ANNEX II General Conditions applicable to European Union
15 July 2015 Page 1 of 25 e3h2_gencond_en doc ANNEX II General Conditions applicable to European Union-financed grant contracts for external actions CONTENTS Explanations of the terms used throughout these General Conditions may be found in the ‘Glossary of terms’, Annex A1a to the Practical Guide
General Conditions of Entitlement - Ofcom
22 July 2003 with effect from 1 October 2018 and set revised general conditions with effect from the same date This is an unofficial consolidated version of the revised general conditions which incorporates, for ease of reference, all the modifications made to these conditions since September 2017 in a single document
A201-2007 - General Conditions of the Contract for Construction
This document is not an original AIA ® Contract Document, but a template produced by AIA Contract Documents software for producing a customized document 1 ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion The author may also have revised the text of the original AIA standard form
ANNEX II - General Conditions for PA Grant or Delegation
Procurement Contract: a contract signed between the Organisation, a Co-Beneficiary, Co-Delegatee or an Affiliated Entity and a Contractor under which the Contractor provides services, supplies or works Result: the Output or Outcome of an Action
UN SUPPLIER CODE OF CONDUCT
UN Supplier Code of Conduct Rev 06 – December 2017 2 3 Management, Monitoring and Evaluation: It is the expectation of the UN that its suppliers, at a minimum, have established clear goals
FAIR HOUSING
• Impose different terms or conditions on a loan, such as different interest rates, points, or fees • Discriminate in appraising property • Refuse to purchase a loan or • Set different terms or conditions for purchasing a loan • In addition, it is a violation of the Fair Housing Act to:
Integrated circuits — Measurement of electromagnetic immunity
English Version Integrated circuits - Measurement of electromagnetic immunity - Part 1: General conditions and definitions (IEC 62132-1:2015) Circuits intégrés - Mesure de l'immunité électromagnétique - Partie 1: Conditions générales et définitions (IEC 62132-1:2015) Integrierte Schaltungen - Messung der elektromagnetischen
fixed and movable guards the design and construction of BSI
14120:2015) This European Standard was approved by CEN on 3 October 2015 CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration Up-to-date lists and bibliographical references
Guide Quick Menu
the Work otherwise complies with the conditions stated in this License 5 Submission of Contributions Unless You explicitly state otherwise, any Contribution intentionally submitted for inclusion in the Work by You to the Licensor shall be under the terms and conditions of this License, without any additional terms or conditions
[PDF] Liste des emplois types, extraite des référentiels métiers de la branche
[PDF] CENTRE UNIVERSITAIRE DE TARN-ET-GARONNE
[PDF] Notice Régularisation de dettes
[PDF] Liste des emplois types, extraite des référentiels métiers de la branche (referentiels-metiers.opiiec.fr)
[PDF] LA SOUFFRANCE TOTALE DES PERSONNES EN FIN DE VIE.
[PDF] Information relative aux apparentés
[PDF] Conférence des partenaires
[PDF] République Française Ministère de l'agriculture et de la Pêche. Le Ministre de l'agriculture et de la Pêche
[PDF] Directive de sécurité sur la sauvegarde des données en ligne
[PDF] Contexte et environnement du poste
[PDF] La télésauvegarde est-elle la solution pour réduire les risques quotidiens de la sauvegarde?
[PDF] 0380101D LP PORTES DE L'OISANS - VIZILLE
[PDF] Décrets, arrêtés, circulaires. Textes généraux. Ministère des affaires sociales, du travail et de la solidarité
[PDF] Nos projets Nos références. Nos services Nos outils