Construction procedure of wbm road

  • What is the full form of WBM in construction?

    Know More About Test.
    WBM(Water Bound Macadam) conventional method and WMM(Wet Mix Macadam) modern technology- are base course layers for Pavement/Road design.
    In case of WBM stone aggregates and binders are overlaid on one another at the time of construction..

  • What is the process of WMM road construction?

    The following are the procedures involved in the construction of WMM road:

    1. Preparation of Base
    2. Provision of Lateral Confinement of Wet Mix
    3. Preparation of Mix
    4. Spreading of Mix
    5. Compaction
    6. Setting and Drying
    7. Opening to Traffic

  • Steps in Bituminous Road Construction

    1. Preparation of the existing base course layer
    2. Preparation and placing of Premix
    3. Rolling
    4. Finished surface
    5. Quality control

Advantages of WBM Road

Followings are the advantages of WBM road,.
1) It is cost-effective as the cost of construction of Water Bound Macadam road is comparatively low.
2) In the construction of the WBM road, no skilled laborers are required.
3) Water Bound Macadam roads are constructed with the help of locally and easily available materials.
4) If WBM roads are maintaine.

,

Conclusion

In conclusion WBM roads (Water Bound Macadam) have proven to be reliable and cost effective solution for road construction, and the use of coarse aggregate and water in the process of construction result in a durable road surface with good load-bearing capacity, WBM roads exhibit resistance to water damage and it can withstand heavy traffic, making.

,

Cross Section of WBM Road

Following is the WBM road cross-section drawing, Select the method of execution of the work of WBM road construction in PWD

,

Disadvantages of WBM Road

Followings are some disadvantages of WBM road,.
1) The maintenance cost of Water Bound Macadam road is high as compared to the bitumen base course.
2) The overall life span of Water Bound Macadam road is less than the bitumen road.
3) A high probability of danger to traffic and inconvenience is there if these roads do not receive proper maintenance .

,

Maintenance of WBM Road

Within a short period, if any type of potholes or rugs is shown on the newly constructed Water Bound Macadam Road, the concerned authority should repair it by filling it with the required material, and placing the material on potholes should be done properly.
To prohibit aggregate from getting loose from the surface course of the road, a thin layer.

,

Materials Required For The Construction of WBM Road

There are mainly three types of construction materials required for the construction of WBM roads:.
1) Coarse Aggregate.
2) Screening.
3) Binding Material Read More: Types of Road Pavement & Difference between Flexible and Rigid Pavement

,

What is a screening in WBM road construction?

1. 2. 3.
A screening is a construction material used in WBM road construction work to fill the void or space left between aggregate particles after compaction is done.
Generally, construction materials used for screening purposes have smaller sizes compared to coarse aggregate.

,

What is the construction procedure of WBM road?

Construction Procedure of WBM Road.
The subgrade or base course is properly prepared for the required grade and camber of WBM road.
The potholes and the depressions on the surface of the road are properly filled up and compacted.
Before laying of aggregates the shoulders having thickness as that of compacted WBM layer should be constructed.

,

What Is WBM Road

The full form of WBM is Water Bound Macadam Road which is the most commonly used road construction procedure for more than 100 years.
The Water Bound Macadam is named based on the Scottish engineerJohn Loudoun Macadamwho first introduced and construct the WBM road.
Water Bound Macadam is a type of flexible pavement in which the base and surface lay.

,

Which binding material should be used for WBM road construction?

The binding material used for WBM road construction should include:

  • an engineer-approved suitable material with a plasticity index value of less than 6.
    It may not be necessary when the screening used is a crushable type, i.e. murum or gravel. 1.
    Preparation of foundation for receiving the WBM course:.

  • Categories

    Construction procedure of bituminous road
    Construction procedure of flexible pavement pdf
    Construction procedure of rigid pavement
    Construction procedure of earthen road
    Construction procedure of surface dressing
    Construction procedure of well foundation
    Construction procedure of low volume rigid pavement
    Construction procedure of an expansion joint
    Construction procedure of dry lean concrete
    Construction methods pdf
    Construction process pdf
    Construction methods ppt
    Construction process ppt
    Construction process phases
    Construction process project management
    Construction methods philippines
    Construction methods prefab
    Construction process procurement
    Construction procurement methods
    Construction project steps