[PDF] Installation Instructions Part Numbers: FORD F-250/F-350/F



Previous PDF Next PDF







INSTALLATION INSTRUCTIONS SLIDE-IN DOWNDRAFT RANGES

3 Tip Over Hazard A child or adult can tip the range and be killed Install anti-tip bracket to floor or wall per installation instructions Slide range back so rear range foot is engaged in the slot of the anti-tip bracket



Installation and Care Guide Guide d’installation et d

Veuillez prendre s’il vous plaît quelques minutes pour étudier ce guide En cas de problème d’installation ou de performance, veuillez composer le 1-800-4-KOHLER à partir des É U , le 1-800-964-5590 à partir du Canada, ou le 001-877-680-1310 à partir du Mexique Gracias por elegir los productos Kohler



Model Manufactured Home Installation Standards

The installation criteria in these standards are widely varied and cover a range of subjects As written, the Model Manufactured Home Installation Standards are intended to be applied to new installations, regardless of whether they are at new or existing manufactured housing



Installation Instructions Part Numbers: FORD F-250/F-350/F

Install the passenger side frame bracket as follows: - Using the front mounting hole in the frame brackets as a guide drill a 9/16” hole into the truck frame as shown in Figure A Note : Take precautions for any fuel lines, fuel tank and el ectrical harnesses on the backside of the frame



Barrière à sédiments - Ville de Québec

cie inférieure à 1 ha Elles ne devraient pas être utilisées pour des débits supérieurs à 30 l/s dans un fossé avec un écoule-ment concentré Barrière à sédiments page 1 de 5 Figure 1 Installation de base de barrières à sédiments pour un terrain résidentiel à bâtir (APEL, 2008)



LED Driver Installation Best Practices Guide (041551)

Installation du pilote de DEL Guide de meilleures pratiques Montage du pilote Montez le pilote au ras du luminaire pour permettre un meilleur transfert thermique Évitez de monter la commande à proximité d’une source de chaleur, comme la plaque de recouvrement d’un dispositif ou une source lumineuse Correct Incorrect Boîtier M



CONTROL AND MONITORING SYSTEM - Pentair

L’antenne (s) utilisé pour cet appareil doit être installé pour fournir une distance de séparation d’au moins (20 cm) à partir de toutes les personnes et ne doit pas être co-localisés ou fonctionner en conjonction avec une autre antenne ou un autre émetteur General Installation Information 1



Franc¸ais - assetswpsandwatchcom

lette pour enlever la glace, un entonnoir avec tuyaupour le nettoyage pe´riodique, 4 pieds re´glables avec vis et rondelles − Monter les pieds dans les logements pre´vus aux angles infe´rieurs, comme suit: − Visser les 4 supports filete´s a` l’avant et visser les pieds re´glables sur ces meˆmes supports (Fig )



Etude hydrologique de la plaine de Niéna-Dionkélé : 1 Procès

en considLrant, pour chacun d'eux, 10 pouvoir de régulation, l'oxistence d'un site favorable, l'utilisation de la retenue pour l'irrigation des terres situées dans les parties "hautes" de la plaine La superficie totale des bassins versants situés en amont des trois sites retenus est de 296 km 2, ce qui

[PDF] Guide pour l 'aménagement d 'une installation où sont fournis des

[PDF] Images correspondant ? aménagement garderie pinterest filetype:pdf

[PDF] Guide pour l 'aménagement d 'une installation où sont fournis des

[PDF] Conception et aménagement des postes de travail - INRS

[PDF] Conception et aménagement des postes de travail - INRS

[PDF] Aménagement d 'une structure petite enfance - CQFD Formation

[PDF] Dyspraxie - LADAPT

[PDF] Conseils pour la scolarité des enfants présentant un - ANPEIP

[PDF] #8594 Comment aménager les territoires ultramarins? I/DES

[PDF] Thème 2 Pourquoi et comment aménager le territoire - WordPresscom

[PDF] Leçon n° 4 Aménager pour répondre aux inégalités croissantes

[PDF] Leçon n° 4 Aménager pour répondre aux inégalités croissantes

[PDF] aménager un espace d 'accueil - IEN Illfurth

[PDF] Règlement du Réseau des Bibliothèques de l 'ULg

[PDF] Règlement des bibliothèques - Parisfr

Installation Instructions

FORD F-250/F-350/F-450 (3/4 & 1 TON)

2005 - NEWER SUPERDUTY PICKUP TRUCK

99 - 04 SUPERDUTY PICKUP TRUCK

6-1/2' AND 8' BOX

Part Numbers:

50049

Rev. D4-4-0750049NSheet 1 of 7z2005, 2006, 2007 Cequent Towing ProductsDo Not Exceed Lower of Towing Vehicle Manufacturer's Rating or/

Ne pas excéder les spécifications du fabricant de véhicules de remorquage, ou

4,500 lb./2,040 kg.18,000 lb./8,160 kg.

Max TongueWt./

Poids Max du TimonMax GrossTrailer Wt./

Poids Brut de RemorqueWarning: This hitch is designed to safely carry the loads specified. Under no circumstances do we recommend exceeding the towing vehicle manufacturer's

recommended vehicle towing capacities.

Avertissement:Cet attelage à été crée pour porter sans danger les charges prévues. En au cun cas vous ne devez dépasser les normes de capacités de remorquage

établies par le fabricant de votre véhicule.

THIS PRODUCT COMPLIES WITH SAE STANDARD J-684 / CE PRODUIT SE CONFORME AU STANDARD SAE J-684Parts List - liste des pièces

58058 5

th

Wheel Mounting Rail - Rail de la sellette

NOT INCLUDED - PAS INCLUS2CRight Frame Bracket - support droit du châssis1 BLeft Frame Bracket - support gauche du châssis1ADescriptionQty

Hardware List - liste de la quincaillerie

1/2" Lock Washer - rondelle de blocage104

Existing Brake Cable Hardware 94 & EarlierN/A13Bolt Leader - guide pour boulon2125/8" Nut - écrou2115/8" Lock Washer - rondelle de blocage2102" x 3" Spacer - espaceur295/8" x 2" Hex Bolt - boulon hexagonale281/4" x 1" x 2" spacer - espaceur271/4" x 1-1/2" x 2" spacer - espaceur86U-Shape Spacer - espaceur en U851/2Nut - écrou1031/2" x 1-3/4" Carriage Bolt - boulon de carrosserie

221/2x 2" Carriage Bolt - boulon de carrosserie81DescriptionQty

Tool list - liste des outils

Ratchet and Impact Gun - rochet et fusil d'impact11Measuring Tape - ruban à mesurer10150 ft/lbs (203 N-m) Torque Wrench - clé dynamométrique913 mm Socket - douille de 13 mm8

15/16" Wrench and Socket - clé et douille73/4Wrench and Socket - clé et douille63/4" Step Drill - foret à étape59/16" Drill Bit - foret41/2Drill bit - foret31/8Drill bit - foret2Center Punch - pointeau1

Rev. D4-4-0750049NSheet 2 of 7z2005, 2006, 2007 Cequent Towing Products

Instructions

1. Do not install mounting rails over plastic bed liners. Plastic bed liners must be cut out of the way to provide metal to metal contact. Mounting rails

may be installed on spray in liners

2. Use only bolts, nuts, and washers supplied to install this kit. All bolts are grade 5 and nuts are grade 5 unless specified otherwise.

3. THESE INSTRUCTIONS ARE GUIDE LINES ONLY, ACTUAL INSTALLATION IS THE RESPONSIBILITY OF THE INSTALLER AND THE

OWNER. ALWAYS MEASURE TRUCK AND TRAILER BEFORE INSTALLING HITCH TO BE SURE THAT THERE IS CLEARANCE AT THE CAB

AND AT THE BUMPER TO ALLOW FOR TURNS.

When installing to Figure A & B, during drilling protect the fuel tank and filler tubes, brake lines and wire harness by placing a piece of metal

between the box floor and potential components at risk on the driver's side. This will prevent drilling into theses items.Warning!!

Installation Instructions

1. Lower and remove spare tire.

2. On 99 to 04 vehicles only remove the upper emergency brake cable hanger from the frame of the truck and keep the hardware.

3. Place one mounting rail in the box of the truck, using your tape measure, center the rail between the weld seams on the length of the truck box

floor and the proper distance from the rear edge of the truck box as illustrated in Figure B for options 1 and 2.

4. Mark and center punch the holes as per the illustration in Figure B. Move the rail out of the way and drill each position with a 1/8"drill bit. Warning:

When drilling holes be aware of potential risks to vehicle components and make appropriate safe guards to protect them from damage.

5. Temporarily position the frame bracket on the outside of the frame and check that the 1/8" drilled holes align with the slots of the frame bracket.

Remove the frame bracket from the vehicle.

6. Enlarge the 1/8"drilled holes to 9/16" with the step drill. Warning: When drilling holes be aware of potential risks to vehicle components and

make appropriate safe guards to protect them from damage.

7. Locate the driver side frame bracket as follows:

-On 99 to 04 vehicles, use the hardware removed in step 2. and attach the upper brake cable to frame bracket (A) as shown in Figure A.

-Mount the frame bracket to the vehicle by centering it over the box support with the two clearance holes located over the frame holes as

shown in Figure A, View -Z-

-Attach the bracket to the frame of the vehicle with the 5/8" hardware provided as shown in Figure A and tighten snug to keep the frame

bracket from moving. Use bracket as template to drill forward hole. Use bracket as template to drill rear hole on 2008 and newer trucks.

Locate the passenger side frame bracket as follows:

-Mount the frame bracket to the vehicle by centering it over the box support with the clearance holes located over the shock tower rivets as

shown in Figure A, View -Z-

-Attach the bracket to the frame of the vehicle with the 5/8" hardware provided as shown in Figure A and tighten snug to keep the frame

bracket from moving.

Use bracket as template to drill forward hole. Use bracket as template to drill rear hole on 2008 and newer trucks.

8. Reposition the mounting rail over the holes.

9. Install the 1/2" x 2 " long carriage bolts (1) with the U-shaped spacer (5) to be located in the corrugation between the box and the frame bracket.

Note:The U-shaped spacer will have to be installed before inserting the 1/2" carriage bolts through the mounting rail and box floor. This insures a

metal to metal contact. Attach with spacers (6), lock washers (4), and nuts (3) as per the Figure A and tighten snug to keep the mounting rail from

moving.

10. Place the unassembled 5

th

wheel saddles/slider/goose into the already installed mounting rail. Position the second mounting rail with the

saddles/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight towards the other mounting rail. Ensure that the

mounting rail is centered between the weld seams on the length of the truck box floor. This will position the mounting rail in the correct location and

ensure that the 5 th

wheel will have a snug fit to the truck. NOTE:If more than one hitch product will be used with the rails then both should be used

at the same time to alien the second rail. This will ensure that one product does not compromise the fit of the other.

11. Repeat steps 4, 6, 8 and 9

12. Tighten the 1/2" hardware.

13. Install the driver side frame bracket as follows:

-Using the front mounting hole in the frame brackets as a guide, drill a 9/16" hole into the truck frame as shown in Figure A. Note: Take

precautions for any fuel lines, fuel tank and electrical harnesses on the backside of the frame.

-Slide the spacer (7) over the coiled end of the bolt leader and attach the leader to the 1/2" x 1-1/4" long carriage bolt (2).

-With the other end of the bolt leader, thread it through the back side of the frame and the frame bracket.

-Gently pull on the end of the bolt leader to draw the bolt through the truck frame and then position the bracket on the bolt.

-Remove the bolt leader and install the 1/2" lock washer (4) and nut (3).

14. Install the passenger side frame bracket as follows:

-Using the front mounting hole in the frame brackets as a guide drill a 9/16" hole into the truck frame as shown in Figure A. Note: Take

precautions for any fuel lines, fuel tank and electrical harnesses on the backside of the frame.

-With the coiled end of the bolt leader, thread it through the front side of the frame and out the gap at the top of the shock tower. See Figure

A.

-Slide the spacer (7) over the coiled end of the bolt leader and attach the leader to the 1/2" x 1-1/4" long carriage bolt (2).

-Push the hardware into the shock tower cavity through the gap at the top. -With the other end of the bolt leader, thread it through the back side the frame bracket.

-Gently pull on the end of the bolt leader to draw the bolt through the truck frame and then position the bracket on the bolt.

-Remove the bolt leader and install the 1/2" lock washer (4) and nut (3).

15. After fully installing the 50049 custom attachment brackets, tighten the fasteners in the following sequence. Note: Torque all 1/2" hardware to 72

ft-lbs (98 N-m) and the 5/8" hardware to 150 ft-lbs (203 N-m). First torque the mounting rails to the frame brackets and then torque the

frame brackets to the truck frame.

16. Reinstall spare tire.

Rev. D4-4-0750049NSheet 3 of 7z2005, 2006, 2007 Cequent Towing Products

Use bracket as template to drill rear hole on

2008 and newer trucks.

Use bracket as template to drill forward hole.

FRONT OF TRUCK

DRIVER'S SIDE

Rev. D4-4-0750049NSheet 4 of 7z2005, 2006, 2007 Cequent Towing Products Rev. D4-4-0750049NSheet 5 of 7z2005, 2006, 2007 Cequent Towing Products

Instructions

1. N'installer pas les rails par-dessus un recouvrement en plastic de la boite. Le recouvrement en plastic doit être découper afin d'assurer un contact

de métaux à métaux. Les rails peuvent être installer dans une boite qui est garnis d'un revêtement plastifier

2. Utiliser seulement les boulons, écrous et rondelles reçu pour installer ce produit.

3. C'est instructions doit être utiliser comme guide seulement. L'installation actuelle est la responsabilitée du propriétaire et du responsable

de l'installation. Mesurer toujour le véhicule et la remorque avant l'installation de l'attelage afin d'avoir suffisament de place derrière la

cabine et du pare-choc pour permettre le véhicule de tourner.

Lors de l'installation à l'illustration A et B, pendant le forage, protèger le réservoir à essence en placant un morceau de métal entre le

réservoir et le support de la boite sur le côté du conducteur. Ceci empechera de percer un trou dans le réservoir à essence. Assurer

d'utiliser les boulons de carrosserie de 4" ici seulementAvis!!

Instructions d'installation

1. Enlevez le pneu de rechange.

2. Pour les modèles 99 à 04 seulement, enlevez le support du cable à frein de secour situé sur le châssis et gardez la quincaillerie.

3. Placez une rail de la sellette dans la boite du véhicule. En utilisant un ruban à mesurer, centrer la rail entre les coutures de soudure au long de la

boite et à la distance approprié du coin arrière de la boite comme indiqué dans la figure 2, option 1 et 2.

4. Indiquez et poinconnez le trou comme indiqué dans l'illustration B. Enlevez la rail et perforez chaque trous avec un foret de 1/8".

Attention: Lorsque vous perforez les trous, vous risquez d'endommager certain fils/cables en-dessous de la boite donc utilisez des

précaution afin de les protégés.

5. Positionnez temporairement une plaque de montage contre le châssis et vérifiés à ce que les trous de 1/8" s'enligne avec les trous de les plaques

de montage. Enlevez la plaque de montage par après.

6. Agrandissez les trous de 1/8" à 9/16" avec le foret à étape. Attention: Lorsque vous perforez les trous, vous risquez d'endommager certain

fils/cables en-dessous de la boite donc utilisez des précaution afin de les protégés.

7. Placez la plaque de montage du côté du conducteur comme suit:

- Pour les modèles 99 à 04, utilisé la quincaillerie et installez le support du cable à frein de secour à la plaque de montage (A) comme indiqué

dans la figure A.

- Installez la plaque de montage au châssis en le placant au milieu du support de la boite avec les trous de la plaque pardessus les trous du

châssis comme indiqué dans la figure A, vue - Z -.

- Attachez la plaque de montage au châssis avec la quincaillerie de 5/8po. fournis comme indiqué dans la figure A et serrez le tous pour

garder la plaque de montage en place. Utiliser le support comme gabarit pour percer le trou avant. Utiliser le support comme gabarit pour

percer le trou arrière sur les modèles 2008 et plus récents. Placez la plaque de montage du côté du passager comme suit:

- Installez la plaque de montage au châssis en le placant au milieu du support de la boite avec les trous de la plaque pardessus les rivets du

support de l'amortisseur comme indiqué dans la figure A, vue - Z -.

- Attachez la plaque de montage au châssis avec la quincaillerie de 5/8po. fournis comme indiqué dans la figure A et serrez le tous pour

garder la plaque de montage en place. Utiliser le support comme gabarit pour percer le trou avant. Utiliser le support comme gabarit pour

percer le trou arrière sur les modèles 2008 et plus récents.

8. Replacez la rail de la sellette par dessus les trous dans la boite du camion.

9. Installez les boulons de carrosserie de 2-1/2po. (1) avec les espaceurs en "U" (5) dans le plissement entre la boite et les rails. Notez:Les

espaceur en "U" doit être installé avant d'insérer les boulons de carrosserie autravers les rails de la sellette et la boite du camion. Ceci assure un

contact de métaux à métaux. Attachez le tous avec des espaceurs (6), rondelles de blocage (4), et des écrous (3) comme indiqué dans la figure

'A' et serrez l'assemblage afin d'empêcher les rails de bouger.

10. Placez les selles de la sellette/le glisseur/le goose dans la rail. Placez la deuxième rail a l'aide de les selles de la sellette/le glisseur/le goose et

poussez-le tous vers la première rail. Faite certain que la deuxième rail soit centrer entre la couture de soudure de la boite au long du plancher de

la boite du camion. Ceci assure un meilleur placement de l'unité et assure que les rails seront bien installer. Notez:Si plus qu'un produit est

utiliser avec les rails, installez les deux produits afin d'aligner la deuxième rail. Ceci assure qu'il y aura pas de conflit d'un produit à l'autre.

11. Répétez l'étape 4, 6, 8 et 9.

12. Serrez la quincaillerie de 1/2po.

13. Installez la plaque de montage du côté du conducteur comme suit:

- En utilisant le trou avant dans la plaque de montage comme guide, perforé un trou de 9/16po. dans le châssis du camion comme indiqué

dans la figure A. Note: Assurez d'éviter les lignes et le réservoir d'essence enplus des fils électrique au côté inverse du châssis.

- Glissez un espaceur (7) autravers du guide pour boulon et attachez un boulon de carrosserie de 1/2" x 1-1/4" (2).

- Passez le côté opposé du guide pour boulon autravers du châssis et de la plaque de montage.

- Tirez sur le guide de boulon pour passer le boulon autravers du châssis et positionnez la plaque de montage sur le boulon.

- Enlevez le guide pour boulon et installez la rondelle de blocage (4) et l'écrou (3) de 1/2po.

14. Installez la plaque de montage du côté du passager comme suit:

-En utilisant le trou avant dans la plaque de montage comme guide, perforé un trou de 9/16po. dans le châssis du camion comme indiqué

dans la figure A. Note: Assurez d'éviter les lignes et le réservoir d'essence enplus des fils électrique au côté inverse du châssis.

quotesdbs_dbs5.pdfusesText_9