Sing Mansion at 466 Des Voeux Road West
Sing Mansion at 466 Des Voeux Road West Please submit the duly completed “Expression of Interest” form (including Parts A, Part B, Part C and Part D with necessary information) in an envelope marked “Expression of Interest for Alte ration & Renovation Works for Shun Sing
WM Chief Investment Office 7 January 2021, 9:20 AM SST
Jan 07, 2021 · at 32/F, Standard Chartered Bank Building, 4-4A Des Voeux Road Central, Hong Kong and is regulated by the Hong Kong Monetary Authority and registered with the Securities and Futures Commission (“SFC”) to carry on Type 1 (dealing in securities), Type 4 (advising on securities), Type 6 (advising on corporate finance) and Type 9 (asset
Communication stratégique pour la Santé
ration et à l’élaboration de la Mme Regina TRAOREnouvelle campagne de com-Directrice Pays CCP Côte d’Ivoire Chers lecteurs, partenaires de la lutte contre le VIH/sida, En ce début d’année, je vou-drais vous adresser au nom de CCP, nos vœux du nouvel an Que cette année 2013 soit une année de succès et de bonheur
Additional Investment in The Bank of East Asia, Limited
September 5, 2014 Sumitomo Mitsui Banking Corporation Additional Investment in The Bank of East Asia, Limited TOKYO, September 5, 2014 --- Sumitomo Mitsui Banking Corporation (SMBC, President &
ROSS M Y YUEN - dcclaw
Sep 14, 2020 · (redevelopment of Nos 99 & 101 Des Voeux Road West) Kannix Limited & Or v Coreluxe Developments Limited & Ors [2020] HKLdT 9 (redevelopment of Nos 326-332 Des Voeux Road West and Nos 11A-11D Sai On Lane; the Tribunal accepted that the developer’s profit should be maintained at 15 (the higher the , the lower the land value) despite the
Le CESC, la 3° institution au service de l’économie et du
ration d’un plan d’action à moyen terme 4/ LE LANCEMENT DE L’ÉTUDE SUR LA SANTÉ À SAINT-B ARTHÉLEMY La commission santé, présidée par M Antoine Querrard, a procédé pendant près d’un an à l’audition des différents interve - nants du secteur et de sa tutelle L’ensemble de ces entretiens a permis de
HANG SENG BANK LIMITED
04 HANG SENG BANK FIVE-YEAR FINANCIAL SUMMARY 1 Partial disposal of shareholding in Industrial Bank Co , Ltd (“Industrial Bank”) in 2015 Reported results for 2015 include a gain on partial disposal of the ordinary shares of Industrial Bank of HK$10,636m
La G N Ration Du Feu 1914 1918 Textes De Charles De Gaulle
V ux du nouvel an de la g n ration Lokpo la nation La G n ration Lokpo a organis des activit s pour pr senter ses voeux du nouvel an la nation Photo N 416636 Voir la photo - 10 janvier 2017 V ux du nouvel an de la g n ration Lokpo la nation essai mazda cx 5 2017 la deuxi me g n ration du suv japonais l 39 essai prix quipements essai
16-17 bonifications familiales - SNES Versailles
ration déjà prises en compte dans le cadre de l’intra 2016 et de l’inter 2017 Une année de stage (2016-2017 ou une année antérieure) peut être prise en compte dans le calcul de la séparation Les années de congé parental et de disponibilité pour suivre conjoint peuvent être prises en compte selon un barème propre dans
« Constituer un véritable campus santé sur le site
ration de restructuration et d’extension du secteur de réanimation et surveil - lance continue, de rénovation de l’ac - cueil central et de création d’un plateau centralisé de consultations, est en cours de réalisation, qui devrait être entière - ment achevée pour la fin de l’été 2021 Sur ce même site, la société Clinalliance
[PDF] 60 citoyens ont couru « Pour La Mémoire » lors du Marseille
[PDF] 60 e - La Voix du Nord - France
[PDF] 60 Écologie - MJC de Sens - Des Bandes Dessinées
[PDF] 60 Éditeur d`équations - Anciens Et Réunions
[PDF] 60 établissements d`hébergement touristique au Maroc
[PDF] 60 exemples de recherche partenariale
[PDF] 60 graines de pinus thunbergii - Anciens Et Réunions
[PDF] 60 Jahre - Bach
[PDF] 60 Jahre DSR Aufgaben des Chefinspektors - vks
[PDF] 60 Jahre ERGO-FIT
[PDF] 60 Jahre Ikonen-Museum Recklinghausen
[PDF] 60 Jahre Porsche Import in der Schweiz.
[PDF] 60 Jahre SSC Werl KEMPER - Sportschützenclub Werl 1955 eV
[PDF] 60 Jahre WTZ Roßlau
Expression of Interest Form
Proposed Alteration and Renovation Works for
Shun Sing Mansion at 466 Des Voeux Road West
We are currently shortlisting Repair/ Maintenance Works Contractors for the Alteration & Renovation Works for Shun
Sing Mansion at 466 Des Voeux Road West.
Please submit the duly completed "Expression of Interest" form (includingPartsA,PartB,PartCandPartD with
necessary information) in an envelope marked "Expression of Interest for Alteration & Renovation Works for Shun Sing
Mansion at 466 Des Voeux Road West for Urban Renewal Authority and addressed to "Mr. Eric Poon, Director of
Works and Contracts Division, Urban Renewal Authority" to the Authority"s office at 26/F, COSCO Tower, 183 Queen"s
Road Central, Hong Kong or fax to 2588 2519 by 12:00p.m. on 16 September 2019 (Monday). Submission beyond
the abovementioned closing date and time will not be considered. The Project Brief is attached in pages 3 and 4 of this EO I Form for your reference. Should you have any queries, please contact our Mr. Sam Mok at 2588 2902 or Ms. Cara Tsang at 2588 2366.Part A. General Information of the Company
Full Company Name
Year in which the Company was established
Registered Address
Contact
(Tel) (Fax) (email)Contact Person/ Position
Registration number as General Building Contractors Current suspension from related contractor list(s) maintained by the government including but not limited to the Hong Kong Housing Authority and Hong KongHousing Society (if any)
Yes/ No
(please delete as appropriate and provide details if "Yes")Part B. Indication of Interest *
We are interested in submitting the tender
and submit herewith details attached.Part C. Supporting Documents *
Please provide the following documents for reference and put a tick in the box if the document is enclosed:-
Copy of Business Registration Certificate Copy of Certificate for registered general building contractor under the Building Ordinance
*: Please tick the appropriate box/ boxes abovePart D. Job Reference
(1) Please provide job experience in being the main contractor of building maintenance and repair works and/or
alteration and addition works to existing residential building(s) or residential portion of composite buildings
with the contract value of the works not less than HK$25,000,000 in Hong Kong which is completed in the
past five (5) years.1 Name of Client/ Consultant
Contact Person / Telephone No.
Project Name and Descriptions
(with site area)Address
Type of Development Residential/ Composite (please delete as appropriate)Contract Sum of relevant works (HK$)
Year of Commencement
Year of Completion
Involve maintenance and repair works Yes / No (please delete as appropriate) Act as Main Contractor Yes / No (please delete as appropriate)Other details of Project (if any)
2 Name of Client/ Consultant
Contact Person / Telephone No.
Project Name and Descriptions
(with site area)Address
Type of Development Residential/ Composite (please delete as appropriate)Contract Sum of relevant works (HK$)
Year of Commencement
Year of Completion
Involve maintenance and repair works Yes / No (please delete as appropriate) Act as Main Contractor Yes / No (please delete as appropriate)Other details of Project (if any)
We understand that the Authority is under no obligation to invite any company which has submitted an expression
of interest to submit a tender. We also acknowledge that the Authority reserves the right to cancel this expression of
interest exercise and/or the tender exercise at any time without prior notification and without giving any reasons at
the Authority"s absolute discretion. In submitting this reply form, we acknowledge and agree with all the terms
contained in the invitation.Name of Company:
Signed by:
Authorized Signature with Company Chop
Date: * Please delete as appropriate.Project Brief
1. Project Background
Building Shun Sing Mansion
Year of Occupation Permit Issued Phase 1 (G/F to 3/F) 1984 / 35 yearsPhase 2 (4/F to R/F) 1990 / 29 years
Total GFA 4710.1 sq.m.
Non-domestic Floors G/F to 3/F
No. of Domestic Floors 4/F to 27/F
No. of flats Part of 4/F is serving as domestic common area for recreation room and management office No. of shops 3 shop (G/F) & 1 shop per floor (1/F to 3/F) No. of lifts 2 nos. (G/F to 27/F) & 1 no. (G/F to 3/F) & 1 no. (G/F to 4/F) (Obsolete)2. Scope of Works
2.1 Renovation to Vacant Units
a) Conversion of the existing typical layout of 8/F to 10/F (inclusively) into a layout of 1-person/ 2-person units;
b) Reinstatement & refurbished works to existing vacant units on 11/F to 27/F (18 units); c) Provision of elderly-friendly facilities for bathrooms at subdivided units;d) Defects rectification to the internal area of the units, including spalling, water seepage, window defects etc. complete
with patch repair to defective area, chemical injection and repainting etc.;e) Replacement of existing concealed electrical wiring and water piping to exposed areas as far as practicable;
f) Separation of electric meters for air-conditioning; andg) Removal of unnecessary fire services installations in units including, but not limited to, sprinkler and fire alarm
system.2.2 Basic Repair Works to Common Area
a) Structural elements repair including patch repair to spalled concrete, crack repair, repainting, etc.;
b) Repairing the substrate of external wall; c) Strengthening the support for conduits and cablings in means of escape staircase; d) Replacement of damaged external pipes;e) Demolition of existing unauthorized building works, such as 300mm projection in front of shop at G/F and
dilapidated drying racks; f) Cleansing the encrustation of underground drains; g) Rectification of damaged door locks and leafs;h) Replacement of sprinkler pumps, fresh & flush water pumps, flush water pipes, switch board at lift machine room
and conduit at roof; and i) Provision of barrier-free access at G/F and staircases.2.3 Enhancement Works to Common Area
a) Retiling of external wall; b) Provision of green building facilities; c) Renovation of G/F lobby; d) Demolition of obsolete lift serving 1/F to 4/F for extension of the flat roof; e) Renovation of common area and recreational facilities at 4/F; and f) Renovation of typical lift lobby.2.4 Smart Building Facilities
a) Preparation of digital maintenance manual; b) Provision of wireless door contact detection system & rear door control; c) Provision of building management platform; andd) Replacement & addition of IP CCTV system for common area such as community storage, laundry, community
room, etc.3. Shortlisting criteria
The contractors shall fulfill the following shortlisting criteria as at the closing date of submitting EOI:
a) The contractor shall be on the URA's List of Repair/ Maintenance Works Contractors (Upper Tier) or Housing
Authority's List of Building Contractors - Building (Maintenance) Group M1 for maintenance and improvement
contracts of value up to HK$50 millionb) The contractor is currently a registered general building contractor under the Building Ordinance;
c) The contractor shall have at least one job reference of being the main contractor of building maintenance and repair
works and/or alteration and addition works to existing residential building(s) or residential portion of composite
buildings with the contract value of the works not less than HK$25,000,000 in Hong Kong which is completed in the
past five years;.d) The latest performance record of the contractor for URA's projects in the past five years, if any, shall not be
unsatisfactory; and.e) The contractor has declared that it is not currently suspended restriction (including voluntary suspension and
restriction) from tendering under any relevant government lists and the lists of Hong Kong Housing Authority and