1 mar 2016 · ABS RULES FOR SURVEY AFTER CONSTRUCTION 2007 Rule Change Notice (2007) The effective date of each technical change since
Previous PDF | Next PDF |
[PDF] Part 7, Rules for Survey After Construction - American Bureau of
The survey interval and survey requirements noted in these chapters only apply to these vessel types The Appendix includes several ABS Guides relating to
[PDF] Part 7, Survey After Construction - American Bureau of Shipping
1 mar 2016 · ABS RULES FOR SURVEY AFTER CONSTRUCTION 2007 Rule Change Notice (2007) The effective date of each technical change since
[PDF] ABS Rules for Steel Vessels Certificated for International Voyages
1 avr 2011 · The vessel must have no record of a grounding since the last drydocking, and a Survey must be conducted For a 30-day extension, a general examination of the vessel is conducted For extensions of 31 days up to 90 days, a modified Under Water Survey In Lieu of Drydocking (UWILD) is required
PROPOSED RULE CHANGE FORM - MIT
These requirements apply to and supercede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1
[PDF] Floating Production Installations - Safety4Sea
1 jui 2020 · years ○ Survey of the FPI hull structure after conversion is to comply with Chapter 1 of the ABS Rules for Survey After Construction (Part 7) for
[PDF] While references are made to material specifications in Part 2 of
Surveyor during surveys after construction, are to be placed onboard the drilling unit 12 ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE
[PDF] Rules for Building and Classing - engineeringcom
PART 1 Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification – Offshore Units CHAPTER 2 Surveys After Construction
[PDF] (IV-6-1) Classification, Certification and Surveys - DNV GL rules and
(see Rules for Classification and Construction, I - Ship Technology, Part 0 - Classification and Surveys) submit the unit or installation to a survey after
[PDF] abs standard indigenous question
[PDF] abs standard motorcycles
[PDF] abs standard on all cars
[PDF] abs standard thru wall skimmer
[PDF] abs standards boat building
[PDF] abs workout plan
[PDF] absentee ballot application
[PDF] absentee ballot deadline
[PDF] absentee ballot georgia
[PDF] absentee ballot new york
[PDF] absentee ballot ohio
[PDF] absolute and comparative advantage
[PDF] absolute humidity covid 19
[PDF] absolute nature of article 3 echr
RULES FOR
SURVEY AFTER CONSTRUCTION
2007PART 7
American Bureau of Shipping
Incorporated by Act of Legislature of
the State of New York 1862Copyright 2006
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA
ii ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007Rule Change Notice
(2007) The effective date of each technical change since 1993 is shown in parenthesis at the end of thesubsection/paragraph titles within the text of each Part. Unless a particular date and month are shown,
the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2006 RulesThe reference date which is indicated in the parentheses following the title of the requirement in this
Part is the date that the requirement becomes effective [e.g., 7-1-1/3 Definitions (1 July 2006) is to
apply for vessels undergoing survey on or after 1 July 2006].Notice No. 4 (effective on 1 July 2006) to the 2006 Rules, which is incorporated in the 2007 Rules, is
summarized below. EFFECTIVE DATE 1 July 2006 - shown as (1 July 2006)Part/Para. No. Title/Subject Status/Remarks
7-1-1/3 Definitions To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1
(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-1-1/7.5 Prompt and Thorough Repairs To align the requirements with IACS UR Z7 (Rev. 12) and UR Z10.1
(Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-1-1/21
(New) Vessels Utilized in Support of Military Operations To account for the differing operational schedule of vessels used in
support of military operations or non-commercial service. (Incorporates Notice No. 4.)7-2-1/3 Intermediate Surveys To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-2-1/5.5 Unusual Cases To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-2-1/7 Continuous Surveys To align the requirements with IACS UR Z6 (Rev. 5).
(Incorporates Notice No. 4.)7-2-1/13.3 Extensions To reflect current ABS survey practice. (Incorporates Notice No. 4.)
7-3-1/1 General To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-3-1/5.1 To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.) 7-3-1/5.3 To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.) 7-3-1/7.1 To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.) 7-3-1/9.3 To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.) 7-3-2/1.1.2(d) To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.) 7-3-2/1.1.6 Load Line To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.) ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007 iii
Part/Para. No. Title/Subject Status/Remarks
7-3-2/1.1.9 Suspect Areas To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/1.1.10
(New) Ballast Tanks and Combined Cargo/Ballast Tanks To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/1.1.11 Helicopter Deck To align the requirements with IACS UR Z1 revised due to
replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)7-3-2/1.7.1 Weather Decks, Hatch Covers and
Coamings To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/1.7.2(a)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.7.2(b)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.7.2(b)iv)
(New)7-3-2/1.7.3(a)ii) Close-up Survey To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.7.3(a)iv) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.7.3(b)ii) Close-up Survey To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.7.3(b)iii) Thickness Measurement To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/1.13.5 Tankers ESP -Ballast Tanks and
Combined Cargo/Ballast Tanks To align the requirements with UR Z10.1 (Rev. 12), UR Z10.3 (Rev. 7) and UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)
7-3-2/1.13.6 Chemical Carriers and Chemical
Tank Barges To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23).
(Incorporates Notice No. 4.)7-3-2/1.13.7(b)iv) Instrumentation and Safety Systems To align the requirements with IACS UR Z16.
(Incorporates Notice No. 4.)7-3-2/1.13.7(b)vi) Cargo Handling Piping and
Machinery To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)7-3-2/1.13.7(b)ix) Ventilating System To align the requirements with IACS UR Z16.
(Incorporates Notice No. 4.)7-3-2/1.13.7(b)x) Spaces in Cargo Areas To align the requirements with IACS UR Z16.
(Incorporates Notice No. 4.)7-3-2/1.13.8
(New) Access to Bow on Tankers To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)7-3-2/1.13.9
(New) Emergency Towing Arrangements To align the requirements with IACS UR Z1 revised due to replacement of IMO Resolution A.746(18) with A.948(23). (Incorporates Notice No. 4.)7-3-2/1.15.1 Weather Decks, Hatch Covers and
Coamings To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/1.15.2 Cargo Holds To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/1.19.1 Weather Decks, Hatch Covers and
Coamings To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/1.19.2(a)ii) Thickness Measurement To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/1.19.2(b)ii) Thickness Measurement To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.) iv ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007Part/Para. No. Title/Subject Status/Remarks
7-3-2/3.1 All Vessels To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/3.1.1 Ballast Tanks To align the requirements with IACS UR Z7 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/3.1.5
(New) Survey Planning Meeting To align the requirements with IACS UR Z7 (Rev. 12). (Incorporates Notice No. 4.)7-3-2/3.7.1 Overall Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/3.7.2 Close-up Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/3.7.3 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/3.7.4
(New) Tank Testing Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/3.7.5 Drydocking Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/3.9.1 Overall Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.9.2 Close-up Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.9.3 Thickness Measurement
Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/3.9.4
(New) Tank Testing Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/3.9.5 Drydocking Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.9.6 Survey Planning To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.15 Tankers Non ESP To align the requirements with IACS UR Z16.
(Incorporates Notice No. 4.)7-3-2/3.17.1 Piping Systems on Weather Decks To provide more specific requirements for cargo tank venting system
examination. (Incorporates Notice No. 4.)7-3-2/3.17.2 Overall Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/3.17.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/3.17.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)7-3-2/3.17.5
(New) Tank Testing Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)7-3-2/3.17.6 Drydocking Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/3.18.1 Piping Systems on Weather Decks To provide more specific requirements for cargo tank venting system
examination. (Incorporates Notice No. 4.)7-3-2/3.18.2 Overall Survey Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.18.3 Close-up Survey Require
ments To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/3.18.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/3.18.5
(New) Tank Testing Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.) ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007 v
Part/Para. No. Title/Subject Status/Remarks
7-3-2/3.18.6 Drydocking Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/3.19.1 Overall Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/3.19.2 Close-up Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/3.19.3 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/3.19.4
(New) Tank Testing Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/3.19.5 Drydocking Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/3.23
(New) Chemical Carriers ESP To align the requirements with IACS UR Z10.3 (Rev. 7).7-3-2/3.23.1: To provide more specific requirements for cargo tank
venting system examination. (Incorporates Notice No. 4.)7-3-2/5.1 All Vessels To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.)7-3-2/5.1.6 Overall Survey Requirements To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.)7-3-2/5.1.7 Protection of Other Openings To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.)7-3-2/5.1.8 Thickness Measurement
Requirements To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)7-3-2/5.1.10 Hatch Covers and Coamings To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.)7-3-2/5.1.14(a)iii) Special Pe
riodical Survey No. 3 (10 < Age15 Years) To align the requirements with IACS UR Z7 (Rev. 11).
(Incorporates Notice No. 4.)7-3-2/5.1.16
(New) Bilge and Ballast Piping To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)7-3-2/5.1.17
(New) Survey Planning Meeting To align the requirements with IACS UR Z7 (Rev. 11). (Incorporates Notice No. 4.)7-3-2/5.7.1
(New) General To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/5.7.2 Overall Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/5.7.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/5.7.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/5.7.6 Drydocking Requirements To align the requirements with IACS UR Z10.2 (Rev. 17).
(Incorporates Notice No. 4.)7-3-2/5.7.7
(New) Survey Planning To align the requirements with IACS UR Z10.2 (Rev. 17). (Incorporates Notice No. 4.)7-3-2/5.11 Liquefied Gas Carriers To align the requirements with IACS UR Z16.
(Incorporates Notice No. 4.)7-3-2/5.13.1 General To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/5.13.2 Overall Survey Requirements To provide more specific requirements for cargo tank venting system
examination. (Incorporates Notice No. 4.)7-3-2/5.13.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.) vi ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007Part/Para. No. Title/Subject Status/Remarks
7-3-2/5.13.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)7-3-2/5.13.5 Extent of Tank Testing To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/5.13.6 Drydocking Requirements To align the requirements with IACS UR Z10.1 (Rev. 12).
(Incorporates Notice No. 4.)7-3-2/5.13.7
(New) Survey Planning To align the requirements with IACS UR Z10.1 (Rev. 12). (Incorporates Notice No. 4.)7-3-2/5.14.1
(New) General To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.14.2 Overall Survey Requirements To provide more specific requirements for cargo tank venting system
examination. (Incorporates Notice No. 4.)7-3-2/5.14.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.4 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.14.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.14.5 Extent of Tank Testing To align the requirements with IACS UR Z10.4 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.14.6
(New) Drydocking Requirements To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.14.7
(New) Survey Planning To align the requirements with IACS UR Z10.4 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.15.1
(New) General To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.15.2 Overall Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.15.3 Close-up Survey Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.15.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.15.5 Tank Testing Requirements To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.15.6
(New) Drydocking Requirements To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)7-3-2/5.15.7 Survey Planning To align the requirements with IACS UR Z7.1 (Rev. 2).
(Incorporates Notice No. 4.)7-3-2/5.19.1
(New) General To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/5.19.2 Overall Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/5.19.3 Close-up Survey Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/5.19.4 Thickness Measurement
Requirements To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/5.19.6 Drydocking Requirements To align the requirements with IACS UR Z10.5 (Rev. 1).
(Incorporates Notice No. 4.)7-3-2/5.19.7
(New) Survey Planning To align the requirements with IACS UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.)7-3-2/5.21
(New) Chemical Carriers ESP To align the requirements with IACS UR Z10.3 (Rev. 7).7-3-2/5.21.2 provides more specific requirements for cargo tank
venting system examination. (Incorporates Notice No. 4.) ABSRULES FOR SURVEY AFTER CONSTRUCTION
2007 vii
Part/Para. No. Title/Subject Status/Remarks
7-3-2/9.1.1 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2
(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.) 7-3-2/9.1.3 To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2
(Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 1). (Incorporates Notice No. 4.) 7-3-2/9.5
(New) Access to Structures To align the requirements with UR Z10.1 (Rev. 12), UR Z10.2 (Rev. 17), UR Z10.3 (Rev. 7), UR Z10.4 (Rev. 2) and UR Z10.5 (Rev. 3). (Incorporates Notice No. 4.)7-3-2/10
(New) Preparations for Surveys of ESDC Vessels To align the requirements with IACS UR Z7.1 (Rev. 2). (Incorporates Notice No. 4.)