THE CONTRACTOR MAY SELECT THE TYPE OF BASKET TO BE USED AFTER THE DOWEL BARS FOR EXPANSION JOINTS, THE DOWEL BARS SHALL HAVE EXPANSION CAPS WITH SLAB DEPTH JOINT ASSEMBLY WELDED
Previous PDF | Next PDF |
[PDF] Dowel Basket Anchoring Methods
Types of Dowel Basket Assemblies • Contraction joint ➢Conventional ➢Half- width ➢Tapered baskets ➢Skewed baskets ➢Stepped baskets • Expansion
[PDF] Product Catalog - 1Dayton Concrete Accessories - BuildSite
Tie bar assembly is a basket supporting and positioning rebar dowels of various sizes Highway fiber expansion joint is an environmentally safe, compressible
[PDF] WELDED EXPANSION - ODOT (Oklahoma Department of
THE CONTRACTOR MAY SELECT THE TYPE OF BASKET TO BE USED AFTER THE DOWEL BARS FOR EXPANSION JOINTS, THE DOWEL BARS SHALL HAVE EXPANSION CAPS WITH SLAB DEPTH JOINT ASSEMBLY WELDED
[PDF] Dowel Basket* - SureBuilt
The labor-saving 12' Dowel Basket is placed as a single unit at every planned concrete joint, along with typical chairs and reinforcement The Dowel Basket provides joint stability, reliable load transfer and smooth slab-to-slab transition, in a single cost-effective assembly
[PDF] 9 Paving Operations - INgov
joints, the free end of each bar has an expansion tube attached to the bar Generally, dowel bars are mounted in a welded wire assembly referred to as a basket
[PDF] PAVING - NuWay
joints and it is for that reason that provision must be made to properly transfer load The industry calls this a “welded dowel assembly” and Dayton Superior Paving Type “D” Contraction Baskets and K-5 Type “D” Expansion Baskets are a
[PDF] Best Practices for Jointed Concrete Pavements / Dowel Basket
1 mai 2016 · control activity Dowel dowel bar assemblies or dowel baskets (sometimes also Mislocated dowel too close to the surface causing joint
[PDF] Concrete Pavement Joints - Federal Highway Administration
30 jan 2019 · or control joints, construction joints, isolation joints, and expansion Dowels and tie bars can be pre-placed using basket assemblies and
[PDF] CONCRETE ACCESSORIES Double Tapered Basket® - Sika USA
Place and secure dowel basket assemblies over the subgrade marks doweling systems available for construction, saw cut contraction and expansion joints
[PDF] PV-101 - Iowa DOT
Modified Dowel Assemblies on Sheets 6 and 7 to eliminate reference to 10 JOINTS STANDARD See Bar Size Table for Doweled Expansion Joints Expansion Joints) Ensure dowel basket assembly centerline is within 2 jointing layout
[PDF] dowel baskets manufacturers
[PDF] down south zip codes
[PDF] download 3 tier architecture project in asp.net
[PDF] download 7 zip tutorial
[PDF] download admit card of mht cet
[PDF] download adobe app for chromebook
[PDF] download adobe campaign client console
[PDF] download adobe premiere pro cs6 tutorial pdf
[PDF] download aeronautical charts for google earth
[PDF] download airwatch agent
[PDF] download airwatch agent apk
[PDF] download airwatch agent for windows 10
[PDF] download airwatch cloud connector
[PDF] download all programming languages
1999 SPECIFICATIONSALL DIMENSIONS ON THIS SHEET IN MILLIMETERS UNLESS OTHERWISE NOTED.
R-120M
ROADWAY STANDARD ( METRIC )
OKLAHOMA DEPT. OF TRANSPORTATION
DESCRIPTION
DATEREVISIONS
7/99THE CONTRACTOR MAY SELECT THE TYPE OF BASKET TO BE USED. AFTER THE DOWEL BARS SHALL CONFORM TO MATERIAL REQUIREMENTS OF AASHTO SECTIONBASKET REGARDLESS OF THE WIDTH OF THE BASKET OR THE LENGTH OF THE THE HEIGHT OF THE LOAD TRANSFER UNIT ( MEASURED TO THE CENTER OF THE FOR EXPANSION JOINTS, THE DOWEL BARS SHALL HAVE EXPANSION CAPS WITH
SLABDEPTH
DOWELTOTALDOWEL
DOWELLENGTH
C/CSPACING
SPACING & SIZE DATADOWEL BARS
1SECTION A-A
3.6 m PAVING LANE3.1 m OR AS SPECIFIED
SECTION B-B
EDGE OF PAVING
OR CENTERLINE
A BPLAN VIEW
WELDED CONTRACTION
JOINT ASSEMBLY
WELDED EXPANSION
JOINT ASSEMBLY
B APLAN VIEW
ASSPECIFIED
SECTION B-BSECTION A-A
EDGE OF PAVING
OR CENTERLINE
1.2.3.4.5.6.7.8.9.10.11.
ALL CONSTRUCTION AND MATERIAL REQUIREMENTS SHALL BE IN ACCORDANCE ANY DEVICE USED FOR SUPPORTING DOWELS SHALL HAVE SUFFICIENT RIGIDITY BASKET AND SHALL SAVE THE STATE HARMLESS IN THE USE OF ANY BASKET.PRODUCER AND CONTRACTOR SHALL AVOID PATENT INFRINGEMENT OF THE
B B AND BE HELD IN PLACE DURING CONCRETE PLACEMENT SO THAT DOWELS0 Ga. ( 7.77 mm ) WIRE
3.6 m PAVING LANE3.1 m OR AS SPECIFIED
EXPANSION CAPS ( EXPANSION JOINT ASSEMBLIES ).
250250
50
50
250
250
50
50
A MINIMUM 25 mm AND A MAXIMUM 50 mm AIR SPACE IN THE END OF THE
32 mmAPPROX.
32 mmAPPROX.
11 DOWELS ON 300 mm CENTERS
2 GAGE WIRE ( 6.65 mm)
DOWEL BAR. SEE TABLE THIS SHEET.
GENERAL NOTES
0 GAGE WIRE( 7.77 mm)
mm mm mm mm( TCONCRETE PAVEMENT JOINTSLOAD TRANSFER UNITS FOR
LTU-3 D T 2+2 D T D 2 D TSPOT WELD ALTERNATE ENDS
OF DOWEL
SPACER: FOUR EA. 7 GAGE ( 4.5 mm ) WIRES PER UNIT,SPOT WELD ALTERNATE ENDS
OF DOWEL
NOT PRODUCING THE SPECIFIED RESULTS SHALL BE REJECTED.WILL BE IN SPECIFIED POSITION IN THE FINISHED PAVEMENT. ANY DEVICE DOWEL BARS SHALL HAVE A SHOP APPLIED EPOXY COATING OVER THEIR ENTIRE THE CONTRACTOR SHALL DEMONSTRATE TO THE ENGINEER A STAKING PATTERN IS WITHIN SPECIFICATION LIMITS.THAT SHALL SECURE ALL DOWEL BASKETS SUCH THAT THE FINAL DOWEL POSITION FOR EXPANSION JOINTS, IN ADDITION TO THE SUPPORTS INDICATED, THE CONTRACTOR SHALL PROVIDE SUITABLE INSTALLING DEVICES AND SUCH ADDITIONAL STAKES AS MAY BE REQUIRED TO HOLD THE JOINT FILLER VERTICALAND SECURELY IN LINE AND POSITION. THE CONTRACTOR WILL ALSO BE REQUIRED TO SATISFACTORILY FORM THE UPPER PORTION OF THE JOINT FOR
SPACER WIRE( 5.53 mm )
DIA. PROJECT, UNLESS APPROVED OTHERWISE BY THE ENGINEER./ 1/5 GAGE WIRE ( 5.26 mm)
11 DOWELS ON 300 mm CENTERS
M 31, M 42, OR M 53; GRADE 60. DOWEL BARS SHALL BE CENTERED ON THELENGTH ( ENDS EXCEPTED). ADDITIONALLY, DOWELS SHALL BE COMPLETELY COATED
DATEAPPROVED BY ROADWAY ENGINEER
450450
PAVEMENT, PLUS OR MINUS 1/2 THE DIAMETER OF DOWEL BAR OF THE UNIT.DOWEL BAR FROM THE PAVEMENT SURFACE) SHALL BE 1/2 THE THICKNESS OF THE NOT BE ALLOWED TO EVAPORATE FROM THE BARS PRIOR TO PAVING. WITH A FORM RELEASE AGENT ( OR APPROVED EQUIVALENT BOND BREAKER ) APPLIED IN THE FIELD, IMMEDIATELY PRIOR TO PAVING. THE FORM RELEASE AGENT SHALL
450 mm DOWEL
38 mm EXPAN.
JOINTPAVEMENT SURFACE
JOINT SEALER
( SEE STD. LECS-3 )450 mm DOWEL
T2+PAVEMENT SURFACE
225 75
SAWED TRANS. JOINT
T/3 DEPTH
NOTCHED @ MIDPOINT OFWIRE SPACER IN FIELD AFTER PLACEMENT ( SEE TABLE AT RIGHT ) ( SEE TABLE AT RIGHT ) RECEIVING THE SEAL. SEE 1999 METRIC ROADWAY STD. LECS-3 FOR DETAILS. A A SELECTION IS MADE, THE SAME TYPE BASKET SHALL BE USED THROUGHOUT THE200-250251-400
DOWEL DIAMETER WILL BE DETERMINED BY THE SLAB DEPTH ( T ) OR THE NOMINAL DEPTH WHEN SLAB DEPTH VARIES. WHEN NOMINAL DEPTH VALUE IS TO BE USED, THE CALCULATED NOMINAL DEPTH WILL BE SHOWN ON THE PLANS.
lgc 6/0502MWITH THE 1999 OKLAHOMA METRIC STANDARD SPECIFICATIONS.COLD-DRAWN STEEL WIRE, USED FOR DOWEL BASKETS, SHALL BE ACCEPTED BYVISUAL FIELD INSPECTION, AS PROVIDING SUFFICIENT DOWEL BAR SUPPORT DURING PAVING PROCESS.
Rev. Slab Depth Limits,G. Note 5 RE-ISSUE W/METRIC 1999 SPECS. T300300
31.738.1
lgc 11/02