[PDF] JHR PROJECT - igorrcom



Previous PDF Next PDF







JHR PROJECT - igorrcom

NPE-IP: FRENCH OSIRIS MTR FEEDBACK (1/2) Since the application of the ESPN order in 2005, some pressure equipmentshave been reclassified as nuclear pressure equipments and now liable for in-service monitoring For such nuclear pressure equipments, the presence of INTERNAL INSPECTION means or alternative solutions were not a regulatory requirement



JHR Project Irradiation Devices In-Service Inspection of

Since the application of the ESPN order in 2005, some pressure equipment has been reclassified as nuclear pressure equipment and now liable for in-service monitoring For such nuclear pressure equipment, the presence of internal inspection means or alternative solutions were not a regulatory requirement FIG 6 : view of the OSIRIS Reactor



Osiris The Project 1 Ej Swift - Simplemr

Download File PDF Osiris The Project 1 Ej Swift Osiris The Project 1 Ej Swift Yeah, reviewing a books osiris the project 1 ej swift could grow your close connections listings This is just one of the solutions for you to be successful As understood, achievement does not recommend that you have extraordinary points



Audit des Espaces Publics d’Accès à Internet - Osiris

Université de Paris X Nanterre Mairie de Dakar : Audit des Espaces Publics d’Accès à Internet : Utilisation des TICs pour une qualité de service public et de bonne





RELOCATION BAY: IDENTIFYING A SUITABLE SITE FOR THE TAMPA BAY

last with an average of 17,130 fans per game (ESPN com 2014), it was not enough to sustain consistent fan attendance over the coming seasons Since the 2008 season, the Rays have averaged 20,887 fans per game (Baseball-Reference com 2014) and have been steadily towards the bottom of the league in attendance records while winning close to

[PDF] Définition de la santé et de l 'environnement - HOLISME

[PDF] cours sur la sécurité et la santé au travail pour les consultants et - Pi

[PDF] Sciences de l 'éducation et pédagogie - Philippe Meirieu

[PDF] licence « sciences de l 'education - ispef

[PDF] CAP Pâtisserie - Ensp

[PDF] Cours en ligne ? l 'université

[PDF] STÉ

[PDF] Sciences et techniques sanitaires et sociales - Fontaine Picard

[PDF] 1 Présentation Formation BTS Economie Sociale et Familiale Intitulé

[PDF] COURS HISTOIRE 3ème : LA SECONDE GUERRE MONDIALE

[PDF] Module gratuit - Centre de Formations ? Distance

[PDF] Module gratuit - Centre de Formations ? Distance

[PDF] Secrétariat #8211 Dactylographie - Bureautique - CUY?

[PDF] PROGRAMMES sections européennes HISTOIRE GEOGRAPHIE

[PDF] Cours 1 : Introduction ? la Sécurité des Systèmes d 'Information

| PAGE 1

OUTLINES:

?JHR FACILITY OVERVIEW (REACTOR & EXPERIMENTS). ?NUCLEAR PRESSURE EQUIPMENT REGULATION(NPE). ?FRENCH OSIRIS MTR FEEDBACK. ?NPE INSPECTION: APPLICATION TO JHR DEVICES. ?CONCLUSION.17 NOVEMBRE 2017 | PAGE 2

JHR FACILITY: OVERVIEW

17 NOVEMBRE 2017

MTR designed at 100MWth

•Compact core geometry (60cm diameter), •Reflector in Beryllium, •Light water coolantclosed primary circuit (12 bar pressurisation), - High materials damages capabilities:

15 dpa/year (core),

- High thermal neutrons flux (reflector):

8 x PWR th. neutrons flux,•High experimental platform:

possibility to manage 25 irradiation devices (x13 in the core and x12 in the reflector), •Experimental and exploitation equipments integrated in the facility (NDE systems, FP laboratory, hot cells with specific one for failures rods conditioning). G MICAs

Ageing

material Tests

ADELINE

LWR power

ramps tests

MADISON

LWR cooking

test MOLY SECTOR

Medical application

JHR: EXPERIMENTAL CAPABILITIES

OCCITANE

Vessel Samples

irrad.

RJH: INB n°172N

JHR-CARMEN &

other Start up

DEM devices

core characterisation NIS

Neutron Imaging

System

UGXR (VTT-IDOM)X+gamma rays examinations systems (pools)

LORELEI(IAEC-ROTEM) APRP studies

tests HGXR (VTT-IDOM)X+ gamma rays examination (hot cells) CLOE (BARC-

IGCAR)Materials

corrosion studies

JHR: CODIFICATION , REGULATION , QUALITY

17 NOVEMBRE 2017

JHR: IRRADIATION DEVICES

17 NOVEMBRE 2017

Nuclear

pressure equipment classification by level Impact in the case of equipment failure

Outside nuclear

pressure equipment

Activity released in the case of failure

<= 370 MBq N3

Not classified N1 or N2. Activity

released in the case of failure ranging between 370 MBq and 370 GBq N2

Not classified N1. Activity released in

the case of failure exceeding 370 GBq N1

Impact of a failure rendering it

impossible to return the equipment to a safe state ( according safety report requirements)

17 NOVEMBRE 2017

| PAGE 7

17 NOVEMBRE 2017

| PAGE 8 .h5—͵

NPE REGULATION (CONTINUED)

17 NOVEMBRE 2017

| PAGE 9

NPE-IP: FRENCH OSIRIS MTR FEEDBACK (1/2)

17 NOVEMBRE 2017

| PAGE 10

NPE-IP: FRENCH OSIRIS MTR FEEDBACK (2/2)

NPE-IP: APPLICATION TO JHR IRRADIATION DEVICES

17 NOVEMBRE 2017

| PAGE 11

WIw ķĻǝźĭĻ

Length@

3.3m Int. Diam= 4,4cm

Thickness

@@@9 mm

Zircaloy

17 NOVEMBRE 2017

| PAGE 12

NPE-IP: INCORPORATING PERIODIC

INSPECTION INTO DESIGN

NPE-IP: X RAYS INSPECTION

17 NOVEMBRE 2017

| PAGE 13

17 NOVEMBRE 2017

| PAGE 14

L{L.[9

| PAGE 15

NPE-IP: CONFOCAL OPTICAL MICROSCOPY

[99[{ a!ttLbD /h[hwL{95 a!ttLbD Ћ5

NPE-IP: INSPECTION CARRIER HOLDER SPECIFICATIONS

17 NOVEMBRE 2017

| PAGE 16

‘ ў Њ aa

ў ЌЋЉ aL/whb{

Axial length

JHR NPE-IP: CONCLUDING REMARKS

17 NOVEMBRE 2017

| PAGE 17

17 NOVEMBRE 2017| PAGE 18CEA | 10 AVRIL 2012

quotesdbs_dbs9.pdfusesText_15