006

American Bureau of Shipping

ABS Plaza

16855 Northchase Drive

Houston, TX 77060 USA

ii ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007

Rule Change Notice

(2007) The effective date of each technical change since 1993 is shown in parenthesis at the end of the

subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown,

the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2006 Rules

The reference date which is indicated in the parentheses following the title of the requirement in this

Part is the date that the requirement becomes effective [e.g., 7-1-1/3 Definitions (1 July 2006) is to

apply for vessels undergoing survey on or after 1 July 2006].

Notice No. 4 (effective on 1 July 2006) to the 2006 Rules, which is incorporated in the 2007 Rules, is

summarized below. EFFECTIVE DATE 1 July 2006 - shown as (1 July 2006)

Part/Para. No. Title/Subject Status/Remarks

7-1-1/3 Definitions To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1

(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-1-1/7.5 Prompt and Thorough Repairs To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1

(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-1-1/21

(New) Vessels Utilized in Support of Military Operations To account for the differing operational schedule of vessels used in

support of military operations or non-commercial service. (Incorporates Notice No. 4.)

7-2-1/3 Intermediate Surveys To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-2-1/5.5 Unusual Cases To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-2-1/7 Continuous Surveys To align the requirements with IACS UR Z6 (Rev. 5).

(Incorporates Notice No. 4.)

7-2-1/13.3 Extensions To reflect current ABS survey practice. (Incorporates Notice No. 4.)

7-3-1/1 General To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-1/5.1 To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-1/5.3 To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-1/7.1 To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-1/9.3 To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/1.1.2(d) To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/1.1.6 Load Line To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.) ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007 iii

Part/Para. No. Title/Subject Status/Remarks

7-3-2/1.1.9 Suspect Areas To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/1.1.10

(New) Ballast Tanks and Combined Cargo/Ballast Tanks To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/1.1.11 Helicopter Deck To align the requirements with IACS UR Z1 revised due to

replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-3-2/1.7.1 Weather Decks, Hatch Covers and

Coamings To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/1.7.2(a)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.7.2(b)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.7.2(b)iv)

(New) To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/1.7.3(a)ii) Close-up Survey To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.7.3(a)iv) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.7.3(b)ii) Close-up Survey To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.7.3(b)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/1.13.5 Tankers ESP -Ballast Tanks and

Combined Cargo/Ballast Tanks To align the requirements with UR Z10.1 (Rev. 12), UR Z10.3 (Rev. 7) and UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/1.13.6 Chemical Carriers and Chemical

Tank Barges To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23).

(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)iv) Instrumentation and Safety Systems To align the requirements with IACS UR Z16.

(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)vi) Cargo Handling Piping and

Machinery To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-3-2/1.13.7(b)ix) Ventilating System To align the requirements with IACS UR Z16.

(Incorporates Notice No. 4.)

7-3-2/1.13.7(b)x) Spaces in Cargo Areas To align the requirements with IACS UR Z16.

(Incorporates Notice No. 4.)

7-3-2/1.13.8

(New) Access to Bow on Tankers To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-3-2/1.13.9

(New) Emergency Towing Arrangements To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-3-2/1.15.1 Weather Decks, Hatch Covers and

Coamings To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/1.15.2 Cargo Holds To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/1.19.1 Weather Decks, Hatch Covers and

Coamings To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/1.19.2(a)ii) Thickness Measurement To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/1.19.2(b)ii) Thickness Measurement To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.) iv ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007

Part/Para. No. Title/Subject Status/Remarks

7-3-2/3.1 All Vessels To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/3.1.1 Ballast Tanks To align the requirements with IACS UR Z7 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/3.1.5

(New) Survey Planning Meeting To align the requirements with IACS UR Z7 (Rev. 12). (Incorporates Notice No. 4.)

7-3-2/3.7.1 Overall Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/3.7.2 Close-up Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/3.7.3 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/3.7.4

(New) Tank Testing Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/3.7.5 Drydocking Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/3.9.1 Overall Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.9.2 Close-up Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.9.3 Thickness Measurement

Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/3.9.4

(New) Tank Testing Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/3.9.5 Drydocking Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.9.6 Survey Planning To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.15 Tankers Non ESP To align the requirements with IACS UR Z16.

(Incorporates Notice No. 4.)

7-3-2/3.17.1 Piping Systems on Weather Decks To provide more specific requirements for cargo tank venting system

examination. (Incorporates Notice No. 4.)

7-3-2/3.17.2 Overall Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/3.17.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/3.17.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)

7-3-2/3.17.5

(New) Tank Testing Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)

7-3-2/3.17.6 Drydocking Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/3.18.1 Piping Systems on Weather Decks To provide more specific requirements for cargo tank venting system

examination. (Incorporates Notice No. 4.)

7-3-2/3.18.2 Overall Survey Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.18.3 Close-up Survey Require

ments To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/3.18.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/3.18.5

(New) Tank Testing Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.) ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007 v

Part/Para. No. Title/Subject Status/Remarks

7-3-2/3.18.6 Drydocking Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/3.19.1 Overall Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/3.19.2 Close-up Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/3.19.3 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/3.19.4

(New) Tank Testing Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/3.19.5 Drydocking Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/3.23

(New) Chemical Carriers ESP To align the requirements with IACS UR Z10.3 (Rev. 7).

7-3-2/3.23.1: To provide more specific requirements for cargo tank

venting system examination. (Incorporates Notice No. 4.)

7-3-2/5.1 All Vessels To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-2/5.1.6 Overall Survey Requirements To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-2/5.1.7 Protection of Other Openings To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-2/5.1.8 Thickness Measurement

Requirements To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)

7-3-2/5.1.10 Hatch Covers and Coamings To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-2/5.1.14(a)iii) Special Pe

riodical Survey No. 3 (10 < Age

15 Years) To align the requirements with IACS UR Z7 (Rev. 11).

(Incorporates Notice No. 4.)

7-3-2/5.1.16

(New) Bilge and Ballast Piping To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)

7-3-2/5.1.17

(New) Survey Planning Meeting To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)

7-3-2/5.7.1

(New) General To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/5.7.2 Overall Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/5.7.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/5.7.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/5.7.6 Drydocking Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).

(Incorporates Notice No. 4.)

7-3-2/5.7.7

(New) Survey Planning To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)

7-3-2/5.11 Liquefied Gas Carriers To align the requirements with IACS UR Z16.

(Incorporates Notice No. 4.)

7-3-2/5.13.1 General To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/5.13.2 Overall Survey Requirements To provide more specific requirements for cargo tank venting system

examination. (Incorporates Notice No. 4.)

7-3-2/5.13.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.) vi ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007

Part/Para. No. Title/Subject Status/Remarks

7-3-2/5.13.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)

7-3-2/5.13.5 Extent of Tank Testing To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/5.13.6 Drydocking Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).

(Incorporates Notice No. 4.)

7-3-2/5.13.7

(New) Survey Planning To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)

7-3-2/5.14.1

(New) General To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.14.2 Overall Survey Requirements To provide more specific requirements for cargo tank venting system

examination. (Incorporates Notice No. 4.)

7-3-2/5.14.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.14.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.14.5 Extent of Tank Testing To align the requirements with IACS UR Z10.4 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.14.6

(New) Drydocking Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.14.7

(New) Survey Planning To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.15.1

(New) General To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.15.2 Overall Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.15.3 Close-up Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.15.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.15.5 Tank Testing Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.15.6

(New) Drydocking Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/5.15.7 Survey Planning To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/5.19.1

(New) General To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/5.19.2 Overall Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/5.19.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/5.19.4 Thickness Measurement

Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/5.19.6 Drydocking Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).

(Incorporates Notice No. 4.)

7-3-2/5.19.7

(New) Survey Planning To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/5.21

(New) Chemical Carriers ESP To align the requirements with IACS UR Z10.3 (Rev. 7).

7-3-2/5.21.2 provides more specific requirements for cargo tank

venting system examination. (Incorporates Notice No. 4.) ABS

RULES FOR SURVEY AFTER CONSTRUCTION

2007 vii

Part/Para. No. Title/Subject Status/Remarks

7-3-2/9.1.1 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2

(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/9.1.3 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2

(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/9.5

(New) Access to Structures To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 3). (Incorporates Notice No. 4.)

7-3-2/10

(New) Preparations for Surveys of ESDC Vessels To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/11.5.1 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2

(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/11.5.5 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2

(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/13.5 Reporting To align the requirements with IACS UR Z7.1 (Rev. 2) and UR Z10.1

(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)

7-3-2/15 Reporting and Evaluation of Surveys

of ESP Vessels To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)

7-3-2/15.1.2 To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-3-2/15.3 Reporting To align the requirements with IACS UR Z7.1 (Rev. 2).

(Incorporates Notice No. 4.)

7-6-2/1.1.9(i) Remote Controls To align the requirements with IACS UR Z1 revised due to

replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-6-2/1.1.9(n)

(New) Fire Extinguishing Systems To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-6-2/1.1.9(o)

(New) Fire Fighting Systems To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-6-2/1.1.10 Helicopter Operations To align the requirements with IACS UR Z1 revised due to

replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)

7-6-2/1.3.5 Gas Detection To align the requirements with IACS UR Z1 revised due to

quotesdbs_dbs14.pdfusesText_20