[PDF] UNCLASSIFIED F-35 Lightning II Joint Strike Fighter (JSF) Program





Previous PDF Next PDF



f-35b - the worlds first supersonic stovl aircraft

For the first time in aviation history supersonic



dod Programs - F-35 Joint Strike Fighter (JSF) dod Programs - F-35 Joint Strike Fighter (JSF)

- F-35A Conventional Take-Off and Landing (CTOL). - F-35B Short Take-Off and Vertical Landing (STOVL). - F-35C Aircraft Carrier Variant (CV). • It is designed 



Preparation of Papers for AIAA Journals

29 jun 2018 into the engine inlet and exhaust nozzle and the F-35B short takeoff and vertical landing (STOVL) propulsion system



F-35 STOVL Performance Requirements Verification

The F-35B is the short takeoff and vertical landing (STOVL) variant of the F-35 with two challenging and unique requirements. First



DOD PROGRAMS - F-35 Joint Strike Fighter (JSF) DOD PROGRAMS - F-35 Joint Strike Fighter (JSF)

16 nov 2012 - F-35A Conventional Take-Off and Landing (CTOL). - F-35B Short Take-Off/Vertical-Landing (STOVL). - F-35C Aircraft Carrier Variant (CV). • It ...



Acoustical Environment of an F-35B Aircraft During Vertical Landings Acoustical Environment of an F-35B Aircraft During Vertical Landings

1-5. However the short take-off and vertical landing (STOVL) capability of the F-35B represents a more complicated environment than for traditional aircraft 



Marine Corps F-35Bs Conduct First Landing Aboard JS Izumo

3 oct 2021 short takeoff and vertical landing (STOVL) operations a capability that the “B” variant of the F-35 specializes in



dod Programs - F-35 Joint Strike Fighter (JSF)

- F-35A Conventional Take-Off and Landing (CTOL). - F-35B Short Take-Off/Vertical-Landing (STOVL). - F-35C Aircraft Carrier Variant (CV). • It is designed to 



Distributed STOVL Operations and Air-Mobility Support: Addressing

–vertical-landing (STOVL) operations (DSOs) by U.S. Marine Corps. F-35B Lightning II Each F-35 would load missiles and six tons of fuel after each sortie ...



F-35 Lightning II

F-35B STOVL. Performance. Top Speed: 1.6 Mach (1200mph). Combat radius: >450nm F-35B Vertical Landing (VL). The advanced control system and flight deck ...



F-35B Integrated Flight-Propulsion Control Development

The Short Take-Off Vertical Landing (STOVL) variant of the F-35 Joint Strike Fighter. (JSF) is a multirole air-ground and air-air fighter that offers the 



UNCLASSIFIED F-35 Lightning II Joint Strike Fighter (JSF) Program

30 déc. 2019 The F-35B variant will be a multi-role strike fighter aircraft to replace the AV-8B and ... STOVL - Short Takeoff and Vertical Landing.



f-35b - the worlds first supersonic stovl aircraft

For the first time in aviation history supersonic



dod Programs - F-35 Joint Strike Fighter (JSF)

F-35B Short Take-Off/Vertical-Landing (STOVL). - F-35C Aircraft Carrier Variant (CV). • It is designed to survive in an advanced threat (year 2012 and.



Backgrounder - GKN Aerospace on the Lockheed Martin F-35

landing (CTOL) the F-35B short take-off and vertical landing (STOVL) and the F-35C carrier variant. (CV) aircraft. Cockpit Transparency. The F-35 



F-35_Air_Vehicle_Technology_Overview.pdf

29 juin 2018 The Lockheed Martin F-35 Lightning II incorporates many ... and the F-35B short takeoff and vertical landing (STOVL) propulsion system.



Distributed STOVL Operations and Air-Mobility Support: Addressing

takeoff–vertical-landing (STOVL) operations (DSOs) by U.S. Marine Corps. F-35B Lightning II fighters and alternative solutions to fulfilling those require-.



BUQUE DE PROYECCIÓN ESTRATÉGICA (BPE)

Landing) des années 80. engins de débarquement à coussin d'air LCAC (Landing ... Utiliser le chasseur multi-rôles STOVL F-35B semblerait logique.



Marine Corps F-35Bs Conduct First Landing Aboard JS Izumo

3 oct. 2021 landing of two F-35B Lightning II aircraft aboard the Japanese ... short takeoff and vertical landing (STOVL) operations a.

UNCLASSIFIED F-35 Lightning II Joint Strike Fighter (JSF) Program JOINT STRIKE FIGHTER the next generation strike fighter

UNCLASSIFIED

RCS: DD-A&T(Q&A)823-198

F-35 Lightning II Joint Strike Fighter (JSF) Program (F-35)

As of FY 2021 President's Budget

Defense Acquisition Management

Information Retrieval

(DAMIR)

UNCLASSIFIED

UNCLASSIFIED

F-35 December 2019 SAR

Table of Contents

Common Acronyms and Abbreviations for MDAP Programs 3

Program Information 5

Responsible Office 5

References 6

Mission and Description 7

Executive Summary 8

Threshold Breaches 13

Schedule 14

Performance 18

Track to Budget 22

Cost and Funding 26

Charts 69

Risks 73

Low Rate Initial Production 77

Foreign Military Sales 78

Nuclear Costs 79

Unit Cost 80

Cost Variance 86

Contracts 94

Deliveries and Expenditures 100

Operating and Support Cost 101

UNCLASSIFIED 2

UNCLASSIFIED

F-35 December 201 9 SAR

Common Acronyms and Abbreviations for MDAP Programs Acq O&M - Acquisition-Related Operations and Maintenance

ACAT - Acquisition Category

ADM - Acquisition Decision Memorandum

APB - Acquisition Program Baseline

APPN - Appropriation

APUC - Average Procurement Unit Cost

$B - Billions of Dollars

BA - Budget Authority/Budget Activity

Blk - Block

BY - Base Year

CAPE - Cost Assessment and Program Evaluation

CARD - Cost Analysis Requirements Description

CDD - Capability Development Document

CLIN - Contract Line Item Number

CPD - Capability Production Document

CY - Calendar Year

DAB - Defense Acquisition Board

DAE - Defense Acquisition Executive

DAMIR - Defense Acquisition Management Information Retrieval

DoD - Department of Defense

DSN - Defense Switched Network

EMD - Engineering and Manufacturing Development

EVM - Earned Value Management

FOC - Full Operational Capability

FMS - Foreign Military Sales

FRP - Full Rate Production

FY - Fiscal Year

FYDP - Future Years Defense Program

ICE - Independent Cost Estimate

IOC - Initial Operational Capability

Inc - Increment

JROC - Joint Requirements Oversight Council

$K - Thousands of Dollars

KPP - Key Performance Parameter

LRIP - Low Rate Initial Production

$M - Millions of Dollars

MDA - Milestone Decision Authority

MDAP - Major Defense Acquisition Program

MILCON - Military Construction

N/A - Not Applicable

O&M - Operations and Maintenance

ORD - Operational Requirements Document

OSD - Office of the Secretary of Defense

O&S - Operating and Support

PAUC - Program Acquisition Unit Cost

UNCLASSIFIED 3

UNCLASSIFIED

F-35 December 2019 SAR

PB - President's Budget

PE - Program Element

PEO - Program Executive Officer

PM - Program Manager

POE - Program Office Estimate

RDT&E - Research, Development, Test, and Evaluation

SAR - Selected Acquisition Report

SCP - Service Cost Position

TBD - To Be Determined

TY - Then Year

UCR - Unit Cost Reporting

U.S. - United States

USD(AT&L) - Under Secretary of Defense (Acquisition, Technology and Logistics) USD(A&S) - Under Secretary of Defense (Acquisition and Sustainment)

UNCLASSIFIED 4

UNCLASSIFIED

F-35 December 2019 SAR

Program Information

Program Name

F-35 Lightning II Joint Strike Fighter (JSF) Program (F-35)

DoD Component

DoD

Joint Participants

United States Navy; United States Air Force; United States Marine Corps; United Kingdom; Italy; The Netherlands; Turkey;

Canada; Australia; Denmark; Norway

The F-35 Program is a joint DoD program for which Service Acquisition Executive Authority alternates between the

Department of the Navy (DoN) and the Department of the Air Force (DAF), and currently resides with the DoN.

Responsible Office

Lt Gen Eric Fick

F-35 Lightning II Program Office

200 12th St South

Arlington, VA 22202-5402

Phone: 703-601-5602

Fax: 703-602-7649

DSN Phone: 329-5650

DSN Fax:

Date Assigned: July 15, 2019

UNCLASSIFIED 5

UNCLASSIFIED

F-35 December 2019 SAR

References

F-35 Aircraft

SAR Baseline (Development Estimate)

Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated March 26, 2012

Approved APB

Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated February 5, 2020

F-35 Engine

SAR Baseline (Development Estimate)

Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated March 26, 2012

Approved APB

Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated March 22, 2019

UNCLASSIFIED 6

quotesdbs_dbs2.pdfusesText_2
[PDF] f 35 stovl landing video

[PDF] f 35 stovl performance requirements verification

[PDF] f 35 stovl takeoff

[PDF] f 35 stovl takeoff distance

[PDF] f 35 supercruise

[PDF] f 35 timeline

[PDF] f 35 work breakdown structure

[PDF] f a cotton group theory pdf

[PDF] f p santangelo

[PDF] f sd scg 4000

[PDF] f sharp tutorial pdf

[PDF] f35 capabilities

[PDF] f35 failure

[PDF] f35 for sale

[PDF] f35 sensors