Baumit StarTex PDS_StarTex _Produckt (-)
Fiche Technique produit. (03/2021). Baumit SAS. 29 Rue de l'Ormeteau
Baumit StarTex Alkaline resistant glass fibre textile mesh
Baumit StarTex reinforcing mesh must be covered with at least 1mm (0.5 – 3 mm max. at the over-lapping edges) reinforcement mortar. A further 1-2mm of the
Alto
Product Data Sheet Baumit StarTex
StarTex Fein Feines schiebefestes
https://baumit.de/files/de/pdf_files/pds_startex_160___startex_fine_bde_de_58195.pdf
Baumit StarTex Rete portaintonaco
Rete in fibra di vetro resistente agli alcali per Sistemi Baumit di Annegare la rete portaintonaco Baumit StarTex
Baumit StarTex 145 Baumit Malla de Fibra de Vidrio
Aplicación. Refuerzo de la Superficie: Una vez que el mortero utilizado en el pegado de las placas haya fraguado se lijarán superficialmente y limpiarán
Baumit StarTex Coarse 200 Reinforcing Mesh General Information
Warp and alkali-resistant glass fibre mesh. Tested system component for the reinforcement of Baumit renders onto Baumit external wall insulation (EWI) systems.
Baumit StarTex Plas? din fibr? de sticl? Premium
?p?cluire. Se va aplica adezivul cu spaclul cu dinti de 10 mm apoi se înglobeaz? în proasp?t plasa de fibr? de sticl? în f??ii verticale.
Baumit StarTex Sklotextilná sie?ka na vystuženie lepiacej malty.
Žižková 9 SK-811 02 Bratislava - www.baumit.sk - baumit@baumit.sk Baumit. StarTex nie je vhodná na vystužovanie jadrových omietok. Technické údaje.
StarTex Fein
Tissu d'armature pour la fabrication de couches d'armature dans tous les systèmes composites d'isolation thermique Baumit. ? Pour la fabrication de couches
Baumit StarTex
Product
Alkaline resistant, glass fibre textile mesh to be used in Baumit ETICS.Tested according to ETAG 004.
Composition
SBR coated glass fibres (styrene butadiene rubber).Properties
Optimised load failure and expansion.
Application
Used within the base coat render (reinforcement layer) of ETICS and for strengthening general base coat renders and plasters.Technical data
Mesh size: approx. 4x 4 mm Surface/weight ratio: 145 g/m² Tensile strength: 2000 N/50 mmTensile strength after ageing: 1000 N/50 mm
Material requirement: 1,1 m²/m²1 roll covers: app. 45 m²
Storage Store upright in a dry place
Quality
assurance In house monitoring through our own laboratories and third party inspec- tion of our control procedures through a notified body.Delivery format
50 m² roll, (width 1 m, length 50 m), 1 pallet = 33 rolls = 1650 m²
Health and
Safety
Not subject to labelling requirements!
Processing
Area reinforcement:
After sufficient hardening of the adhesive application the insulation boards can be sanded down and the dust removed. Baumit Mineral façade insu- lation boards cannot be sanded down. Here a levelling layer is applied onto the boards after the anchors have been installed. A waiting time of 3 days before application of the reinforcement layer must be observed. The reinforcement layer is applied to the boards with a stainless steel notched trowel (10 mm notches). Continuous sheets of StarTex reinforcing mesh, free of creases and with 100 mm overlapping edges are embedded into the fresh reinforcement mortar. The StarTex reinforcing mesh must be covered with at least 1mm (0.5 3 mm max. at the overlapping edges) reinforcement mortar. A further 1-2mm of the reinforcement mortar is ap-StarTex reinforcing. Observe a wait-
ing time of at least 7 days prior to the application of further coatings.Diagonal reinforcement:
Embed Baumit StarTex strips into the reinforcement mortar diagonally across the corners of windows and doors prior to reinforcing the main ar- eas. The reinforcement strips must be at least 20 x 30 cm. Product Data Sheet, Baumit StarTex, State 03/2012 2 / 2Building corners:
Where building corners are formed using Baumit corner beads with mesh, the whole mesh wings must be fully embedded in the rein- forcement mortar. If the profiles are not used, then the corners must be formed during the area reinforcement application. To achieve this, a sheet of StarTex must continue from one side of the building around the corner for at least 200 mm and overlap adjoining sheets by at least 100 mm.Internal corners:
Internal corner reinforcement follows the same procedure as the external corners and with 100 mm overlapping of the sheets of Star- Tex. High impact areas: Prior to applying the area reinforcement an additional reinforcement layer of Baumit StarTex or Baumit StrongTex (adjoined but not overlapping!) embedded in the reinforcement mortar is applied. Keep a waiting time of at least 24 hours. In addition to the mentioned standards, refer to the valid version of theBaumit application guidelines for ETICS!
Notes and
General
Information
The air, material and subsurface temperature must be above 5° C during application and curing. Protect the facade from direct sunlight, rain and strong winds (i.e. with scaffold nets). When working with StarTex reinforcing mesh, ensure that no cavities form underneath the mesh. If using corner beads or profiles (without mesh wings) ensure that at least one sheet of the StarTex reinforcing mesh con- tinues over and around the corner to the other side. When deburring the reinforcement layer, ensure that the StarTex reinforcing mesh is not dam- aged or exposed.Written and oral application technology recommendations provided by us to assist the seller/processor are based on our experience and reflect the
current state of the art in science and practical application know-how. However, it is understood that these recommendations are non-binding. They do
not create any legal relationship or any ancillary obligations in connection with the sale contract. They do not release the buyer from its obligation to
verify the fitness of our products for the intended purpose or use by itself.quotesdbs_dbs26.pdfusesText_32[PDF] Baumschule in Michelau
[PDF] Baumstal - Ustensiles de cuison en inox 18/10 - Anciens Et Réunions
[PDF] Baunetzwoche#436 Shortlist 2016
[PDF] Baup de mook
[PDF] Baupartnerkarte herunterladen
[PDF] Bauphysikalische Grundlagen
[PDF] Bauplan Depron-Gleiter, Modell 5, M 1:1
[PDF] Bauplan PA200 Tornado
[PDF] Bauplan Slowly V2 geteilt A4
[PDF] Bauplan „ Depron-Gleiter, Modell 4 “, Massstab 1:1
[PDF] Bauportal Heft 8
[PDF] BauPuzzle
[PDF] Baur au Lac Anfahrt Tram
[PDF] bauratgeber - Volksstimme