F-150 Lightning Tech Specs
Two inboard three-phase fixed magnet AC motors. Targeted Peak Power (hp/kW)* Onboard charger power (input/output). 11.3 kW/10.5 kW. 19.2kW/17.6 kW.
F Lightning Tech Specs
Analog AC/DC and Isolated DC/DC solutions for Automotive HEV
25 sept. 2018 An On Board Charger is used in an electric vehicle (EV) or hybrid electric vehicle (HEV) to ... Level 2: Split phase: AC power 19.2 kW.
analog ac dc and isolated dc dc solutions for automotive hev ev applications det tech day mo b
Power Topologies in Electric Vehicle Charging Stations
An AC charger powers the EV battery through the vehicle's on-board charger while a DC charger directly approximately 19.2 kW. Approximately 8 Hours.
A Single-Phase Integrated Onboard Battery Charger Using
The level-2 onboard chargers have power levels up to 19.2kW (with typical power levels as. 3.3kW and 6.6kW) [5]. On the other hand off-board chargers are
aam
Fast Charger Alternatives
AC level 2. (SAE J1772™). PEV includes on-board charger (see below for different types). 240 V up to 19.2 kW (80 A). Est. charge time for 3.3 kW on-board
D PEV D Kissel on SAE
Print Preview - NHTSA
3 mar. 2021 WMB4 - Replacing High-Voltage Charger (OBC) (Stop Delivery). Model Line: Taycan (Y1A). Model Year: 2021. Equipment: 19.2 kW on-board AC ...
MC
Webinar Power electronics and drives for automotive applications
7 sept. 2021 ac Charging GB/T 20234.2. Onboard. Chargers. EV Charging. Infrastructure ... 19.2 kW. 32 A. 32 A. 16 A. 32 A. 48 A. Europe Australia.
Webinar presentacion SRI comprimido
Design Considerations for a Level-2 On-Board PEV Charger Based
Abstract—In this paper a two-stage on board battery charger is intermediate charging power level rated up to 19.2kW
wang itec
Taking charge of electric vehicles – both in the vehicle and on the
parts: a charging station which is also called electric An onboard 3.3 kW charger can recharge a ... ~3.1 kW to ~19.2 kW. ~8 hours. DC charging ...
Design of Transformerless Electric Vehicle Charger with Symmetric
three levels: ac level 1 (< 1.92 kW) ac level 2 (< 19.2. kW)
TechnicalInformation
Service
35/21ENUWMB42
WMB4- Replacing High-Voltage Charger(OBC) (Stop Delivery)ModelLine:Taycan (Y1A)
ModelYear:
2021Equipment: 19.2 kW on-board AC charger(I-no. KB4)
Concerns:High-voltage charger (OBC)
Information:There isa possibility that the high-voltage charger (OBC)doesnotmeet the specifications on
the affected vehicles.This can cause the AC charging function to fail.
Information
Beforecarryingout this campaign,checkwhether other campaigns must be carriedout on therelevant vehicles. On vehiclesaffectedbycampaignWMA6 -Updating software for variouscontrolunits (VR12.1.1)in addition to this campaign,alwaysmake sure that campaignWMA6is alsocarried out after carrying outthis campaign. Action required: Replace high-voltage charger(OBC).Affected
Vehicles:Only vehicles assigned to the campaign (see also PCSS Vehicle Information).AfterSales
Mar 3,2021
Page 1 of 7
Service
2WMB4ENU35/21
Technical Information
Installation
Position:
Installation position ofhigh-voltage charger (OBC)1- High-voltagecharger(OBC), 19.2 kW (replace)
Required parts and materials
PartsInfo:
PartNo. Designation
-UseQty.NorthAmerican vehicles
9J1915681AKHigh-voltage battery charger(OBC), 19.2 kW
- Charging socket Combi1 (North America region)1ea. or(depending on the EU country variant)9J1915681AHHigh-voltage batterycharger(OBC), 19.2kW
- Charging socket Combi2 (EU)1ea.Additional partsrequired:
PAF106825Cheese head bolt, M8x 50
-Struttobody4ea.Mar 3,20
21Page 2 of 7
AfterSales
TechnicalInformation
Service
35/21ENUWMB42
Materials: (Only ifrequired)
Part No. Designation
Qty.00004330516Coolant additive,20 liter/5.28 galcontainer
-Cooling systemAs much asrequired (approx. 1 liter/ 33.8 fl oz. required per vehicle)Required tools
Information
The Taycan (Y1A)isequippedasstandardwith alithium starterbattery. Lithium starter batteriesmust only be charged using asuitable battery chargerthathasa current andvoltage-controlled charge map. For furtherinformation about the battery chargers to be used,seeWorkshop Manual'270689
Charging battery/vehicleelectricalsystem'.
Tools: •VAS 6883 Insulatedtoolset
•VAS 6558A High-voltage testing module •VAS 6558/9-6 High-voltage test adapter HVA 280 •VAS 6410 ContactSurface Cleaning Set •T40262 -Lockingcap •9696 - Filling device •3093 - Hoseclamp •VAS 6675A Funnel •VAS 6968 Coolantfilling device •VAS6096/2 Vacuum pump •VAG 1274B Cooling system tester •VAS 6890 Spring band clamp pliers •VAS 6935 Pole terminal puller • Torque wrench, 2 - 10 Nm (1.5 - 7.5 ftlb.),e.g.VAG 1783 Torque wrench,2-10 Nm (1.5-7.5 ftlb.) • Torque wrench, 6 - 50 Nm (4.5 - 37 ftlb.), e.g.VAG 1331A Torque wrench,6-50 Nm (4.5-37 ftlb.) • Torque wrench, 20- 100Nm (15- 74ftlb.),e.g.VAS 5820 Torquewrench, 20-100 Nm (15-74
ftlb.) • Electronictorque angle torque wrench, e.g.9768 -Electronictorque wrench,2 -100 Nm (1.5 -74 ftlb.)
• Battery chargerwith acurrent rating ofat least 90 Aandacurrent and voltage-controlled charge mapforlithium starter batteries,e.g.VAS 5908 Battery charger 90 A •9900 - PIWIS Tester3AfterSales
Mar 3,2021
Page 3 of 7
Service
2WMB4ENU35/21
Technical Information
Replacinghigh-voltage charger(OBC)
WARNING
Incorrect handling of high-voltage components
• Electric shock • Riskofshortcircuit •Fire • Risk ofexplosion Only appropriately trained and authorized personsare permitted to work on high-voltage vehiclesand components. Required qualification: Highvoltage technician or highvoltage expert. Observe national requirementsand legislationforthiswork. Always use insulatedtools,e.g. Insulated toolset,when working onthese components. Observe general warning notes for working on the high-voltage system.Workshop Manual '2X00IN
Generalwarning notes for working onthe high-voltage system'Information
Only relevantfor vehicles with the Connect app "Plug & Charge" Beforeremoving the high-voltage charger(OBC),read out the customersettings for the Connect app "Plug& Charge" in the displayand operator controlunit anddocument them. After installingand teaching thenew high-voltage charger(OBC), restore the customer-specific settings fortheConnect app "Plug &Charge".
WorkProcedure: 1 Observegeneralwarning notes for workingon thehigh-voltage vehicleelectricalsystem Workshop Manual'2X00IN Generalwarningnotesfor working on the high-voltagesystem'.2 Isolate the high-voltage system from the power supply
Workshop Manual'2X00IN Isolating
high-voltage system from power supply/Starting high-voltage system'.Information
Handling high-voltage lines:
• Do not support yourselforyour tools on high-voltage lines andtheir components. • Work involving metal-removing,deformingand sharp-edgedtools close to high-voltagecomponents andlines is prohibited. • Work involving heat s ources such as welding,soldering, hot air and thermalbonding close to high-voltage componentsand lines is prohibited.Mar 3,20
21Page 4 of 7
AfterSales
TechnicalInformation
Service
35/21ENUWMB42
• High-voltagelinesmustnotbeextensivelybent or kinked. • Avisual inspectionofthehi gh-voltageconnectors mustbeperformedbefore installing the high-voltage lines.Ifth erearesignsofdamaget otheconnectors,con tactsandseals,the high-voltage linemustbe replaced. • Ifyouhavequestions orifyouareunclearaboutanything,consultt herelevant highvoltagetech- nician.3Replacehigh-voltagecharger(OBC).
For instructions,seeWorkshopManual'279719RemovingandinstallingkWhigh-
voltage charger'PartNo. DesignationQty.
NorthAmeri caregion
TechnicalInformation
Service
35/21ENUWMB42
WMB4- Replacing High-Voltage Charger(OBC) (Stop Delivery)ModelLine:Taycan (Y1A)
ModelYear:
2021Equipment: 19.2 kW on-board AC charger(I-no. KB4)
Concerns:High-voltage charger (OBC)
Information:There isa possibility that the high-voltage charger (OBC)doesnotmeet the specifications on
the affected vehicles.