What are the 5 stages of building a house near Lagos?
For instance, while a single-storey home with a standard design usually takes 4 to 6 months to complete, provided that there are no unforeseen delays, a multi-storey or custom home usually takes a little longer..
What are the 5 stages of building a house near Lagos?
In Nigeria, there are few existing National Standards relating to general construction (buildings, roads etc) and many of them are not even known (Bamisile, 2004).
As a result, the designers use mainly British and American Standards and Codes despite the fact that local requirements are often different..
What are the stages of building construction in Nigeria?
In Nigeria, there are few existing National Standards relating to general construction (buildings, roads etc) and many of them are not even known (Bamisile, 2004).
As a result, the designers use mainly British and American Standards and Codes despite the fact that local requirements are often different..
What are the stages of building construction in Nigeria?
The construction phase involves site preparation, excavation, foundation, framing, masonry work, roofing, interior finishes, and exterior finishes.
Finally, post-construction involves the final walkthrough and the handover of the completed building..
What are the steps in the construction process?
Five stages of building a house in Nigeria?
Planning.
House Type.Building Budget.Purchase land and architectural design.Excavation, foundation, and building processes.Framing, rough-ins, and finishing..