What is a bulletin in construction?
The "Bulletin" is a vehicle for issuing clarifications or changes to the construction documents.
As it is not defined in the the various AIA General Conditions it is up to the architect using the form to define its use.
Preferably in the General Requirements, and minimally within the form itself.Jul 20, 2022.
What is a bulletin in design?
Bulletins are issued when changes occur that affect the project drawings and specifications after the detail design is complete and a contract is awarded for the project..
What is a construction bulletin?
The "Bulletin" is a vehicle for issuing clarifications or changes to the construction documents.
As it is not defined in the the various AIA General Conditions it is up to the architect using the form to define its use.
Preferably in the General Requirements, and minimally within the form itself.Jul 20, 2022.
What is a project bulletin?
Bulletins are issued when changes occur that affect the project drawings and specifications after the detail design is complete and a contract is awarded for the project..
What is the difference between a bulletin and an addendum?
Since you are defining it, you can use it however you want.” Heather Salisbury CSI, AIA, LEED AP, agreed, adding, “In my 25 years of practice an addendum is a modification prior to contract award and a bulletin is after award.
They look the same as far as how the list of changes are shown..
What is the difference between a construction addendum and a bulletin?
Bidding/Procurement Documents
Tips: An addendum is to modify or clarify the procurement documents issued for bid.
It's issued after you issue a bid set and before a contract is awarded.
After a contract is awarded, any documents issued to make changes to the project are issued as bulletins..
- Addendum (Addenda)
Written information adding to, clarifying or modifying the bidding documents.
An addendum is generally issued by the owner to the contractor during the bidding process and as such, addenda are intended to become part of the contract documents when the construction contract is executed. - Since you are defining it, you can use it however you want.” Heather Salisbury CSI, AIA, LEED AP, agreed, adding, “In my 25 years of practice an addendum is a modification prior to contract award and a bulletin is after award.
They look the same as far as how the list of changes are shown. - The Bulletin (BLTN) process is used to formally issue changes to the construction documents (drawings and/or specifications) after the construction contract has been issued.
For this process, “Bulletin” includes what are often referred to as ASI's (Architect's Supplemental Instructions).