[PDF] dish network programming
[PDF] disinfectant animal safe
[PDF] disinfectant animal shelter
[PDF] disinfectant examples
[PDF] disinfecting cattle sheds
[PDF] disinfection safety
[PDF] disney 10k annual report 2019
[PDF] disney 2019 report
[PDF] disney annual report 2016
[PDF] disney annual report 2017
[PDF] disney annual report 2018
[PDF] disney annual report 2020
[PDF] disney annual revenue 2019
[PDF] disney apexanalytix com default aspx
[PDF] disney app sign up
EXECUTIVE SUMMARY
(HINDI & ENGLISH) with
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENTAL MANAGEMENT PLAN
FOR
RIVER BED MINING PROJECT OF MINOR MINERAL
SAND, BAJRI, & STONE
AT
MAUZA AND MOHAL NANGRAN JHIKLA
Tehsil -and District - Una,
State - Himachal Pardesh
(Government Land)
NAME OF RIVER - SWAN RIVER
Purpose - Fresh Grant,
Proposed Production - 1,13,625TPA
APPLIED LEASE AREA- 05-15-34Hect.,PROJECT COST - 9.8 Lacs
CATEGORY- ΄B
APPLICANTAPPLICANTAPPLICANTAPPLICANT
SH DEVINDER SINGHSH DEVINDER SINGHSH DEVINDER SINGHSH DEVINDER SINGH,,,,
VPO MAINSI INDORA,TVPO MAINSI INDORA,TVPO MAINSI INDORA,TVPO MAINSI INDORA,TEHSIL& EHSIL& EHSIL& EHSIL&
DISTRICT DISTRICT DISTRICT DISTRICT KANGRAKANGRAKANGRAKANGRA,,,, EIA CONSULTANTEIA CONSULTANTEIA CONSULTANTEIA CONSULTANT M/S N.S. ENVIRO M/S N.S. ENVIRO M/S N.S. ENVIRO M/S N.S. ENVIRO ---- TECH TECH TECH TECH LABORATORIES & CONSULTANTLABORATORIES & CONSULTANTLABORATORIES & CONSULTANTLABORATORIES & CONSULTANT
Offi AddOffi AddOffi AddOffi Add----AAAA----8, NEHA MEDICAL 8, NEHA MEDICAL 8, NEHA MEDICAL 8, NEHA MEDICAL
BUILDING, BUILDING, BUILDING, BUILDING,
OPPOSITE ESI HOSPITAL, OPPOSITE ESI HOSPITAL, OPPOSITE ESI HOSPITAL, OPPOSITE ESI HOSPITAL, HASANPURA ROAD, HASANPURA ROAD, HASANPURA ROAD, HASANPURA ROAD,
SODALA, JAIPUR SODALA, JAIPUR SODALA, JAIPUR SODALA, JAIPUR ---- 302 006 (RAJ.)302 006 (RAJ.)302 006 (RAJ.)302 006 (RAJ.)
MOB:MOB:MOB:MOB:---- 09829930877098299308770982993087709829930877
EIA/EMP REPORT SAND, STONE & BAJRI MINE
2
EIA/EMP REPORT SAND, STONE & BAJRI MINE
3
CONTENTS
SL.
NO. PARTICULARS PAGE
NO.
CHAPTER-1:INTRODUCTION
16-44
1.1 Purpose of the Project
1.2 Identification of Project & Project Proponent
1.3 Brief Description of Project
1.4 Regulatory Compliances & Applicable Laws/Regulations
1.5 Generic Structure of EIA Report
1.6 Scope Of The Study
CHAPTER-2: PROJECT DESCRIPTION
45-57
2.0 General
2.1 Type of Project
2.2 Type of Project
2.3 Location Details
2.4 Details Of the Lease area
2.5 Geology
2.6 Mining Methodology
2.7 Geomorphology & soils
2.8 Reclamation
2.9 Mine Waste Disposal
2.10 Project Cost
2.11 Project Implementation schedule
CHAPTER-3: DESCRIPTION OF ENVIRONMENT
EIA/EMP REPORT SAND, STONE & BAJRI MINE
4
3.0 Introduction
58-130
3.1 Land Environment
3.2 Topography & Drainage of the Study Area
3.3 Method of Monitoring
3.4 Observations
3.5 Hydrology and Physiography of the Study Area
3.6 Water Environment
3.7 Soil Environment
3.8 Noise Environment
3.9 Traffic Study
3.10 Biological Aspects
3.11 Socio Economic Environment
EIA/EMP REPORT SAND, STONE & BAJRI MINE
5
CHAPTER-4: IDENTIFICATION OF IMPACTS
4.0 General
131-147
4.1 Land Environment
4.2 Water Environment
4.3 Impacts on Air Environment
4.4 Impacts on Noise Environment
4.5 Impacts on Biological Environment
4.6 Impacts of Solid waste generation & management
4.7 Traffic analysis
4.8 Socio economic Environment
4.9 Occupational Health and Safety
4.10 Mine Closure
4.11 Statutory Requirements
CHAPTER 5. ANALYSIS OF ALTERNATIVES
148
5.1 SITE ALTERNATIVES
5.2 TECHNOLOGY ALTERNATIVES
CHAPTER-6 : ENVIRONMENTAL MONITORING PROGRAM
149-154
6.0 Introduction
6.1 Environmental Monitoring And Reporting Procedure
6.2 The Key Aims of Environment Monitoring are
6.3 Monitoring Methodologies and Parameters
6.4 Monitoring Schedule
6.5 Budget Allocations for Monitoring
EIA/EMP REPORT SAND, STONE & BAJRI MINE
6
6.6 Reporting Schedules Of the Monitoring Data
CHAPTER-7: ADDITIONAL STUDIES
7.0 Public Consultation
155-162
7.1 Disaster Management And Risk Assessment
7.2 Accident during Sand/ Mineral loading, Transportation and
Dumping
7.3 Drawing
7.4 Earthquakes
7.5 Social Impact Assessment, Rehabilitation & Resettlement (R&R) Action Plan
CHAPTER- 8: PROJECT BENEFITS
8.0 General
163-166
8.1 Benefit of Mining
8.2 Employment potential
8.3 Improvements in the Physical Infrastructure
8.4 Health
8.5 Corporate Social Responsibility
CHAPTER- 9: ENVIRONMENT MANAGEMENT PLAN
9.0 Introduction
167-172
9.1 Environment Management Plan
9.2 Environment Management Plan Implementation
9.3 Proposed Setup
9.4 Budget Allocation For EMP Implementation
CHAPTER-10: EXECUTIVE SUMMARY
10.1 Introduction Of Project & Proponent
EIA/EMP REPORT SAND, STONE & BAJRI MINE
7
10.2 Location
173-185
10.3 Mining
10.4 Baseline Data
10.5 Biological Environment
10.6 Water Environment
10.7 Impacts on Air Environment
10.8 Impacts on Noise Environment
10.9 Impacts on Biological Environment
10.10 Impacts on Solid Waste Generation
10.11 Environment Management Plan
10.12 Environment Management Plan Implementation
10.13 Benefits of Mining
CHAPTER-11: DISCLOSURE OF CONSULTANT 186
LIST OF ANNEXURES
ANNEXURE-I LETTER OF INTENT 187-188
ANNEXURE-II WATER AFFIDAVIT 189
ANNEXURE-III JOINT INSPECTION REPORT WITH JAMABANDI & TATIMA 190-195
ANNEXURE-IV SITE PHOTOGRAPHS 196-197
ANNEXURE-V 5KM BUFFER MAP ALONG WITH 1KM BUFFER MAP 198
ANNEXURE-VI GOOGLE EARTH MAP 199
ANNEXURE -VII EVACUATION ROUTE MAP 200
ANNEXURE-VIII SURFACE CUM GEOLOGICAL PLAN 201
ANNEXURE-IX WORKING PLAN 202
ANNEXURE-X PLANTATION AFFIDAVIT 203-04
ANNEXURE-XI CSR AFFIDAVIT 205
ANNEXURE-XII AUTHENTICATED FLORA AND FAUNA LIST BY DFO 206-212
EIA/EMP REPORT SAND, STONE & BAJRI MINE
8
ANNEXURE-XIII MINING OFFICER LETTER 213
ANNEXURE-XIV GRAM PANCHAYAT NOC 214
ANNEXURE-XV EC LETTER 215-217
ANNEXURE-XVI GRANT ORDER 218
ANNEXURE-XVII APPROVED MINING PLAN 219-251
EIA/EMP REPORT SAND, STONE & BAJRI MINE
9
LIST OF TABLES
S.No Particulars Page
1.1 Details of the Project Proponent 17
1.2 Connectivity Details 22
1.3 Point Wise Compliance for TOR 24-44
2.1 Details Of Applicant 47
2.2 DETAILS OF THE LEASEAREA 47
2.3 Group Details 49-50
2.4 Production parameters 51-52
2.5 Water Supply 54
2.6 Waste -Disposal Arrangement 55
2.7 Reclamation Plan 55
3.1 Environmental Setting of the Study Area 59
3.2 Existing Land use pattern of the Study Area 62
3.3 Methods adopted for PM10, PM 2.5, SO2 and
NO 2 65
3.3 (i) Ambient air quality monitoring stations 67
3.3(ii) Ambient Air Quality Status 68
3.3(iii) Ground water sampling locations 78
3.3 (iv) Physico-chemical properties of ground water Study Period - October"2018- December"2018 79-84
3.3 (v) Surface water sampling locations 86
3.3 (vi) Description of soil sampling locations 87
3.3 (vii) Physico-chemical properties of soil 88-94
3.3 (viii) Noise quality monitoring stations 96
EIA/EMP REPORT SAND, STONE & BAJRI MINE
10
3.3 (ix) Noise level status 97
3.4 Mode of data collection & parameters considered
during the survey 102
3.5 (i) Flora of the Core zone 105
3.5 (ii) Flora of the Buffer zone 106
3.6 (i) Fauna of the Core zone 109
3.6 (iv) Fauna of the Buffer zone 112
3.7 Villages for Socio-Economic Survey 115-116
3.8 Demographic Structure In The Study Area 119-120
3.9 Infrastructure Resources Base of The Study Area 128
3.10 Main Worker Employment Pattern 138
4.1 Predicted Ambient Air Quality Concentrations
in Operation Phase Cumulative Concentrations (Baseline + Incremental) for PM 10 138
4.2 (i) Existing Traffic Scenario & LOS 142
4.2 (ii) Modified Traffic Scenario & LOS 143
6.1 Monitoring Schedule 152
6.2 Budget Allocation For Monitoring 154
7.1 Risk capacity criteria 158
8.1 Budget Proposed for Corporate Social
responsibilities Activities 165
9.1 Cost of EMP 171-172
10.1 WATER SUPPLY 175
10.2 BASELINE ENVIRONMENTAL STATUS 176
10.3 COST OF EMP 184
EIA/EMP REPORT SAND, STONE & BAJRI MINE
11
LIST OF FIGURES
S.No. Particulars
0.1 Location Map
0.2 Google Imagery of Mining Lease
2.1 Surface Geological Plan Section The M.L. Area
2.2 Flow Chart Showing the Operation
3.1 Topography Map
3.2 Air Monitoring Stations
3.3 Hyderogeology Map
3.4 Physiography and drainage Map
3.04 Employment Pattern of Working Population in the Study
Area
3.05 Main Workers Employment Pattern of Working Population
In the Study Area
4.1 Evacuation Route Map
DEIA/EMP REPORT ABBREVIATIONS
12
ABBREVIATIONS
AAS/IC
PA : Atomic Absorption Spectrophotometer/Inductively Coupled
Plasma Analyzer
AAQ : Ambient Air Quality
AAQM : Ambient Air Quality Monitoring
AAQS :
Ambient Air Quality Standards
ADM :
Additional District Magistrate
AIS & LUS : All India Soil and Land Use Survey
AMSL : Above Mean Sea Level
ANFO : Ammonium Nitrate - Fuel Oil
APHA :
American Public Health Association
BH : Business Head
BHs : Bore Holes
BIS : Bureau of Indian Standards
BGL : Below Ground Level
CAZRI : Central Arid Zone Research Institute
CC : Calcium Carbonate
CCA : Culturable Command Area
CFM : Cubic Feet per Minute
CWC
Central Water Commission
CPCB : Central Pollution Control Board
CCR : Central Control Room
CSR : Corporate Social Responsibility
CMO : Cement Manufacturing Officer
DFO : District Forest Officer
DGMS : Directorate General of Mines Safety
DMP : Disaster Management Plan
DMG : Department of Mines and Geology
DSB : Differential Sub Basin
DTH : Down the Hole
E : East
EAC : Expert Appraisal Committee
EC : Environmental Clearance
ECO : Emergency Coordinating Officer
EIA : Environmental Impact Assessment
EMC : Environment Management Cell
EMP : Environmental Management Plan
EMP : Environmental Monitoring Programme
DEIA/EMP REPORT ABBREVIATIONS
13
ESE : East of South East
ENE : East of North East
EPA : Environmental Protection Act
ETP : Effluent Treatment Plant
ERDAS : Earth Resources Data Analysis System
EPO : Emergency planning officer
FPS : Fine Particulate Sampler
quotesdbs_dbs20.pdfusesText_26